Indian Point Energy Center
Holtec Indian Point Energy Center (I.P.E.C.) seen from across the Hudson River
CountryUnited States
LocationBuchanan, Westchester County, New York State
Coordinates41°16′11″N 73°57′8″W / 41.26972°N 73.95222°W / 41.26972; -73.95222
StatusInactive (Under Decommissioning Process)
Construction beganUnit 1: May 1, 1956
Unit 2: October 14, 1966
Unit 3: November 1, 1968
Commission dateUnit 1: October 1, 1962
Unit 2: August 1, 1974
Unit 3: August 30, 1976
Decommission dateUnit 1: October 31, 1974
Unit 2: April 30, 2020
Unit 3: April 30, 2021
Construction cost$2.450 billion (2007 USD, Units 2–3 only)[1]
($3.35 billion in 2022 dollars[2])
Owner(s)Holtec International
Operator(s)Holtec International
Nuclear power station
Reactor typePWR
Reactor supplierWestinghouse
Cooling sourceHudson River
Thermal capacity1 × 615 MWth (decommissioned)
1 × 3216 MWth (decommissioned)
1 × 3216 MWth (decommissioned)
Power generation
Make and modelUnits 2–3: WH 4-loop (DRYAMB)
Units decommissioned1 × 257 MW
1 × 1020 MW
1 × 1040 MW
Nameplate capacity1040 MW
Capacity factor84.50% (2017)
73% (lifetime)
Annual net output15,249 GWh (2017)
External links
Websitehttps://holtecinternational.com/communications-and-outreach/indian-point/
CommonsRelated media on Commons

Indian Point Energy Center (I.P.E.C.) is a three-unit nuclear power plant station located in Buchanan, just south of Peekskill, in Westchester County, New York. It sits on the east bank of the Hudson River, about 36 miles (58 km) north of Midtown Manhattan. The facility has permanently ceased power operations as of April 30, 2021. Before its closure, the station's two operating reactors generated about 2,000 megawatts (MWe) of electrical power, about 25% of New York City's usage.[3] The station is owned by Holtec International, and consists of three permanently deactivated reactors, Indian Point Units 1, 2, and 3. Units 2 and 3 were Westinghouse pressurized water reactors. Entergy purchased Unit 3 from the New York Power Authority in 2000 and Units 1 and 2 from Consolidated Edison in 2001.

The original 40-year operating licenses for Units 2 and 3 expired in September 2013 and December 2015, respectively. Entergy had applied for license extensions and the Nuclear Regulatory Commission (NRC) was moving toward granting a twenty-year extension for each reactor. However, due to a number of factors including sustained low wholesale energy prices that reduced revenues, as well as pressure from local environmental groups and then-Governor of New York Andrew Cuomo, it was announced that the plant would shut down by 2021.[4][5] The plant permanently stopped generating energy on April 30, 2021.[6][7] About 1,000 employees lost their jobs as a result of the shutdown.[8]

As a result of the permanent shutdown of the plant, three new natural-gas fired power plants: Bayonne Energy Center, CPV Valley Energy Center, and Cricket Valley Energy Center were built, with a total capacity of 1.8 GW, replacing 90% of the 2.0 GW of carbon-free electricity previously generated by the plant.[6] As a consequence, New York is expected to struggle to meet its climate goals.[9][3]

Unit 3 currently holds the world record for the longest uninterrupted operating period for a light water commercial power reactor. This record is 753 days of continuous operation, and was set on April 30, 2021 for the operating cycle beginning on April 9, 2019. Unit 3 operated at or near full output capacity for the entire length of the cycle.[10] This record was previously held by Exelon's LaSalle Unit 1 with a record of 739 continuous days, set in 2006.

Reactors

History and design

The reactors are built on land that originally housed the Indian Point Amusement Park, but was acquired by Consolidated Edison (ConEdison) on October 14, 1954.[11] Indian Point 1, built by ConEdison, was a 275-megawatt Babcock & Wilcox supplied [12] pressurized water reactor that was issued an operating license on March 26, 1962 and began operations on September 16, 1962.[13] The first core used a thorium-based fuel with stainless steel cladding, but this fuel did not live up to expectations for core life.[14] The thorium-based core shutdown in October 1965.[15] The plant was operated with uranium dioxide fuel for the remainder of its life. The reactor was shut down on October 31, 1974, because the emergency core cooling system did not meet regulatory requirements. All spent fuel was removed from the reactor vessel by January 1976, but the reactor still stands.[16] The licensee, Entergy, plans to decommission Unit 1 when Unit 2 is decommissioned.[17]

The two additional reactors, Indian Point 2 and 3, are four-loop Westinghouse pressurized water reactors both of similar design. Units 2 and 3 were completed in 1974 and 1976, respectively. Unit 2 had a gross generating capacity of 1,032 MWe, and Unit 3 had a gross generating capacity of 1,051 MWe. Both reactors used uranium dioxide fuel of no more than 4.8% U-235 enrichment. The reactors at Indian Point are protected by containment domes made of steel-reinforced concrete that is 40 inches (1.0 m) thick, with a carbon steel liner.[18]

Nuclear capacity in New York state

Prior to their respective shutdowns, Units 2 and 3 were among six operating nuclear energy sources at four nuclear power stations in New York state. New York was one of the five largest states in terms of nuclear capacity and generation, accounting for approximately 5% of the national totals and Indian Point provided 39% of the state's nuclear capacity. In 2017, Indian Point generated approximately 10% of the state's electricity needs, and 25% of the electricity used in New York City and Westchester County.[19] The New York Power Authority, which supplies the subway, airports, public schools, and housing in New York City and Westchester County, built Unit 3 but they stopped buying electricity from Indian Point in 2012. As a result, Entergy sold all of Indian Point's output into the NYISO administered electric wholesale markets and into New England.[20][21][22][23] New York state has among the highest average electricity prices in the United States. Fully half of the state's power demand is in the New York City area and about two-fifths of the state's generation originates there.[24][25]

