Bombardier Innovia APM 300R C801B
ManufacturerCRRC Puzhen Alstom Transportation Systems (Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen)
Built atWuhu, Anhui, China
Family nameInnovia APM
ReplacedBombardier Innovia APM 100 C801
Constructed2019 – 2022
Number built19 vehicles
FormationSingle vehicles (M) that can be coupled to form 2-car trains
Fleet numbers133 – 151
OperatorsSMRT Trains Ltd (SMRT Corporation)
DepotsTen Mile Junction
Lines served BPLRT  Bukit Panjang LRT line
Specifications
Car body constructionAluminum
Doors2 × 2 per car
Maximum speed55 km/h (34 mph) (design)
48 km/h (30 mph) (service)
Traction systemAlstom MITrac (500 series) IGBTVVVF
Electric system(s)600 V 50 Hz 3-phase AC third rail
Current collector(s)Collector shoe
AAR wheel arrangementA-A
Safety system(s)Alstom Cityflo 650 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI
Coupling systemDellner
Track gauge2,642-millimetre (8 ft 8 in) central guideway with rubber tyres

The Bombardier Innovia APM 300R C801B (APM 300R) is the third generation of automated people mover (APM) trains built by CRRC Puzhen Alstom Transportation Systems (joint venture of Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen) for the Bukit Panjang LRT line, to replace the existing C801 trains built in 1999.[1] The C801B trains are also the first of its kind to reuse the retro AC third rail shoes compared to the newer Light Rail lines around the world that utilises the APM 300 system that have been built with DC third rail instead of AC.

Overview

As the aging first generation trains drew near to its deadline service of 20 years, the LTA decided that the first generation trains were due for replacement instead of a refurbishment. This is in part of their renewal programme for the next 10 years for the BPLRT, including rail replacement and signalling upgrades. The LTA then awarded the project to Bombardier Transportation (the manufacturer of the BPLRT train cars at the time, now merged with Alstom) to procure 19 replacement train cars for the BPLRT.[2] However, instead of using back the same technology for the train line, the LTA opted for Bombardier's latest technology on the Innovia system - Innovia APM 300. It is said to be much more reliable in many ways, including a much more robust braking and propulsion system, a higher reliability air conditioning system and many more. But with the BPLRT line utilising the same third rail technology as the APM 100, modification works on the APM 300 cars were done to work with AC third rail power supply. Hence, APM 300R was created, specifically for such conditions. The new trains were revealed on 3 December 2019, spotting a sleeker design and enhanced features.[3][4]

Unlike the CX-100 C801 and APM 100 C801A, the APM 300R C801B will feature more efficient MITrac AC traction motors and VVVF inverters, controlled by transistors instead of thyristors.

Train formation

The configuration of a C801B in revenue service is just the one car. With both the motors and the third rail current collectors, the train cars can be coupled up to 2 cars during service.

The car numbers of the trains range from 133 to 151. Individual cars are assigned a three-digit serial number by the rail operator SMRT Trains. A trainset consists of one motor car, e.g. set 133 is car 133. The first digit is always a 1, while the last two digits identify the car number.

References

  1. "Bombardier Wins Contract to Upgrade Singapore's Bukit Panjang Light Rail Transit Line - Bombardier". www.bombardier.com. Archived from the original on 8 April 2019. Retrieved 23 October 2019.
  2. "Parliament: $344m overhaul of Bukit Panjang LRT; smoother rides expected from 2022". The Straits Times. 7 March 2018. Archived from the original on 2 May 2019. Retrieved 3 December 2019.
  3. Tan, Christopher (3 December 2019). "Khaw Boon Wan confident overhauled Bukit Panjang LRT will live up to expectations". CNA. Archived from the original on 4 December 2019. Retrieved 4 December 2019.
  4. "New BPLRT trains to enter service from Q2 2021, renewal to be completed by 2024". Mothership.sg. 3 December 2019. Archived from the original on 3 December 2019. Retrieved 3 December 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.