Canary Wharf | |
---|---|
Canary Wharf Location of Canary Wharf in Greater London | |
Location | Canary Wharf |
Local authority | London Borough of Tower Hamlets |
Managed by | London Underground |
Owner | Transport for London |
Number of platforms | 2 |
Accessible | Yes[1] |
Fare zone | 2 |
OSI | Canary Wharf Canary Wharf Heron Quays [2] |
London Underground annual entry and exit | |
2018 | 43.62 million[3] |
2019 | 47.69 million[4] |
2020 | 13.36 million[5] |
2021 | 18.29 million[6] |
2022 | 30.68 million[7] |
Railway companies | |
Original company | London Regional Transport |
Key dates | |
17 September 1999 | Opened |
Other information | |
External links | |
WGS84 | 51°30′13″N 0°01′07″W / 51.50361°N 0.01861°W |
London transport portal |
Canary Wharf is a London Underground station at Canary Wharf and is on the Jubilee line, between Canada Water and North Greenwich stations. The station is located in Travelcard Zone 2[8] and was opened on 17 September 1999[9] as part of the Jubilee Line Extension. Over 40 million people pass through the station each year, making it second busiest on the London Underground outside Central London after Stratford, and also the busiest that serves only a single line.[note 1]
History
Before the arrival of the Jubilee line, London's Docklands had suffered from relatively poor public transport. Although the Docklands Light Railway station at Canary Wharf had been operating since 1987, by 1990 it was obvious that the DLR's capacity would soon be reached. The Jubilee line's routing through Canary Wharf was intended to relieve some of this pressure.[10]
The tube station was intended from the start to be the showpiece of the Jubilee Line Extension, and the contract for its design was awarded in 1990 to the architect Sir Norman Foster. It was constructed, by a Tarmac Construction / Bachy UK Joint Venture,[11] in a drained arm of the former dock, using a simple "cut and cover" method to excavate an enormous pit 24 metres (78 ft) deep and 265 metres (869 ft) long. The size of the interior has led to it being compared to a cathedral, and it has even been used to celebrate a wedding. Foster based the design upon previous work done for the Bilbao metro, colloquially named "Fosteritos".[12] However, the main reason for the station's enormous dimensions was the great number of passengers predicted; as many as 50,000 daily. It remains the only tube station to accommodate rush hour demand.[12] These predictions have been outgrown, with as many as 69,759 on weekdays recorded in 2006[13] and within a decade it had become the only station outside of Zone 1 to be ranked within the top-ten most used stations.[14]
Canary Wharf station and the Jubilee line Extension itself were partly funded by the owners of the Canary Wharf complex, to make it more accessible to commuters. The Canary Wharf group had committed to £500 million of funding for the capital costs, over 24 years. They were, however, underwhelmed by the proposed service frequency.[14] Only five years after the construction of the extension, capacity issues started becoming apparent and upgrades were required. The first step was the lengthening of the trains from 6 to 7 cars. This was done at the end of 2005. The second step was to replace the conventional Jubilee line signalling with the Thales S40 moving-block system. This was eventually introduced into service during 2011 after many delays and teething problems and allows a more intensive timetable to operate with 30 trains per hour running in the peaks.[15]
In a 2013 poll conducted by YouGov, it was voted as the "Most Loved" tube station in London[16] and "despite its immense volume [it is] comfortable and inviting".[12] Five years after opening, a study concluded that the new station had increased land values by £2 billion.[14]
In January 2019, a person died after falling from an escalator; this led to the station being temporarily closed.[17]
The station today
Above ground there is little sign of the vast interior: two curved glass canopies at the east and west ends of the station cover the entrances and allow daylight into the ticket hall below. The Jubilee Park, a public park is situated between the two canopies, above the station concourse. It had originally been intended that the infilled section of the dock would be reinstated above the station, but this proved impractical because of technical difficulties and the park was created instead.[18]