Refueling

Units 2 and 3 were each refueled on a two-year cycle. At the end of each fuel cycle, one unit was brought offline for refueling and maintenance activities. On March 2, 2015, Indian Point 3 was taken offline for 23 days to perform its refueling operations. Entergy invested $50,000,000 in the refueling and other related projects for Unit 3, of which $30,000,000 went to employee salaries. The unit was brought back online on March 25, 2015.[26]

Effects

Economic impact

A June 2015 report by a lobby group called Nuclear Energy Institute found that the operation of Indian Point generates $1.3 billion of annual economic output in local counties, $1.6 billion statewide, and $2.5 billion across the United States. In 2014, Entergy paid $30,000,000 in state and local property taxes. The total tax revenue (direct and secondary) was nearly $340,000,000 to local, state, and federal governments.[20] According to the Village of Buchanan budget for 20162017, a payment in lieu of taxes in the amount of 2.62 million dollars was received in 2015–2016, and was projected to be 2.62 million dollars in 20162017 the majority of which can be assumed to come from the Indian Point Energy Center.[27]

Over the last decade of its operation, the station maintained a capacity factor of greater than 93%. This was consistently higher than the nuclear industry average and than other forms of generation. The reliability helped offset the severe price volatility of other energy sources (e.g., natural gas) and the indeterminacy of renewable electricity sources (e.g., solar, wind).[20]

Indian Point directly employed about 1,000 full-time workers. This employment created another 2,800 jobs in the five-county region, and 1,600 in other industries in New York, for a total of 5,400 in-state jobs. Additionally, another 5,300 indirect jobs were created out of state, creating a sum total of 10,700 jobs throughout the United States.[20]

Closure of the plant is expected to create a $15,000,000 fund which will be split between "community and environmental" projects, with the Riverkeeper environmental group expecting to receive half, which is subject of a debate with the local community.[28]

Environmental concerns

Environmentalists have expressed concern about increased carbon emissions with the deactivation of Indian Point (generating electricity with nuclear energy creates no carbon emissions). A study undertaken by Environmental Progress found that closure of the plant would cause power emissions to jump 29% in New York, equivalent to the emissions from 1.4 million additional cars on New York roads.[29]

Some environmental groups have expressed concerns about the operation of Indian Point, including radiation pollution and endangerment of wildlife, but whether Indian Point has ever posed a significant danger to wildlife or the public remains controversial. Though anti-nuclear group Riverkeeper notes "Radioactive leakage from the plant containing several radioactive isotopes, such as strontium-90, cesium-137, cobalt-60, nickel-63 and tritium, a rarely-occurring isotope of hydrogen, has flowed into groundwater that eventually enters the Hudson River in the past,[30] there is no evidence radiation from the plant has ever posed a significant hazard to local residents or wildlife. In the last year, nine tritium leaks have occurred; however, even at their highest levels the leaks have never exceeded one-tenth of 1% of U.S. Nuclear Regulatory Commission limits.

In February 2016, New York State Governor Andrew Cuomo called for a full investigation by state environment[31] and health officials and partnered with organizations like Sierra Club, Riverkeeper, Hudson River Sloop Clearwater, Indian Point Safe Energy Coalition, Scenic Hudson, and Physicians for Social Responsibility in seeking the permanent closure of the plant. However, Cuomo's motivation for closing the plant was called into question after it was revealed that two top former aides, under federal prosecution for influence-peddling, had lobbied on behalf of natural gas company Competitive Power Ventures (CPV) to kill Indian Point. In his indictment, US attorney Preet Bharara wrote "the importance of the plant [CPV's proposed Valley Energy Center, a plant powered by natural gas] to the State depended at least in part, on whether [Indian Point] was going to be shut down."[32]

In April 2016, climate scientist James Hansen took issue with calls to shut the plant down, including those from presidential candidate Bernie Sanders. "The last few weeks have seen an orchestrated campaign to mislead the people of New York about the essential safety and importance of Indian Point nuclear plant to address climate change," wrote Hansen, adding, "Sanders has offered no evidence that NRC [U.S. Nuclear Regulatory Commission] has failed to do its job, and he has no expertise in over-riding NRC's judgement. For the sake of future generations who could be harmed by irreversible climate change, I urge New Yorkers to reject this fear mongering and uphold science against ideology.”[33]

Indian Point utilizes water from the nearby Hudson River for cooling. Despite the use of fish screens, the cooling system kills over a billion fish eggs and larvae annually.[34] According to one NRC report from 2010, as few as 38% of alewives survive the screens.[35] On September 14, 2015, a state hearing began in regards to the deaths of fish in the river, and possibly implementing a deactivation period from May to August. An Indian Point spokesman stated that such a period would be unnecessary, as Indian Point "is fully protective of life in the Hudson River and $75 million has been spent over the last 30 years on scientific studies demonstrating that the plant has no harmful impact to adult fish." The hearings lasted three weeks.[36] Concerns were also raised over the alternate proposal to building new cooling towers, which would cut down forest land that is suspected to be used as breeding ground by muskrat and mink. At the time of the report, no minks or muskrats were spotted there.[35]

The generation capacity lost by closure of the Indian Point plant was largely replaced by fossil gas.[6][3][9]

Safety

Indian Point Energy Center was given a heightened amount of scrutiny and was regulated more heavily than various other power plants in the state of New York (i.e., by the NRC in addition to FERC, the NYSPSC, the NYISO, the NYSDEC, and the EPA). On a forced outage basis – incidents related to equipment failure that force a plant stoppage – it provides a much more reliable operating history than most other power plants in New York.[37][38] Beginning at the end of 2015, Governor Cuomo began to ramp up political action against the Indian Point facility, opening an investigation with the state public utility commission, the department of health, and the department of environmental conservation.[39][40][41][36][42][43] To put the public service commission investigation in perspective: most electric outage investigations conducted by the commission are in response to outages with a known number of affected retail electric customers.[44] By November 17, 2017, the NYISO accepted Indian Point's retirement notice.[45]

