Thames Gateway Water Treatment Works
Desalination plant
Daily capacity100 megalitres
Cost£250 million
Energy usage14 MW
TechnologyReverse osmosis
Completion date2 June 2010 (2010-06-02)

The Thames Gateway Water Treatment Works or Beckton Desalination Plant is a desalination plant in Beckton, London, adjacent to Beckton Sewage Treatment Works.[1] The plant takes brackish water from the River Thames and converts it into drinkable water through a reverse osmosis process. The first of its kind in the UK, it was built for Thames Water by a consortium of Interserve, Atkins Water and Acciona Agua.[2] It was opened by Prince Philip, Duke of Edinburgh, on 2 June 2010.[3] It was planned to provide up to 150 million litres of drinking water each day enough for 900,000 Londoners.[4][5][6][7] but by 2023 had only operated on three occasions, and at two-thirds of its planned capacity.

Background

Much of the supplied area is classed by the Environment Agency as 'seriously water stressed'. Customers in London, Swindon and Oxford see hose pipe bans during quite minor droughts. The plant is built to treat water from brackish outflows of the Tideway. Turning this into drinking water is a way to reduce such bans and postpone the risk of severe water rationing into the long term; see the Thames Water Abingdon Reservoir scheme for longer-term supply infrastructure expansion.[8][9]

Section 37 of the Water Act 2003 repealed Section 1 of the Metropolis Water Act 1852. This move ended the ban of the Tideway as a supply of water for drinking, being "no longer required to protect public health" per Baroness Farrington of Ribbleton and Baroness Byford.[10]

Architects Broadway Malyan designed the plan to RIBA Stage D and acted as expert witness at public enquiry.[11]

Facts and figures

The plant was planned to supply 150 million litres of water a day which caters for 400,000 households or 900,000 people in the high-demand seasons when it is most-run. Its supply is pumped to north-east London in an 8-mile (13 km) pipe which can hold 14 million litres of water, of 1.2 metre diameter.[8] The peak energy consumption of the plant is 17.6 MW in worst-case conditions, and the average power consumption was estimated at 14 MW, which results in an energy usage of 2.27 kWh per cubic metre of water produced.[12]

In 2022, Thames Water revised the usable output of the plant down to 100 megalitres per day, because of "unrealistic expectations" in the design.[7][13]

Development

The total cost of the scheme including the pipeline was £250 million. The route avoided much disturbance to residents. All construction sites were environmentally screened and the surrounds returned to their original condition.[8]

Thames Water had planned to build four more desalination plants, but this has not progressed.[7]

Operation

The plant takes water from the Tideway during the last three hours of ebb, storing the water in a reservoir to minimise the salinity of the water processed. The water is first treated by a conventional settlement and filtration before the salinity is removed by reverse osmosis. Mineral salts, as found in the company's conventional water sources, are added before final purification.[14]

The plant is intended to be used during times of low natural water supply and exceptional demand. The operating license dictates that the plant can only be operated if required by Thames Water's drought management plan, when the river flows at Teddington are less than 3000 megalitres per day. It can also be used in operational emergencies.[15]

In 2022, some industry sources said the plant had been effectively mothballed because of high running costs. It was not used in the very dry conditions of summer 2022 because of "necessary planned work".[7][16] Labelled a "white elephant" by MPs, Beckton has operated just three times since it opened and can only supply two-thirds of its planned 150m litres a day. In 2023, Thames Water said difficulties sourcing the carbon dioxide needed to make the water drinkable meant it would be unavailable until July 2023.[17]

Criticism

London Mayor Ken Livingstone criticised the plant in 2007, calling it a "misguided and a retrograde step in UK environmental policy." Livingstone, arguing that the plant was expensive and unnecessary, said that Thames Water should instead focus on reducing waste caused by leakage and that people should be encouraged "to use less water, not more."[18] Livingstone blocked the plans as “unnecessary and unsustainable”, but it was given approval when Boris Johnson became mayor in 2008.[7]

References

  1. Thames Water Desalination Plant: water-technology.net
  2. Interserve group to build £200m Thames Gateway water scheme Building Magazine 9 July 2009 Retrieved 2 April 2013
  3. "Salt water plant opened in London". BBC News. 2 June 2010. Retrieved 17 August 2016.
  4. Thames Water website - Then and now
  5. "UK gets first desalination plant", BBC News, July 18, 2007.
  6. "The Place That Will Save Us when There's a Drought: London's Desalination Plant". 7 October 2015.
  7. 1 2 3 4 5 Gatten, Emma (3 August 2022). "London's desalination plant won't be fired up even if official drought is declared". The Daily Telegraph. Retrieved 4 August 2022.
  8. 1 2 3 "How the treatment works operates". Thames Water. Retrieved 22 June 2014.
  9. Scott, M. (2012). "Increasing population and the environment: How do the numbers stack up?". Significance. 9: 8–12. doi:10.1111/j.1740-9713.2012.00536.x.
  10. "Efficient Use of Water Resources". Parliamentary Debates (Hansard). House of Lords. 24 June 2003. col. 276.
  11. "Broadway Malyan | Tag | ArchDaily". www.archdaily.com. Retrieved 9 September 2021.
  12. An Overview of the 150,000 m3/day Beckton Desalination Plant in London. IDA World Congress. Dubai. November 2009.
  13. "Thames Water Drought Plan 2017 - Addendum May 2020" (PDF). Thames Water. May 2020.
  14. "How the treatment works operates". www.thameswater.co.uk. Thames Water.
  15. "Final Drought Plan" (PDF). Thames Water. April 2017.
  16. Gatten, Emma; Gutteridge, Nick (3 August 2022). "Water plant that could prevent hosepipe ban 'secretly mothballed'". The Daily Telegraph. Retrieved 4 August 2022.
  17. Lawson, Alex (30 June 2023). "Sewage in kitchens and 'white elephant' projects: why Thames Water is struggling". Guardian. Retrieved 30 June 2023.
  18. "Mayor critical of government plans to approve desalination plant". Greater London Authority. 15 June 2007. Archived from the original on 7 May 2008.

51°30′56″N 0°05′34″E / 51.51554°N 0.09278°E / 51.51554; 0.09278

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.