Haneda Airport Access Line
Overview
Native name羽田空港アクセス線
StatusUnder Construction
LocaleTokyo
Termini
Service
TypeHeavy rail
History
Planned openingFiscal 2031 (tentative)
Technical
Number of tracks2
Track gauge1,067 mm (3 ft 6 in)
Electrification1,500 V DC, overhead lines

The Haneda Airport Access Line (羽田空港アクセス線, Haneda-kūkō akusesu-sen) is a railway service proposed by East Japan Railway Company that would link Haneda Airport directly to central Tokyo. The plan will consist of three branches departing from Haneda and branching west towards Osaki and Shinjuku, north towards Shinbashi and Tokyo Station, and east towards Shin-Kiba.[1]

In 2021, JR East announced that they have received Ministry of Land, Infrastructure, Transport and Tourism approval for the project and intended to start construction in 2022, for completion by 2029.[2] A 2023 revision has pushed back the opening date to fiscal 2031.[3] Construction of the line eventually began on 2 June 2023.[4][5]

History

Due to the growing demand of air travelers using Haneda Airport, especially international travelers, East Japan Railway Company, JR East, officially announced in the “JR East Group Management Vision V” issued in 2013 that they aimed to improve the accessibility to the airport.[6]

In 2014, JR East released its fundamental construction plan for the accessibility improvement.[7] According to the plan, an existing freight line running from Tamachi Station located on Yamanote Line will be extended, connecting directly to the airport through an underwater tunnel. The newly-constructed section is expected about 5 km (3.1 mi) long, running from the existing Tokyo Freight Terminal to a new Haneda Airport New Station (羽田空港新駅, Haneda-kūkō shin-eki) to be located between Terminal 1 and Terminal 2.[8] Therefore, the construction cost is expected to be minimized, estimated to be approximately ¥320 billion.

In the JR East Group Management Vision "Move Up” issued in 2018, JR East decided to construct three conventional lines departing from the airport.[9]

In 2019, JR East officially launched the environmental assessment for the new lines, and the construction for the new train link is expected to be completed around 2029.[10]

In early April 2023, JR East announced that it had chosen to build the East Yamanote Route from Tokyo Station.[11] On the same date, the company announced that a construction groundbreaking ceremony would take place at a later date in June of that year. The opening date is expected to take place sometime in fiscal 2031, two years later than the initial expected opening date set for 2029.[3] Construction of the new line is estimated to cost about ¥280 billion (2022) (US$2.14 billion).[3]

Construction of the line officially began on 2 June 2023 with the aforementioned groundbreaking ceremony going ahead as scheduled.[4][5]

Routes and expected effects

Haneda Airport Access Line
Ueno-Tokyo through service
Tamachi
Keiyo through service
Saikyo through service
Tokyo Teleport
Oimachi
Tokyo Freight Terminal
Haneda Airport (new station)

The line consists of an extension of an existing freight line to the airport, upgrading of track on the existing freight line, two connecting spurs to the Rinkai Line, and a connecting spur to the Ueno-Tokyo Line, which allows three access routes to the airport.

East Yamanote Route

The East Yamanote Route was the option finalized by JR East in 2023.[11] It will run from the airport station located near Terminals 1 and 2 in Haneda Airport via the Tokyo Freight Terminal Station to a point near Tamachi Station, using an unused freight line between Tamachi and Tokyo Freight Terminal to connect to the Tokaido Main Line (Ueno-Tokyo Line). By running through trains on the Ueno–Tokyo Line, through service can be offered to Tokyo Station, Ueno Station, and northbound lines including the Takasaki Line, Utsunomiya Line, and Joban Line, allowing service to the northern suburbs of Tokyo. Since the East Yamanote Route will directly link Tokyo Station and the airport, accessibility to the airport is expected to be greatly improved. Travel times between Tokyo and Haneda are estimated to decrease from the current 28 minutes to 18 minutes.[12]

West Yamanote Route

The West Yamanote Route connects the new line to Oimachi Station on the Rinkai Line, which operates as a through service with the Saikyo Line connecting to major terminal stations on the west side of the Yamanote Line including Osaki, Ebisu, Shibuya, Shinjuku, and Ikebukuro, as well as points north in Tokyo and Saitama Prefecture. Travel time between Shinjuku and Haneda will be reduced from 43 minutes at present to 23 minutes.[12]

Coastal Area Route

The Coastal Area Route connects Tokyo Freight Terminal to the Rinkai Line for Odaiba (Tokyo Teleport Station) and the Tokyo waterfront. This also allows for future through service to the Keiyo Line for Maihama (Tokyo Disney Resort) and points east in Chiba Prefecture. The travel time between Haneda and Shin-Kiba Station on the Keiyo Line will decrease from 41 minutes to 20 minutes.[12]

This route is also planned to connect to the Tokyo Rinkai Subway Line, a new subway line under planning between Tokyo and Odaiba. Through service to the Tokyo Rinkai Subway Line as well as the Tsukuba Express (through a future Tokyo-Akihabara connector) is under consideration.[13]

See also

References

  1. "Jr羽田空港アクセス線、鉄道事業許可の詳細。2029年度開業めざす | タビリス". 20 January 2021.
  2. "JR East's Haneda Airport Access Line to Open in FY 2029". 21 January 2021.
  3. 1 2 3 "JR East pushes back planned opening of new Haneda Airport line by two years". The Japan Times. 5 April 2023. Archived from the original on 5 April 2023. Retrieved 5 April 2023.
  4. 1 2 "「羽田空港アクセス線」起工式 東京-羽田が18分、31年度開業へ:朝日新聞デジタル" ["Haneda Airport Access Line" Groundbreaking Ceremony: Tokyo to Haneda Airport in 18 minutes with a 2031 completion]. Asahi Shimbun Digital (in Japanese). 2 June 2023. Archived from the original on 2 June 2023. Retrieved 3 June 2023.
  5. 1 2 "JR東日本、羽田空港アクセス線の起工式 31年度開業" [JR East groundbreaking ceremony for Haneda Airport access line, services to begin in 2031]. Nihon Keizai Shimbun Online (in Japanese). 2 June 2023. Archived from the original on 2 June 2023. Retrieved 3 June 2023.
  6. "JR East Group Management Vision V" (PDF). Retrieved 2019-05-17.
  7. "JR East eyes new, faster access to Haneda airport from central Tokyo". Japan Times.
  8. "Ministry of Land, Infrastructure, Transport and Tourism permits Haneda Airport Access Line". 20 January 2021. Retrieved 2021-01-25.
  9. "JR East eyes new, faster access to Haneda airport from central Tokyo". The Japan Times Online. 2014-08-19. ISSN 0447-5763. Retrieved 2019-05-12.
  10. "Environmental test for new train link to Haneda to begin in spring". Kyodo News. 2019-02-10. Retrieved 2019-05-17.
  11. 1 2 "JR東日本,羽田空港アクセス線(仮称)の工事に着手へ" [JR East to start construction of Haneda Airport Access Line]. Japan Railfan Magazine Online (in Japanese). 5 April 2023. Archived from the original on 5 April 2023. Retrieved 5 April 2023.
  12. 1 2 3 "JR East Group Management Vision "Move Up" 2027" (PDF). Retrieved 2019-05-17.
  13. "臨海地下鉄で「つくば~羽田空港」直結!? "東京~有明"事業計画発表 途中駅は5つ". 乗りものニュース (in Japanese). Retrieved 2023-02-10.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.