In 1997, Indian Point Unit 3 was removed from the NRC's list of plants that receive increased attention from the regulator. An engineer for the NRC noted that the plant had been experiencing increasingly fewer problems during inspections.[46] On March 10, 2009 the Indian Point Power Plant was awarded the fifth consecutive top safety rating for annual operations by the Federal regulators. According to the Hudson Valley Journal News, the plant had shown substantial improvement in its safety culture in the previous two years.[47] A 2003 report commissioned by then-Governor George Pataki concluded that the "current radiological response system and capabilities are not adequate to...protect the people from an unacceptable dose of radiation in the event of a release from Indian Point".[48] More recently, in December 2012 Entergy commissioned a 400-page report on the estimates of evacuation times. This report, performed by emergency planning company KLD Engineering, concluded that the existing traffic management plans provided by Orange, Putnam, Rockland, and Westchester Counties are adequate and require no changes.[49] According to one list that ranks U.S. nuclear power plants by their likelihood of having a major natural disaster related incident, Indian Point is the most likely to be hit by a natural disaster, mainly an earthquake.[50][51][52][53] Despite this, the owners of the plant still say that safety is a selling point for the nuclear power plant.[54]

Incidents

  • In 1973, five months after Indian Point 2 opened, the plant was shut down when engineers discovered buckling in the steel liner of the concrete dome in which the nuclear reactor is housed.[55]
  • On October 17, 1980,[56] 100,000 US gallons (380 m3) of Hudson River water leaked into the Indian Point 2 containment building from a fan cooling unit, undetected by a safety device designed to detect hot water. The flooding, covering the first 9 feet (2.7 m) of the reactor vessel, was discovered when technicians entered the building. Two pumps that should have removed the water were found to be inoperative. The NRC proposed a $2,100,000 fine for the incident.
  • In February 2000, Unit 2 experienced a Steam Generator Tube Rupture (SGTR), which allowed primary water to leak into the secondary system through one of the steam generators.[57] All four steam generators were subsequently replaced.[58]
  • In 2005, Entergy workers while digging discovered a small leak in a spent fuel pool. Water containing tritium and strontium-90 was leaking through a crack in the pool building and then finding its way into the nearby Hudson River. Workers were able to keep the spent fuel rods safely covered despite the leak.[59] On March 22, 2006 The New York Times also reported finding radioactive nickel-63 and strontium in groundwater on site.[60]
  • In 2007, a transformer at Unit 3 caught fire, and the Nuclear Regulatory Commission raised its level of inspections because the plant had experienced many unplanned shut-downs. According to an article appearing in The New York Times in 2012, Indian Point "has a history of transformer problems".[61]
  • On April 23, 2007, the Nuclear Regulatory Commission fined the owner of the Indian Point nuclear plant $130,000 for failing to meet a deadline for a new emergency siren plan. The 150 sirens installed in the area surrounding the plant are meant to alert residents within 10 miles to a plant emergency.[62]
  • On January 7, 2010, NRC inspectors reported that an estimated 600,000 gallons of mildly radioactive steam was intentionally vented to the atmosphere after an automatic shut-down of Unit 2. After the vent, one of the vent valves unintentionally remained slightly open for two days. The levels of tritium in the steam were within the allowable safety limits defined in NRC standards.[63]
  • On November 7, 2010, an explosion occurred in a main transformer for Indian Point 2, spilling oil into the Hudson River.[64] Entergy later agreed to pay a $1.2 million penalty for the transformer explosion.[61]
  • July 2013, a former supervisor who worked at the Indian Point nuclear power plant for twenty-nine years was arrested for falsifying the amount of particulate in the diesel fuel for the plant's backup generators.[65]
  • On May 9, 2015, a transformer failed at Indian Point 3, causing the automated deactivation of reactor 3. A fire that resulted from the failure was extinguished, and the reactor was placed in a safe and stable condition.[66] The failed transformer contained about 24,000 gallons of dielectric fluid, which is used as an insulator and coolant when the transformer is energized. The U.S. Coast Guard estimates that about 3,000 gallons of dielectric fluid entered the river following the failure.[67]
  • In June 2015, a mylar balloon floated into a Con Edison-owned switchyard, causing an offsite electrical problem resulting in an automatic shutdown of Unit 3.[68]
  • On July 8, 2015, Unit 3 was manually shut down after a feedwater pump failure.[69]
  • On December 5, 2015, Unit 2 automatically shut down after several control rods lost power.[70]
  • On February 6, 2016, Governor Andrew Cuomo informed the public that radioactive tritium-contaminated water leaked into the groundwater at the Indian Point Nuclear facility.[31]

Spent fuel

Indian Point stores used fuel rods in two spent fuel pools at the facility.[59] The spent fuel pools at Indian Point are not stored under a containment dome like the reactor, but rather they are contained within an indoor 40-foot-deep pool and submerged under 27 feet of water. Water is a natural and effective barrier to radiation. The spent fuel pools at Indian Point are set in bedrock and are constructed of concrete walls that are four to six feet wide, with a quarter-inch thick stainless steel inner liner. The pools each have multiple redundant backup cooling systems.[59][71]

Indian Point began dry cask storage of spent fuel rods in 2008, which is a safe and environmentally sound option according to the Nuclear Regulatory Commission.[72] Some rods have already been moved to casks from the spent fuel pools. The pools will be kept nearly full of spent fuel, leaving enough space to allow emptying the reactor completely.[73] Dry cask storage systems are designed to resist floods, tornadoes, projectiles, temperature extremes, and other unusual scenarios. The NRC requires the spent fuel to be cooled and stored in the spent fuel pool for at least five years before being transferred to dry casks.[74]

Earthquake risk

In 2008, researchers from Columbia University's Lamont–Doherty Earth Observatory located a previously unknown active seismic zone running from Stamford, Connecticut, to the Hudson Valley city of Peekskill, New York—the intersection of the Stamford-Peekskill line with the well-known Ramapo Fault—which passes less than a mile north of Indian Point.[75] The Ramapo Fault is the longest fault in the northeast, but scientists dispute how active this roughly two-hundred-million-year-old fault is. Many earthquakes in the state's varied seismic history are believed to have occurred on or near it. The fault line is visible at ground level and likely extends as deep as nine miles below the surface.[76]

