Silver Line
(Line 10)
Overview
StatusUnder Construction
OwnerDelhi Metro
LocaleDelhi
Termini
Stations15 , Elevated: 4, Underground: 11
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned opening2025 (Phase 4)
Technical
Line length23.62 km (14.68 mi)
CharacterUnderground and Elevated
Route map

Delhi Aerocity
Mahipalpur
Vasant Kunj Sector-D
Kishangarh
Chhatarpur
Chhatarpur Mandir
IGNOU
Neb Sarai
Saket G-Block
Ambedkar Nagar
Khanpur
Sangam Vihar - Tigri
Anandmayee Marg
Tughlakabad Railway Colony
Tughlakabad Station

The Silver Line (Line 10) is an under construction line of Delhi Metro which is expected to be completed by September 2025.[1]

This 23.622 km line consists of 15 stations (4 Elevated & 11 Underground) from Tughlakabad to Delhi Aerocity. This Line is a part of Phase 4 of Delhi Metro.[2]

Stations

The stations proposed for the Silver Line are:[2][3]

Silver Line
No. Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 IGI Airport Terminal 1 ' 4 2026[4] Magenta Line Underground Island None None
2 Delhi Aerocity दिल्ली एरोसिटी 4 2026[5] Airport Express Underground Island None None
3 Mahipalpur महिपालपुर 4 2026 Underground Side None None
4 Vasant Kunj वसंत कुंज 4 2026 Underground Side Vasant Kunj Depot At Grade
5 Kishangarh किशनगढ़ 4 2026 Underground Side None None
6 Chhatarpur Chowk छत्तरपुर 4 2026 Yellow Line Underground Side None None
7 Chhatarpur छत्तरपुर 4 2026 Underground Island None None
8 IGNOU इग्नू 4 2026 Underground Island None None
9 Neb Sarai नेब सराय 4 2026 Underground Island None None
10 Saket East साकेत जी-ब्लॉक 4 2026 Brown Line
(Phase 4 - Under Construction)
Elevated Side None None
11 Ambedkar Nagar अम्बेडकर नगर 4 2026 Elevated Side None None
12 Khanpur ख़ानपुर 4 2026 Elevated Side None None
13 Sangam Vihar - Tigri संगम विहार - तिगड़ी 4 2026 Elevated Side None None
14 Maa Anandmayee Marg आनंदमयी मार्ग 4 2026 Underground Island None None
15 Pul Pehladpur तुग़लक़ाबाद रेलवे कॉलोनी 4 2026 Underground Island None None
16 Tughlakabad Station तुग़लक़ाबाद स्टेशन 4 2026 Violet Line Underground Island Sarita Vihar Depot At Grade

In November 2020, DMRC changed the alignment of the Silver line as per the instructions of Archaeological Survey of India to circumvent the Qutub Minar and more than a hundred other historical structures in Mehrauli.[2]

DMRC has sent a Detailed Project Report (DPR) to the authorities for the extention of Silver line to Terminal 1-IGI Airport metro station, and approval for the same is awaited.[6][7]

Train Info

Silver Line
Rakes
Train Length
Train Gauge
Electrification
Train's Maximum Speed
Train Operation Delhi Metro

References

  1. "Delhi: Covid, green concerns put Phase-IV in low gear; push targets back". The Times of India. 14 June 2022. Retrieved 16 June 2022.
  2. 1 2 3 "Delhi Metro steers clear of Qutub Minar". The Times of India. 2 December 2020. ISSN 0971-8257. Retrieved 20 December 2023.
  3. "Delhi Metro map". www.delhimetrorail.com. Retrieved 21 April 2022.
  4. "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief". TimesNow. 5 November 2023. Retrieved 24 November 2023.
  5. "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief". TimesNow. 5 November 2023. Retrieved 24 November 2023.
  6. "Delhi Metro's Silver Line to Aerocity may be extended to terminal 1". The Times of India. 19 December 2023. ISSN 0971-8257. Retrieved 19 December 2023.
  7. "Good News For Air Travellers! Delhi Metro's Silver Line To Aerocity To Be Extended To Terminal 1". TimesNow. 19 December 2023. Retrieved 19 December 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.