Marcoule Nuclear Site (French: Site nucléaire de Marcoule) is a nuclear facility in the Chusclan and Codolet communes, near Bagnols-sur-Cèze in the Gard department of France, which is in the tourist, wine and agricultural Côtes-du-Rhône region. The plant is around 25 km north west of Avignon, on the banks of the Rhone.

Operational since 1956, Marcoule is a gigantic site run by the atomic energy organization Commissariat à l'Énergie Atomique (CEA) and Areva NC and is known as CEA VALRHO Marcoule. The first industrial and military plutonium experiments took place in Marcoule. Diversification of the site was started in the 1970s with the creation of the Phénix prototype fast breeder reactor, which was operational until 2009, and is nowadays an important site for decommissioning nuclear facilities activities.

As of 2016 the Phénix reactor was planned to be succeeded by the sodium-cooled fast reactor ASTRID (Advanced Sodium Technical Reactor for Industrial Demonstration), foreseen to become operational in the 2030s.[1] However, in 2019 the ASTRID project was closed.[2]

Since 1995, the MELOX factory has been producing MOX from a mix of uranium and plutonium oxides. MOX is used to recycle plutonium from nuclear fuel; this plutonium comes from the COGEMA La Hague site.

The ATelier Alpha et Laboratoires pour ANalyses, Transuraniens et Etudes de retraitement (ATALANTE) is a CEA laboratory investigating the issues of nuclear reprocessing of nuclear fuel and of radioactive waste.

Reactors

The site housed a number of the first generation French UNGG reactors, all of which have been shut down. Since then, it has also operated two heavy water reactors to produce tritium. Cooling for all of the plants comes from the Rhône river.

Unit Type Net power Total power Construction start Construction finish Full operation Shut down
Marcoule G1[3]UNGG2 MW195507.01.1956 15.10.1968
Marcoule G2[4]UNGG39 MW43 MW01.03.195522.04.195922.04.195902.02.1980
Marcoule G3[5]UNGG40 MW43 MW01.03.195604.04.196004.04.196020.06.1984
Celestin 1[6]Tritium breeder    19672009
Celestin 2Tritium breeder    19682009
Phénix[7]Fast breeder130 MW142 MW01.03.1968 14.07.197401.02.2010

2011 explosion

On 12 September 2011, there was an explosion in an oven used to melt metallic waste of a "weak and very weak" level of radioactivity, killing one person, and injuring four. The explosion happened in the Centraco centre, used by Socodei, a sister company of Électricité de France.[8][9] A safety cordon was set up around the plant by fire officers because of the risk of leakage.[8][9]

CEA VALRHO Marcoule

The CEA in Marcoule have numerous laboratories and research institutes which carry out research into;[10]

  • Nuclear reactor waste recycling
  • Future nuclear reactor technology (including a fourth generation prototype reactor to be ready by 2030)
  • Nuclear decommissioning technology

A science museum for the general public, Visiatome Marcoule, devoted to energy issues is located by the Marcoule site.

While most facilities are located at the main Marcoule site, a small number of facilities at Pierrelatte (located close at the Tricastin Nuclear Site) do also belong to the Marcoule Nuclear Site.

In 2007 over 500 million euros was spent supporting the work of the 30 laboratories.[11]

References

  1. "Ministries spar as Japan focuses on fast reactor project in France". Asahi Shimbun. 22 September 2016. Retrieved 3 December 2016.
  2. "France cancels ASTRID fast reactor project". Nuclear Engineering International. 2 September 2019. Retrieved 12 September 2019.
  3. Reference: Liste der Nuklearanlagen in Frankreich
  4. "Nuclear Power Reactor Details - G-2 (MARCOULE)". Power Reactor Information System. International Atomic Energy Agency. Retrieved 12 September 2011.
  5. "Nuclear Power Reactor Details - G-3 (MARCOULE)". Power Reactor Information System. International Atomic Energy Agency. Retrieved 12 September 2011.
  6. History The plant of Marcoule areva.com
  7. "Nuclear Power Reactor Details - PHENIX". Power Reactor Information System. International Atomic Energy Agency. Retrieved 12 September 2011.
  8. 1 2 "France Nuclear: Marcoule Site Explosion Kills One". BBC News. 12 September 2011. Retrieved 12 September 2011.
  9. 1 2 Willsher, Kim (12 September 2011). "Explosion at French Nuclear Waste Plant". The Guardian. Retrieved 12 September 2011.
  10. {fr}http://www-marcoule.cea.fr/scripts/home/publigen/content/templates/show.asp?P=134&L=FR&ITEMID=4
  11. {fr}http://www-marcoule.cea.fr/home/liblocal/docs/UCAP/PORTAIL/Plaquette%20CEA%20Marcoule%20en%20bref.pdf Archived 2016-03-03 at the Wayback Machine
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.