According to a company spokesman, Indian Point was built to withstand an earthquake of 6.1 on the Richter scale.[77] Entergy executives have also noted that "Indian Point had been designed to withstand an earthquake much stronger than any on record in the region, though not one as powerful as the quake that rocked Japan.", in comparison to the 2011 Fukushima Daiichi incident [78]

According to an August 2010 Nuclear Regulatory Commission study, the NRC's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Indian Point was 1 in 30,303 for Unit 2 and 1 in 10,000 for Unit 3. Msnbc.com reported based on the NRC data that "Indian Point nuclear reactor No. 3 has the highest risk of earthquake damage in the country, according to new NRC risk estimates provided to msnbc.com." According to the report, the reason is that plants in known earthquake zones like California were designed to be more quake-resistant than those in less affected areas like New York.[79][80] The NRC did not dispute the numbers but responded in a release that "The NRC results to date should not be interpreted as definitive estimates of seismic risk," because the NRC does not rank plants by seismic risk.[81]

In July 2013, Entergy engineers reassessed the risk of seismic damage to Unit 3 and submitted their findings in a report to the NRC. It was found that risk leading to reactor core damage is 1 in 106,000 reactor years using U.S. Geological Survey data; and 1 in 141,000 reactor years using Electric Power Research Institute data. Unit 3's previous owner, the New York Power Authority, had conducted a more limited analysis in the 1990s than Unit 2's previous owner, Con Edison, leading to the impression that Unit 3 had fewer seismic protections than Unit 2. Neither submission of data from the previous owners was incorrect.[82]

I.P.E.C. Units 2 and 3 both operated at 100% full power before, during, and after the Virginia earthquake on August 23, 2011. A thorough inspection of both units by plant personnel immediately following this event verified no significant damage occurred at either unit.

Emergency planning

The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[83]

According to an analysis of U.S. Census data for MSNBC, the 2010 U.S. population within 10 miles (16 km) of Indian Point was 272,539, an increase of 17.6% during the previous ten years. The 2010 U.S. population within 50 miles (80 km) was 17,220,895, an increase of 5.1% since 2000. Cities within 50 miles include New York (41 miles to city center); Bridgeport, Conn. (40 miles); Newark, N.J. (39 miles); and Stamford, Conn. (24 miles).[84]

In the wake of the 2011 Fukushima incident in Japan, the State Department recommended that any Americans in Japan stay beyond fifty miles from the area. Columnist Peter Applebome, writing in The New York Times, noted that such an area around Indian Point would include "almost all of New York City except for Staten Island; almost all of Nassau County and much of Suffolk County; all of Bergen County; all of Fairfield County". He quotes Purdue University professor Daniel Aldrich as saying, "Many scholars have already argued that any evacuation plans shouldn't be called plans, but rather "fantasy documents"".[48]

The current ten-mile plume-exposure pathway Emergency Planning Zone (EPZ) is one of two EPZs intended to facilitate a strategy for protective action during an emergency and comply with NRC regulations. "The exact size and shape of each EPZ is a result of detailed planning which includes consideration of the specific conditions at each site, unique geographical features of the area, and demographic information. This preplanned strategy for an EPZ provides a substantial basis to support activity beyond the planning zone in the extremely unlikely event it would be needed."[85]

In an interview, Entergy executives said they doubt that the evacuation zone would be expanded to reach as far as New York City.[78]

Indian Point is protected by federal, state, and local law enforcement agencies, including a National Guard base within a mile of the facility, as well as by private on-site security forces.[86]

During the September 11 attacks, American Airlines Flight 11 flew near the Indian Point Energy Center en route to the World Trade Center. Mohamed Atta, one of the 9/11 hijackers/plotters, had considered nuclear facilities for targeting in a terrorist attack.[87] Entergy says it is prepared for a terrorist attack, and asserts that a large airliner crash into the containment building would not cause reactor damage.[88] Following 9/11, the NRC required operators of nuclear facilities in the U.S. to examine the effects of terrorist events and provide planned responses.[89] In September 2006, the Indian Point Security Department successfully completed mock assault exercises required by the Nuclear Regulatory Commission. However, according to environmental group Riverkeeper, these NRC exercises are inadequate because they do not envision a sufficiently large group of attackers.

According to The New York Times, fuel stored in dry casks is less vulnerable to terrorist attack than fuel in the storage pools.[73]

Recertification

Units 2 and 3 were both originally licensed by the NRC for 40 years of operation. The NRC limits commercial power reactor licenses to an initial 40 years, but also permits such licenses to be renewed. This original 40-year term for reactor licenses was based on economic and antitrust considerations, not on limitations of nuclear technology. Due to this selected period, however, some structures and components may have been engineered on the basis of an expected 40-year service life.[90] The original federal license for Unit 2 was due to expire on September 28, 2013,[91][92] and the license for Unit 3 was due to expire in December 2015.[93] On April 30, 2007, Entergy submitted an application for a 20-year renewal of the licenses for both units. On May 2, 2007, the NRC announced that this application is available for public review.[94] Because the owner submitted license renewal applications at least five years prior to the original expiration date, the units were allowed to continue operation past this date while the NRC considered the renewal application.

