Düsseldorf-Bilk station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Through station | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | Friedrichstr. 145 Bilk, Düsseldorf, North Rhine-Westphalia Germany | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 51°12′28″N 6°46′37″E / 51.207713°N 6.776874°E | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 2 island platforms | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tracks | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Station code | 1405[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
DS100 code | KDBI (regional platforms) KDBH (S-Bahn platforms)[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IBNR | 8001585 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Category | 4[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fare zone | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | www.bahnhof.de | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1891[5] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Düsseldorf-Bilk station is a through station in the district of Bilk in the city of Düsseldorf in the German state of North Rhine-Westphalia. It has two platforms and it is classified by Deutsche Bahn as a category 4 station.[1]
History
The station is on the new line opened by the Prussian state railways on 1 October 1891 between the Hamm Railway Bridge and Gerresheim as part of the construction of Düsseldorf Hauptbahnhof.[6] The station building built in 1891 was demolished in 1986,[5] as part of the rebuilding of the line for the establishment of Rhine-Ruhr S-Bahn lines S 8. On 18 March 2022, a new second platform for regional train services opened.[7]
Services
The station is served by three S-Bahn lines:[8]
- S 8 between Mönchengladbach and Wuppertal-Oberbarmen or Hagen, every 20 minutes
- S 11 between Bergisch Gladbach and Düsseldorf Airport, every 20 minutes
- S 28 between Mettmann Stadtwald or Wuppertal and Kaarster See, every 20 minutes
Since March 2022, the following five regional train services also serve the station:
- RE 4 between Aachen and Dortmund, every 60 minutes
- RE 6 between Cologne/Bonn Airport and Minden (Westf), every 60 minutes
- RE 10 between Kleve and Düsseldorf, every 30 minutes
- RE 13 between Venlo and Hamm (Westf), every 60 minutes
- RB 39 between Bedburg (Erft) and Düsseldorf, every 60 minutes on weekdays
It is served by two bus routes operated by Rheinbahn at 20-minute intervals: 835 and 836.[8]
Stadtbahn
The Düsseldorf Stadtbahn has a tunnel from Düsseldorf-Bilk station to Düsseldorf-Wehrhahn station, known as the Wehrhahn line (German: Wehrhahn-Linie). This 3.5 km tunnel was completed in 2016. Just as every other underground line opened previously in Düsseldorf, the Wehrhahn line is a replacement for current surface tram lines. The trams on this line are entering the new tunnel over a ramp at Bilk station and run from there underneath the city centre towards the north-east, where they are emerging shortly before Wehrhahn railway station. Five new underground stations and the station Heinrich-Heine-Allee are part of the line, which serve an estimated daily passenger volume of approximately 53,000. These new stations are Pempelforter Straße, Schadowstraße, the existing station Heinrich-Heine-Allee, Benrather Straße, Graf-Adolf-Platz and Kirchplatz (Düsseldorf) in the direction from Wehrhahn station to Bilk station. The new lines are the U71, U72, U73 and U83.
References
Footnotes
- 1 2 3 "Stationspreisliste 2024" [Station price list 2024] (PDF) (in German). DB Station&Service. 24 April 2023. Retrieved 29 November 2023.
- ↑ Railway Atlas 2017, p. 201.
- ↑ "Wabenplan für das Rheinbahn-Bedienungsgebiet" (PDF). Rheinbahn. 1 August 2008. Retrieved 4 November 2019.
- ↑ "Ticketberater". Verkehrsverbund Rhein-Sieg. Retrieved 12 June 2020.
- 1 2 Joost, André. "Düsseldorf-Bilk station operations". NRW Rail Archive (in German). Retrieved 18 June 2020.
- ↑ Joost, André. "Line 2550: Aachen - Kassel". NRW Rail Archive (in German). Retrieved 18 June 2020.
- ↑ ""Sehnsüchtig erwartet!" - Oberbürgermeister Dr. Keller begrüßt den Regionalhalt Düsseldorf-Bilk". www.duesseldorf.de (in German). City of Düsseldorf press office. 17 March 2022. Retrieved 2022-03-24.
- 1 2 Joost, André. "Düsseldorf-Bilk station". NRW Rail Archive (in German). Retrieved 18 June 2020.
Sources
- Eisenbahnatlas Deutschland [German railway atlas]. Schweers + Wall. 2017. ISBN 978-3-89494-146-8.