As with the other below-ground stations on the Jubilee Line extension, both station platforms are equipped with platform screen doors. There are 20 escalators and 3 lifts serving the 2 platforms.[14]
Canary Wharf station has become one of the busiest stations on the network, serving the ever-expanding Canary Wharf business district. Although it shares its name with the Docklands Light Railway station at Canary Wharf, the two are not directly integrated (in fact, Heron Quays DLR station is nearer at street level). Initially, a direct interchange between the DLR had been hoped for, but development in the intervening years had prevented this goal.[14] All three stations are connected via shopping malls underneath Jubilee Park, Cabot Square and Canada Square. Out-of-station interchange within twenty minutes between any two of the stations entails no additional charge.[2] On 24 May 2022, the Canary Wharf railway station on the Elizabeth Line was opened.[19]
Canary Wharf can be used to reverse trains from both the east and the west. A scissors crossover west of the station allows trains from Stanmore to enter either the east- or west-bound platform at the station, and trains from Stratford enter the normal westbound platform and can use this scissors crossover to reverse back towards Stratford.[20]
Services and connections
The station is located on the Jubilee line between Canada Water and North Greenwich in Travelcard Zone 2. The typical off-peak service, in trains per hour (tph) is:
Night Tube services, running on Friday and Saturday nights, were introduced in October 2016. Trains run every 10 minutes on the entire line.[22]
- 6 tph Stanmore – Stratford[23]
Preceding station | London Underground | Following station | ||
---|---|---|---|---|
Canada Water towards Stanmore |
Jubilee line | North Greenwich towards Stratford | ||
Out of system interchange | ||||
Preceding station | DLR | Following station | ||
West India Quay | Docklands Light Railway transfer at Canary Wharf |
Heron Quays towards Lewisham | ||
Westferry (eastbound West India Quay Bypass One-way operation |
Terminus | |||
Canary Wharf | Docklands Light Railway transfer at Heron Quays |
South Quay towards Lewisham | ||
Out of station interchange | ||||
Preceding station | Elizabeth line | Following station | ||
Whitechapel towards Paddington |
Elizabeth line transfer at Canary Wharf |
Custom House towards Abbey Wood |
Future proposals
Canary Wharf Group (CWG) has called for the Bakerloo line extension to Lewisham to be diverted to Surrey Quays and Canary Wharf from Old Kent Road, before running to Charlton, CWG suggest the current Jubilee Line not being able to cope with demand from the yet to be approved new Canada Water scheme.[24] CWG has also proposed a new underground line between Euston and Canary Wharf which is being considered by the government.[25]
In popular culture
On 9 January 2013, the station appeared on a £1.28 British postage stamp as part of a set commemorating the 150th anniversary of the first London underground train journey. The stamp's captions read "Jubilee Line at Canary Wharf" and "1999". The Canary Wharf stamp represented the most modern phase of the Underground in the set of six stamps.[26]
The station was used as a filming location for some scenes of Danny Boyle's 2002 film 28 Days Later. In April 2016, Canary Wharf station was used as a filming location for an Imperial base in the Star Wars film Rogue One. The location shoot took place between midnight and 4 am, when the station was closed to the public, and was commented on by Star Wars fans using Twitter.[27][28][29]
Connections
London Buses routes 135, 277, D7 and night routes N277 and N550 serve the tube station.[30]
Gallery
- Concourse and concourse roof of Canary Wharf station
- View from the down escalator at the west end of the station on the day of the London Marathon 2009
- Canary Wharf platforms
See also
Notes and references
Notes
- ↑ The DLR station is a completely separate station itself.
References
- ↑ "Step free Tube Guide" (PDF). Transport for London. April 2021. Archived (PDF) from the original on 15 May 2021.
- 1 2 "Out-of-Station Interchanges" (XLSX). Transport for London. 24 May 2022. Retrieved 5 June 2022.
- ↑ "Station Usage Data" (CSV). Usage Statistics for London Stations, 2018. Transport for London. 23 September 2020. Archived from the original on 14 January 2023. Retrieved 11 October 2023.