On September 23, 2007, the antinuclear group Friends United for Sustainable Energy (FUSE) filed legal papers with the NRC opposing the relicensing of Unit 2. The group contended that the NRC improperly held Indian Point to less stringent design requirements. The NRC responded that the newer requirements were put in place after the plant was complete.[95]

On December 1, 2007, Westchester County Executive Andrew J. Spano, New York Attorney General Andrew Cuomo, and New York Governor Eliot Spitzer called a press conference with the participation of environmental advocacy groups Clearwater and Riverkeeper to announce their united opposition to the re-licensing of Indian Point. The New York State Department of Environmental Conservation and the Office of the Attorney General requested a hearing as part of the process put forth by the Nuclear Regulatory Commission. In September 2007, The New York Times reported on the rigorous legal opposition Entergy faced in its request for a 20-year licensing extension for Unit 2.[95]

A water quality certificate is a prerequisite for a twenty-year renewal by the NRC. On April 3, 2010, the New York State Department of Environmental Conservation ruled that Indian Point violates the federal Clean Water Act,[96] because "the power plant's water-intake system kills nearly a billion aquatic organisms a year, including the shortnose sturgeon, an endangered species." The state had demanded that Entergy construct new closed-cycle cooling towers at a cost of over $1 billion, a decision that would have effectively closed the plant for nearly a year during construction of the towers. Regulators denied Entergy's request to install fish screens that they said would improve fish mortality more than new cooling towers. Anti-nuclear groups and environmentalists have in the past tried to close the plant, which is in a more densely populated area than any of the 66 other nuclear plant sites in the US. Opposition to the plant increased after the September 2001 terror attacks, when one of the hijacked jets flew close to the plant on its way to the World Trade Center. Public worries also increased after the 2011 Japanese Fukushima Daiichi nuclear disaster and after a report highlighting the Indian Point plant's proximity to the Ramapo Fault.

Advocates of recertifying Indian Point included former New York City mayors Michael Bloomberg and Rudolph W. Giuliani. Bloomberg said that "Indian Point is critical to the city's economic viability".[97] The New York Independent System Operator maintains that in the absence of Indian Point, grid voltages would degrade, which would limit the ability to transfer power from upstate New York resources through the Hudson Valley to New York City.[98]

New York State Governor Andrew Cuomo continued to call for closure of Indian Point.[99] In late June 2011, a Cuomo advisor met with Entergy executives and directly informed them for the first time of the Governor's intention to close the plant, while the legislature approved a bill to streamline the process of siting replacement plants.[100]

Nuclear energy industry figures and analysts responded to Cuomo's initiative by questioning whether replacement electrical plants could be certified and built rapidly enough to replace Indian Point, given New York state's "cumbersome regulation process", and also noted that replacement power from out of state sources will be hard to obtain because New York has weak ties to generation capacity in other states. They said that possible consequences of closure will be a sharp increase in the cost of electricity for downstate users and even "rotating black-outs".[101]

Several members of the House of Representatives representing districts near the plant have also opposed recertification, including Democrats Nita Lowey, Maurice Hinchey, and Eliot Engel and then-Republican member Sue Kelly.[102]

In November 2016 the New York Court of Appeals ruled that the application to renew the NRC operating licenses must be reviewed against the state's coastal management program, which the New York State Department of State had already decided was inconsistent with coastal management requirements. Entergy had filed a lawsuit regarding the validity of Department of State's decision.[103]

Closure

At the end of 2015, Governor Cuomo began to ramp up political action against Indian Point, opening investigations with the state public utility commission, the department of health, and the department of environmental conservation.[39][40][41][36][42][43] To put the public service commission investigation in perspective, most electric outage investigations conducted by the commission are in response to outages with a known number of affected retail electric customers.[44] By November 17, 2017, the NYISO accepted Indian Point's retirement notice.[45]

In January 2017, the governor's office announced a phased closure of Indian Point by 2020 (Unit 2) and 2021 (Unit 3).[104] The closure, along with Governor Cuomo's long-term pollution control goals, challenges New York's energy supply. Among the solution proposals are Grid energy storage, renewables (solar and wind), a new transmission cable from Canada[105][106] , and a 650MW natural gas plant located in Wawayanda, New York.[107] There was also a 1,000 MW merchant HVDC transmission line proposed in 2013 to the public service commission that would have interconnected at Athens, New York and Buchanan, New York; however, this project was indefinitely stalled when its proposed southern converter station site was bought by the Town of Cortlandt in a land auction administered by Con Edison.[108][109][110] As of October 1, 2018, the 650 MW plant built in Wawayanda, New York, by CPV Valley, is operating commercially.[111] The CPV Valley plant has been associated with Governor Cuomo's close aid, Joe Percoco, and the associated corruption trial.[112] A natural gas-fired power plant, Cricket Valley Energy Center rated at 1,100 MW, was constructed and is operational in Dover, New York as of the second quarter of 2020.[113] An Indian Point contingency plan, initiated in 2012 by the NYSPSC under the administration of Cuomo, solicited energy solutions from which a Transmission Owner Transmission Solutions (TOTS) plan was selected. The TOTS projects provide 450 MW[114] of additional transfer capability across a NYISO-defined electric transmission corridor in the form of three projects: series compensation at a station in Marcy, New York, reconductoring a transmission line, adding an additional transmission line, and "unbottling" Staten Island capacity. These projects, with the exception of part of the Staten Island "unbottling", were in service by mid-2016. The cost of the TOTS projects are distributed among various utilities in their rate cases before the public service commission and the cost allocation amongst themselves was approved by FERC. NYPA and LIPA are also receiving a portion. The cost of the TOTS projects has been estimated in the range of $27 million to $228 million.[115][116][117][118][119] An energy highway initiative was also prompted by this order (generally speaking, additional lines on the Edic-Pleasant Valley and the Oakdale-Fraser transmission corridors), which is still going through the regulatory process in both the NYISO and NYSPSC.

Unit 2 shut down in April 2020 and Unit 3 shut down in April 2021.[120][121] Holtec will be purchasing the plant from Entergy and dismantling it.[3] A report by the New York Building Congress, a construction industry association, has said that NYC will need additional natural gas pipelines to accommodate the city's increasing demand for energy.[9] Holtec faced criticism from the community for its plan to discharge wastewater from Indian Point into the Hudson River.[122] Legislation then passed in the NY State Senate and Assembly to prevent any discharge into the Hudson River.[123]

The power plant was parodied as a rival plant in an episode of The Simpsons.

