St Michaels
Merseyrail
General information
LocationSt Michael's Hamlet, Liverpool
England
Coordinates53°22′33″N 2°57′10″W / 53.3757°N 2.9529°W / 53.3757; -2.9529
Grid referenceSJ367869
Managed byMerseyrail
Transit authorityMerseytravel
Platforms2
Other information
Station codeSTM
Fare zoneC1
ClassificationDfT category E
Key dates
1864Opened
1972Closed
1978Reopened
Passengers
2018/19Increase 1.129 million
2019/20Increase 1.309 million
2020/21Decrease 0.350 million
2021/22Increase 0.786 million
2022/23Increase 0.951 million
Notes
Passenger statistics from the Office of Rail and Road

St Michaels railway station is a railway station in St Michael's Hamlet, Liverpool, England, on the Northern Line of the Merseyrail suburban system. It is situated near, but not on St Michael's Road, Aigburth, a short distance to the south of the Lark Lane and Sefton Park neighbourhoods. The main station building sits at street level, over the lines which are in a cutting. Leading down to the platforms, from apertures in the station building, are ramps which were built for the International Garden Festival in 1984.

History

The station opened in 1864 as part of the Garston and Liverpool Railway line between Brunswick and Garston Dock. In 1865 the station and line were incorporated into the Cheshire Lines Committee.

The station closed in 1972 but reopened in 1978 as part of the KirkbyGarston line of the Merseyrail system. The reopening of the station was part-funded by Marks and Spencer, because of that company's use of the "St Michael" brand; this is recognised by a plaque at the site. Services were extended from Garston to Hunts Cross in 1983, and diverted to Southport instead of Kirkby in 1984.

From 11 December 2006 the Monday-Saturday evening service was increased to run every 15 minutes, instead of half-hourly as previously.

Facilities

Ramps, which were installed for the International Garden Festival in 1984, allow access to the platforms. Steps to street level (bypassing the ticket office) have been sealed off. In November 2021, the ramps were removed and the steps to the platform, previously sealed off, were reinstated. The removal of the ramps will allow for lifts to be installed at a later date.

The station is staffed 15 minutes before the first service and 15 minutes after the last service. There are toilets, platform CCTV and a booking office. There are departure and arrival screens on the platform for passenger information. The station has car parking for 4 vehicles, a cycle rack with 12 spaces and secure storage for 28 cycles.[1]

Merseytravel announced in April 2019 that they had been successful in a bid for funding lifts being installed at the station under the Department for Transport's ‘Access for All’ programme. The lifts are expected to be installed at some point over the following five years.[2]

Services

Trains operate every 15 minutes, Monday-Saturday to Southport via Liverpool Central to the north, and Hunts Cross to the south. On Sundays, services are every 30 minutes in each direction.[3]

References

  1. "St-michaels train station | timetable | ticket prices & facilities". www.merseyrail.org. Retrieved 25 February 2017.
  2. McDonough, Tony (5 April 2019). "Merseytravel secures funding for passenger lifts at six Merseyrail stations". Liverpool Business News. Retrieved 8 April 2019.
  3. GB eNRT May 2016 Edition, Table 103
Preceding station National Rail National Rail Following station
Brunswick
towards Southport
  Merseyrail
Northern Line
  Aigburth
towards Hunts Cross
  Historical railways  
Brunswick (Original)
Line and station closed
  Cheshire Lines Committee
Garston and Liverpool Railway
  Otterspool
Line open, station closed
Saint James
Line open, station closed
   
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.