Line S1 | |
---|---|
S1 | |
Overview | |
Locale | Wenzhou, Zhejiang, China |
Termini |
|
Stations | 18 |
Service | |
Type | Hybrid commuter rail and rapid transit |
System | Wenzhou Rail Transit |
Operator(s) | Wenzhou Mass Transit Rail Corporation (WZ-MTR) |
Rolling stock | CRRC Qingdao Sifang SFM28 (demonstrators, 2 sets) CRRC Qingdao Sifang Cinova-140 (30 sets)[1] |
History | |
Opened | 23 January 2019 |
Technical | |
Line length | 53.5 km (33.24 mi)[2] |
Number of tracks | 2 |
Character | Underground and Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines, 25 kV 50 Hz AC |
Operating speed | 120 km/h (maximum speed) |
Line S1 | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 温州轨道交通S1线 | ||||||
Traditional Chinese | 溫州軌道交通S1線 | ||||||
|
Line S1 of the Wenzhou Rail Transit (Chinese: 温州轨道交通S1线; pinyin: Wēnzhōu Guǐdào Jiāotōng S-Yī Xiàn)[3] is a suburban rapid transit line in Wenzhou running from Tongling to Shuang'ou Avenue. The west section (Tongling - Olympic Center) has 12 stations[lower-alpha 1] and is 34.38 km (21.36 mi). The west section was opened on January 23, 2019.[3] The east section of the line (19.127 km (11.885 mi)[4] with 6 stations) was opened on September 28, 2019.
The full line is 53.5 kilometres (33.2 mi) long.[5]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Tongling — Olympic Center | 23 January 2019 | 34.38 km (21.36 mi)[3] | 12 | Western section of Phase 1 |
Olympic Center — Shuang'ou Avenue | 28 September 2019 | 19.127 km (11.885 mi)[4] | 6 | Eastern section of Phase 1 |
Stations
station name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Tongling | 桐岭 | Ouhai | ||||
Panqiao | 潘桥 | |||||
South Railway Station | 动车南 | VRH | ||||
Xiuyu (reserved station) | 秀屿 | |||||
Xinqiao | 新桥 | |||||
Dezheng | 德政 | Lucheng | ||||
Longxia Road | 龙霞路 | Ouhai | ||||
Wenzhou Railway Station (reserved station) | 温州火车站 | RZH S3 (planned) | Lucheng | |||
Huimin Road | 惠民路 | |||||
Sanyang Wetland | 三垟湿地 | Ouhai | ||||
Wenchang (reserved station) | 文昌 | Ouhai / Lucheng | ||||
Longteng Road | 龙腾路 | Longwan | ||||
Kejicheng | 科技城 | |||||
Yaoxi | 瑶溪 | |||||
Olympic Center | 奥体中心 | |||||
Yongzhong | 永中 | |||||
Airport | 机场 | WNZ S2 |
||||
Lingkun | 灵昆 | S2 | Dongtou | |||
Oujiangkou | 瓯江口 | |||||
Ouhua | 瓯华 | |||||
Shuang'ou Avenue | 双瓯大道 | |||||
Gallery
Notes
- ↑ Excluding 3 reserved stations: Xiuyu, Wenzhou Railway Station, and Wenchang.
References
- ↑ "温州轨道交通S1号线 | 城市轨道 - 记录动车组列车发展历程——慧伊创新科技(北京)有限公司". china-emu.cn. Retrieved 2023-09-20.
- ↑ "温州市域铁路建设与城市发展同呼吸 轨道交通"城"长记". 2020-12-30.
- 1 2 3 "刚刚!温州首条轨道交通S1线正式开通试运营". 2019-01-23.
- 1 2 "S1线东段通过项目工程质量验收,计划月底通车". 2019-09-01.
- ↑ "温州首条轨道交通S1线正式开通试运营". 2019-01-24.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.