See also

References

  1. "EIA - State Nuclear Profiles". www.eia.gov. Retrieved October 3, 2017.
  2. Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series.
  3. 1 2 3 4 McGeehan, Patrick (April 12, 2021). "Indian Point Is Shutting Down. That Means More Fossil Fuel". The New York Times. ISSN 0362-4331. Retrieved April 14, 2021.
  4. "Indian Point, closest nuclear plant to New York City, set to retire by 2021". eia.gov. Energy Information Administration. February 1, 2017. Retrieved March 15, 2020.
  5. "Entergy's Indian Point Unit 3 to Permanently Shut Down". entergynewsroom.com. Entergy Corporation. April 28, 2021. Retrieved May 8, 2021.
  6. 1 2 3 Johnson, Slade (April 30, 2021). "New York's Indian Point nuclear power plant closes after 59 years of operation". US Energy Information Administration. Archived from the original on May 14, 2021. Three natural gas-fired power plants have been introduced over the past three years to help support the electric supply needed by New York City that Indian Point had been providing: Bayonne Energy Center II (120 MW), CPV Valley Energy Center (678 MW), and Cricket Valley Energy Center (1,020 MW).
  7. McGeehan, Patrick (April 30, 2021). "This Is the End of Nuclear Energy in New York". The New York Times. ISSN 0362-4331. Retrieved May 5, 2021.
  8. Hill, Michael (April 29, 2021). "New York's controversial Indian Point nuclear plant closes this week". Penn Live. Retrieved April 29, 2021.
  9. 1 2 3 Bredderman, Will (July 24, 2017). "Industry group: City needs more gas pipelines to offset Indian Point closure". Crain's New York Business. Retrieved September 15, 2018.
  10. "Indian Point celebrates record run as closure approaches". April 29, 2021. Retrieved May 8, 2021.
  11. "Con Ed Acquire Indian Point". The Hastings News. October 14, 1954. Retrieved July 31, 2016 via Fultonhistory.com.
  12. History
  13. "New York Nuclear Plants". Energy Information Administration. May 18, 2015.
  14. "Thorium Fuel for Nuclear Energy". American Scientist. September 2003. Retrieved March 21, 2023.
  15. "Indian Readied for New Uranium". Mount Vernon Argus. White Plains, New York. March 16, 1966. p. 17. Retrieved March 21, 2023.
  16. "Status of Nuclear Energy in the United States". Argonne National Laboratories. Archived from the original on March 16, 2011.
  17. "Indian Point 1". Nuclear Regulatory Commission.
  18. "Indian Point Energy Center Factsheet". Entergy. Archived from the original on May 20, 2015. Retrieved May 19, 2015.
  19. "NYISO 2018 Gold Book (pdf)". www.nyiso.com. pp. 13, 49. Retrieved November 26, 2018.
  20. 1 2 3 4 "Economic Impacts of the Indian Point Energy Center" (PDF). NEI. June 2015. Archived from the original (PDF) on June 22, 2015. Retrieved June 9, 2015.
  21. "Entergy Nuclear - Indian Point Energy Center Units 2 & 3". Archived from the original on March 27, 2019. Retrieved July 31, 2016.
  22. "Entergy to Test Indian Point Siren System – Indianpoint Website". Archived from the original on April 25, 2016. Retrieved July 31, 2016.
  23. "NYISO website". Retrieved November 5, 2018.
  24. "EIA - State Nuclear Profiles". Retrieved July 31, 2016.
  25. "New York Profile". Retrieved July 31, 2016.
  26. "Entergy's Indian Point Nuclear Power Plant Unit Shuts Down for $50 Million Planned Refueling, Bringing in 1,000 Additional Workers After Two-Year Run of High Reliability and Safety". Entergy. March 2015. Archived from the original on September 24, 2015. Retrieved March 23, 2015.
  27. "Village of Buchanan Website" (PDF). p. 22. Archived from the original (PDF) on November 1, 2018. Retrieved October 31, 2018.
  28. Zambito, Thomas C. "Indian Point communities stake claim to $15M fund as they fight for their future". lohud.com. Retrieved May 4, 2020.
  29. Shellenberger, Michael. "New York". Environmental Progress. Archived from the original on February 22, 2020. Retrieved February 22, 2020.
  30. "Radiological Leaks at Indian Point". Riverkeeper.org.
  31. 1 2 http://www.governor.ny.gov: Statement from Governor Andrew M. Cuomo Regarding Indian Point Nuclear Facility Archived February 7, 2016, at the Wayback Machine
  32. Shellenberger, Michael. "Working for Natural Gas Interests, Former Cuomo Aides Lobbied to Kill Indian Point Nuclear Plant". Environmental Progress. Retrieved February 22, 2020.
  33. Hansen, James. "James Hansen Condemns Bernie Sanders' Fear-Mongering Against Indian Point". Environmental Progress. Retrieved February 22, 2020.
  34. McGeehan, Patrick (May 12, 2015). "Fire Prompts Renewed Calls to Close the Indian Point Nuclear Plant". New York Times.
  35. 1 2 Wald, Matthew L. "A Detailed Look at Indian Point's Environmental Effects". The New York Times. Retrieved September 19, 2015.
  36. 1 2 3 Garcia, Ernie. "Indian Point fish kill hearings begin, last for 3 weeks". lohud.com. Retrieved September 19, 2015.
  37. "NYISO link to GoldBook pdf" (PDF). Archived from the original (PDF) on November 1, 2018. Retrieved October 31, 2018.
  38. "NYISO link to its planning docs". Archived from the original on October 28, 2018. Retrieved October 31, 2018.
  39. 1 2 "NYSPSC investigation notice to Entergy". December 22, 2015. Retrieved October 31, 2018.
  40. 1 2 New York State Public Service Commission DMM case no. 15-02730
