Lake Spaulding Dam[1] (National ID # CA00358) is a dam in Nevada County, California.
Owned and operated by Pacific Gas & Electric for hydroelectric power generation, the 275-foot (84 m)-high dam was designed by John R. Freeman and completed in 1913 .[2][3]
It impounds the South Fork of the Yuba River, which originates near Donner Pass. At the time of construction it was the highest dam in California,[4] and one of ten PG&E hydroelectric facilities.[5] A temporary camp called Camp Spaulding, California was established to house workers on the dam during its construction.
Lake Spaulding, the reservoir created by the dam, has a capacity of 74,773 acre-feet (92,231,000 m3)[2] and supports recreational camping, boating, fishing, and underwater diving.[6]
See also
References
- ↑ "Lake Spaulding 97-029 Dam". Geographic Names Information System. United States Geological Survey, United States Department of the Interior.
- 1 2 "Dams Within the Jurisdiction of the State of California (H-M)" (PDF). California Department of Water Resources, Division of Safety of Dams. Archived from the original (PDF) on October 5, 2012. Retrieved November 4, 2012.
- ↑ "Biographical Memoir of John Ripley Freeman, 1855–1932" (PDF). National Academy of Sciences. Retrieved November 15, 2014.
- ↑ Cassier's engineering monthly, Volumes 43-44, page 107
- ↑ The Electric journal, Volume 12, by Electric Club, Westinghouse Club, page 265
- ↑ "Spaulding Lake : Sierra Outdoor Recreation©". Archived from the original on 2012-05-16. Retrieved 2012-07-28.