Huagong 化工 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Chaoyang District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 7 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 28, 2014 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Huagong Location in central Beijing |
Huagong Station (Chinese: 化工站; pinyin: Huàgōng Zhàn; lit. 'chemical engineering station') is a station on Line 7 of the Beijing Subway. It was opened on December 28, 2014 as a part of the stretch between Beijing West railway station and Jiaohuachang and is located between Baiziwan and Nanlouzizhuang.[1]
It is located in Chaoyang District southeast of the interchange of the East 4th Ring Road Middle and Guangqu Road, on the eastern side of the former Beijing Chemical Engineering 2nd Plant (北京化工二厂)[2] in a former heavy industrial area that has significant heavy metal soil contamination.[3]
Station layout
The station has an underground island platform.
Exits
There are 4 exits, lettered A, C, and D. Exit D is accessible.
References
- ↑ "Beijing opens four new subway lines". Xinhua. Retrieved 28 December 2014.
- ↑ 北京市规划委员会关于轨道交通7号线沿线车站站名命名预案的公示书. Beijing Municipal Planning Committee (北京市规划委员会). 2013-08-29. Archived from the original on 2015-09-23. Retrieved 2013-10-15.
- ↑ 华隧参建北京地铁第一条泥水盾构隧道单线顺利贯通. 广东华隧建设股份有限公司. 2013-04-17. Archived from the original on 2013-10-21. Retrieved 2013-10-15.
39°53′15″N 116°30′12″E / 39.887369°N 116.503439°E