  41. 1 2 NYSPSC DMM case no. 17-00994
  42. 1 2 SCOTT WALDMAN (July 21, 2014). "The coming battle over an 'unprecedented' Indian Point shutdown". Politico. Retrieved November 13, 2018.
  43. 1 2 "Critics decry radioactive leak at Indian Point nuclear plant". The Daily Freeman. February 11, 2016. Retrieved November 13, 2018.
  44. 1 2 "NYSPSC DMM Website". Retrieved November 13, 2018.
  45. 1 2 "Dec 13, 2017 NYISO Retirement Analysis" (PDF). Archived from the original (PDF) on November 1, 2018. Retrieved October 31, 2018.
  46. "Indian Point Nuclear Plant Removed From List of Worst in Nation". The New York Times. June 26, 1997.
  47. Clary, Greg (May 11, 2009). "Indian Point gets fifth consecutive top safety rating for annual operations". The Journal News. Archived from the original on April 2, 2009. Retrieved March 26, 2011.
  48. 1 2 Applebome, Peter (March 20, 2011). "Fukushima, Indian Point and Fantasy". The New York Times. Retrieved March 26, 2011.
  49. "KLD Report Indian Point Energy Center Development of Evacuation Time Estimates" (PDF). December 2012.
  50. Merrefield, Clark; Streib, Lauren; Yarrett, Ian (March 16, 2011). "Most Vulnerable U.S. Nuclear Plants". The Daily Beast. Retrieved September 12, 2015.
  51. Breyer, Melissa. "10 Riskiest Nuclear Power Plants in America". care2.com. Archived from the original on September 15, 2016. Retrieved September 12, 2015.
  52. Koberstein, Paul. "Part 9:The Most Dangerous Nuclear Power Plants in America". times.org. Archived from the original on September 18, 2015. Retrieved September 12, 2015.
  53. Dedman, Bill. "What are the odds? US nuke plants ranked by quake risk". nbcnews.com. Retrieved September 12, 2015.
  54. "Entergy official touts safety of Indian Point nuclear power plant". dailyfreeman.comre. September 12, 2015. Retrieved September 12, 2015.
  55. Archibold, Randal C. (September 7, 2001). "Con Edison Sells Indian Point 2, Its Last Major Electricity Plant". The New York Times.
  56. "Leaking Pipe Repaired At Indian Point 2 Plant". New York Times. October 23, 1980. Retrieved November 29, 2011.
  57. "The Steam Generator Tube Rupture at Indian Point". December 24, 2005.
  58. Chen, David W. (August 10, 2000). "Con Ed to Replace All Generators at Indian Point 2 Plant". The New York Times. Retrieved May 8, 2021.
  59. 1 2 3 "Indian Point had a smaller leak in the past". The Journal News. March 27, 2011. Archived from the original on April 27, 2015.
  60. Wald, Matthew L. (March 22, 2006). "More Contaminants Discovered in Water at Indian Point Plant". The New York Times.
  61. 1 2 Wald, Matthew L. (March 27, 2012). "$1.2 Million Fine for Indian Point Fire". The New York Times.
  62. "Buchanan: Nuclear Plant Owner Fined". The New York Times. April 24, 2007.
  63. Luby, Abby (January 7, 2010). "Nuclear steam leak intentional: Response to Indian Point plant shutdown". Daily News.
  64. Hutchinson, Bill (November 8, 2010). "Explosion closes Indian Point nuclear power plant near New York City; no danger of radiation leak". Daily News.
  65. "Former Indian Point Supervisor Sentenced In White Plains Federal Court For Falsifying Nuclear Facility Records". May 13, 2015. Retrieved November 6, 2018.
  66. "Nuclear plant fire sends oil into Hudson River". CBS News. May 10, 2015. Retrieved June 9, 2015.
  67. "Indian Point Unit 3 Transformer Liquid Discharge into Hudson Estimated at Approximately 3,000 Gallons; Hotline Telephone Available to Report Potential Oil Sightings – Indianpoint Website". Archived from the original on August 9, 2016. Retrieved July 31, 2016.
  68. "Indian Point: Balloon triggered reactor shutdown". Retrieved July 1, 2016.
  69. "CIndian Point: Pump malfunction shuts reactor". July 8, 2015. Retrieved May 8, 2021.
  70. "Indian Pt. reactor to remain shut for a couple days". Retrieved March 18, 2018.
  71. "Spent Fuel". Entergy. Archived from the original on April 27, 2015. Retrieved June 9, 2015.
  72. "Backgrounder on Dry Cask Storage of Spent Nuclear Fuel". NRC. Retrieved June 9, 2015.
  73. 1 2 Wald, Matthew L. (January 12, 2008). "Indian Point Nuclear Waste Moved to New, Dry Home". The New York Times. Retrieved June 9, 2015.
  74. "NRC: Backgrounder on Dry Cask Storage of Spent Nuclear Fuel". Retrieved July 31, 2016.
  75. Sykes, Lynn (August 21, 2008). "Earthquakes May Endanger New York More Than Thought, Says Study". Earth Institute. Columbia University. Retrieved July 1, 2015.
  76. Guglielmo, Wayne J. (June 15, 2010). "Living on the Fault Line". New Jersey Monthly. Retrieved June 9, 2015.
  77. Gardner, Timothy (August 22, 2008). "NY nuclear plant likely a quake risk: study". Reuters.
  78. 1 2 McGeehan, Patrick (March 21, 2011). "Operators of Indian Point Say Changes Are Likely". The New York Times. Retrieved March 26, 2011.
  79. Dedman, Bill (March 17, 2011). "What are the odds? US nuke plants ranked by quake risk". NBC News. Retrieved April 19, 2011.
  80. "Archived copy" (PDF). Archived from the original (PDF) on May 25, 2017. Retrieved April 19, 2011.{{cite web}}: CS1 maint: archived copy as title (link)
  81. Speicher, Jake (March 18, 2011). "NRC Spokesperson: We Don't Rank Plants by Seismic Risk". West Chester Patch.