- ↑ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2019. Transport for London. 23 September 2020. Archived from the original on 9 November 2020. Retrieved 9 November 2020.
- ↑ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2020. Transport for London. 16 April 2021. Retrieved 1 January 2022.
- ↑ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2021. Transport for London. 12 July 2022. Retrieved 7 September 2022.
- ↑ "Station Usage Data" (XLSX). Usage Statistics for London Stations, 2022. Transport for London. 4 October 2023. Retrieved 10 October 2023.
- ↑ Standard Tube Map (PDF) (Map). Not to scale. Transport for London. November 2022. Archived (PDF) from the original on 7 November 2022. Retrieved 12 November 2022.
- ↑ Horne, Mike (2000). The Jubilee Line. Capital Transport. p. 80. ISBN 1-85414-220-8.
- ↑ "The DLR at 30: The trains that brought the Docklands back to life". I News. 31 August 2017. Retrieved 4 October 2018.
- ↑ Schmidlin website Archived 6 February 2007 at the Wayback Machine
- 1 2 3 Green, Oliver (2012). The Tube:Station to Station on the London Underground. Botley, Oxford: Shire Publications Ltd. pp. 57, 114. ISBN 978-0-74781-227-2.
- ↑ TfL statistics
- 1 2 3 4 5 Glover, John (2010). London's Underground (11th ed.). Hersham: Ian Allan Publishing Ltd. pp. 127–131. ISBN 978-0-7110-3429-7.
- ↑ Now for the Northern – Another Underground upgrade gets into its stride Archived 30 August 2015 at the Wayback Machine
- ↑ Londoners say Bank Tube station is capital's worst BBC, 23 April 2013
- ↑ Kevin Rawlinson (7 January 2019). "Commuter dies after falling from escalator at Canary Wharf tube station | UK news". The Guardian. Retrieved 8 January 2019.
- ↑ "Jubilee Park, Canary Wharf". Garden Visit. Retrieved 4 October 2018.
- ↑ Lydall, Ross (4 May 2022). "Crossrail opening date finally announced". Evening Standard. London. Retrieved 11 December 2023.
- ↑ Mitchell, Bob (2003). Jubilee Line Extension: From Concept to Completion. ICE Publishing. p. 145. ISBN 978-0727730282.
- 1 2 3 Feather, Clive (6 June 2016). "Jubilee Line". Clive's Underground Line Guides. Archived from the original on 19 August 2016. Retrieved 19 August 2016.
- ↑ "The Night Tube". Transport for London. Archived from the original on 19 August 2016. Retrieved 19 August 2016.
- ↑ Jubilee line joins London's busier than expected night tube | UK news | The Guardian
- ↑ Darryl Chamberlain (30 August 2018). "Extend Bakerloo Line to Charlton, Canary Wharf's owners demand – The Charlton Champion". Charltonchampion.co.uk. Retrieved 3 December 2018.
- ↑ Smale, Katherine (11 April 2019). "Canary Wharf Group in talks about rail link to Euston". New Civil Engineer. Retrieved 25 April 2019.
- ↑ "Royal Mail celebrates 150 years of the London Underground". Royal Mail (Press release). 8 January 2013. Archived from the original on 16 January 2013. Retrieved 13 January 2013.
- ↑ Stolworthy, Jacob (7 April 2016). "Rogue One trailer: fans spot Canary Wharf tube station in Star Wars prequel teaser". The Independent. Retrieved 8 April 2016.
- ↑ Gani, Aisha (7 April 2016). "Star Wars: Rogue One clip apparently filmed at London tube station". The Guardian. Retrieved 8 April 2016.
- ↑ McEwan, Cameron K (25 October 2016). "Here's what we know about the new Star Wars film". Metro. Retrieved 22 December 2016.
- ↑ "Buses from Canary Wharf" (PDF). TfL. May 2022. Retrieved 20 May 2022.