  82. Dunne, Allison (July 17, 2013). "Entergy Reassesses Earthquake Risk For Indian Point Three". WMAC Northeast Public Radio. Archived from the original on November 8, 2013. Retrieved July 31, 2013.
  83. "NRC: Backgrounder on Emergency Preparedness for Nuclear Power Plants". Archived from the original on October 2, 2006. Retrieved March 14, 2012.
  84. Dedman, Bill (April 14, 2011). "Nuclear neighbors: Population rises near US reactors". NBC News. Retrieved May 1, 2011.
  85. "NRC: Emergency Planning Zones". Retrieved July 31, 2016.
  86. "Security at Indian Point". Entergy. Archived from the original on May 21, 2015. Retrieved June 9, 2015.
  87. "9/11 Commission Report" (PDF). govinfo.library.unt.edu.
  88. "Aircraft Crash Impact Analyses Demonstrate Nuclear Power Plant's Structural Strength" (PDF). December 2002. Archived from the original (PDF) on January 8, 2013. Retrieved June 9, 2015.
  89. Archibold, Randal C.; Wald, Matthew L. (July 26, 2003). "U.S. Approves Evacuation Plan For Indian Point Nuclear Plant". The New York Times.
  90. "Reactor License Renewal Overview". NRC.
  91. "Indian Point Nuclear Generating Unit 2". NRC.
  92. "NRC: Indian Point Nuclear Generating Unit Nos. 2 and 3 - License Renewal Application". Retrieved July 31, 2016.
  93. "Indian Point Nuclear Generating Unit 3". NRC.
  94. "LICENSE RENEWAL APPLICATION FOR INDIAN POINT NUCLEAR PLANT AVAILABLE FOR PUBLIC INSPECTION" (PDF) (Press release). NRC. May 2, 2007.
  95. 1 2 Wald, Matthew L. (September 24, 2007). "Indian Point Faces New Challenge From Opponents". The New York Times. Retrieved April 3, 2010.
  96. Halbfinger, David M. (April 3, 2010). "Water Permit Denied for Indian Point". The New York Times. Retrieved April 3, 2010.
  97. Hennelly, Bob (March 18, 2011). "Bloomberg Backs Indian Point Nuclear Plant". Archived from the original on March 21, 2011. Retrieved March 26, 2011.
  98. Casey, Tom (May 2, 2011). "NYISO: Indian Point closure could stress outstate's electrical system". The Legislative Gazette. Retrieved June 9, 2015.
  99. Tomassini, Jason (March 23, 2011). "Morning Buzz: Cuomo Again Aims at Indian Point". The New York Times.
  100. Hakim, Danny (June 28, 2011). "Cuomo Takes Tough Stance on two Reactors". The New York Times. pp. A1.
  101. Wald, Matthew L. (July 13, 2011). "News Analysis: If Indian Point Closes, Plenty of Challenges". The New York Times. pp. A21.
  102. "Lowey Urges FEMA To Reject Recertification of Indian Point Evacuation Plans". January 27, 2006. Archived from the original on April 7, 2011. Retrieved March 26, 2011.
  103. "Court rules against Entergy on Indian Point license renewal". World Nuclear News. November 23, 2016. Retrieved November 26, 2016.
  104. "Governor Cuomo Announces 10th Proposal of the 2017 State of the State: Closure of the Indian Point Nuclear Power Plant by 2021". Governor Andrew M. Cuomo. January 9, 2017. Archived from the original on March 30, 2019. Retrieved January 14, 2017.
  105. Spector, Julian (May 10, 2017). "When Indian Point Shuts Down, Will Storage or Efficiency Save the Day?". Greentech Media. Retrieved May 14, 2017. New York metro area has run afoul of federal ozone pollution standards, and old peaking power plants play a significant role in that.
  106. Indian Point replacement options, 2017
  107. "Working for Natural Gas Interests, Former Cuomo Aides Lobbied to Kill Indian Point Nuclear Plant". Environmental Progress. January 6, 2017. Retrieved December 3, 2017.
  108. NYSPSC DMM Case No. 13-T-0292
  109. "WPP Letter to ALJ asking for suspension of schedule". October 29, 2014. Retrieved November 13, 2018.
  110. "WPP Website". Retrieved November 13, 2018.
  111. "CPV Achieves Commercial Operation at 680MW CPV Valley Energy Center New York". October 1, 2018. Archived from the original on November 1, 2018. Retrieved October 31, 2018.
  112. James Nani (November 22, 2016). "Corruption Indictment Details Charges Against Former CPV Exec Ex Cuomo Aide". Times Herald-Record. Retrieved October 31, 2018.
  113. "Cricket Valley Energy Center Operations". 2021. Retrieved May 8, 2021.
  114. Linares, Corina Rivera (July 6, 2016). "New York ISO: TOTS projects placed in service in June". www.transmissionhub.com. Retrieved December 8, 2018.
  115. "NYSPSC case no. 12-E-0503 February 24, 2016 Order". Retrieved October 31, 2018.
  116. NYSPSC case no. 12-E-0503
  117. William Opalka (November 11, 2015). "Settlement Reached on New York TOTS Projects". RTO Insider. Retrieved November 14, 2018.
  118. "Costs for New Transmission Lines in NY Passed Through To You As of June 1st". Energywatch inc. May 10, 2016. Retrieved November 14, 2018.
  119. "NYPA Financial Report 2016-2017" (PDF). December 31, 2017. pp. 20, 21, 74. Retrieved November 14, 2018.
  120. McGeehan, Patrick (December 22, 2017). "Cuomo Confirms Deal to Close Indian Point Nuclear Plant". The New York Times. ISSN 0362-4331. Retrieved September 15, 2018.
  121. Johnson, Slade (April 30, 2021). "New York's Indian Point nuclear power plant closes after 59 years of operation". Energy Information Administration (EIA). Retrieved May 1, 2021.
  122. Lee, Lindsay (April 17, 2023). "Holtec Halts Plans for Radioactive Discharge at Indian Point". The Yonkers Ledger. Retrieved November 26, 2023.
  123. "Senate Bill S6893". nysenate.gov. May 15, 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.