Kochi Metro - Phase 1 Route Map

This is a list of stations of the Kochi Metro. There are 25 stations planned on the line from Aluva to Tripunithura railway station[1][2] 24 of them are currently in operation as of September 1, 2022.[3]

Stations

Terminal station
†† Transfer station to Indian Railways
#* Terminal and transfer station to Indian Railways

Operational

Sr No Station Name Opened Height of
Rail Level
Platform
Type
Alignment Description Location
(in coordinates)
Notes Refs
English Malayalam
1 Aluva ആലുവ 19 June 2017 12.5 m Side Curved
(at 1000m)
10°06′35″N 76°20′59″E / 10.1098°N 76.3496°E / 10.1098; 76.3496 [4]
2 Pulinchodu പുളിഞ്ചോട് 19 June 2017 12.5 m Side Curved 10°05′42″N 76°20′48″E / 10.095120°N 76.346661°E / 10.095120; 76.346661 [5][6]
3 Companypady കമ്പനി പടി 19 June 2017 12.5 m Side Straight 10°05′14″N 76°20′34″E / 10.087293°N 76.342840°E / 10.087293; 76.342840 [7]
4 Ambattukavu അമ്പാട്ടുകാവ് 19 June 2017 12.5 m Side Straight 10°04′46″N 76°20′20″E / 10.079372°N 76.339004°E / 10.079372; 76.339004 [8][9]
5 Muttom മുട്ടം 19 June 2017 12.5 m Side &
Island
Straight Curved 10°04′22″N 76°20′01″E / 10.0727°N 76.3337°E / 10.0727; 76.3337 [10][11]
6 Kalamassery†† കളമശ്ശേരി 19 June 2017 12.5 m Side Straight 10°03′30″N 76°19′19″E / 10.058400°N 76.321926°E / 10.058400; 76.321926 Transfer to Kalamassery railway station [12]
7 Cochin University കൊച്ചിൻ സർവ്വകലാശാല 19 June 2017 12.5 m Side Curved 10°02′49″N 76°19′06″E / 10.046879°N 76.318377°E / 10.046879; 76.318377 [13]
8 Pathadipalam പത്തടിപ്പാലം 19 June 2017 12.5 m Side Straight 10°02′09″N 76°18′52″E / 10.035948°N 76.314371°E / 10.035948; 76.314371 [14]
9 Edapally ഇടപ്പള്ളി 19 June 2017 12.5 m Side Straight 10°1′35.96″N 76°18′33.33″E / 10.0266556°N 76.3092583°E / 10.0266556; 76.3092583 (Edappally Junction Metro Station) [15][16]
10 Changampuzha Park ചങ്ങമ്പുഴ പാർക്ക് 19 June 2017 12.5 m Side Straight 10°0′54.64″N 76°18′8.26″E / 10.0151778°N 76.3022944°E / 10.0151778; 76.3022944 (Edappally Metro Station) [17]
11 Palarivattom പാലാരിവട്ടം 19 June 2017 12.5 m Side Straight 10°0′32.27″N 76°18′13.86″E / 10.0089639°N 76.3038500°E / 10.0089639; 76.3038500 (Palarivattom Metro Station) [18]
12 J. L. N. Stadium ജെ. എൽ. എൻ. സ്റ്റേഡിയം 3 October 2017 12.5 m Side Straight 10°0′1.86″N 76°17′56.41″E / 10.0005167°N 76.2990028°E / 10.0005167; 76.2990028 (Nehru Stadium Metro Station) [19]
13 Kaloor കലൂർ 3 October 2017 12.5 m Side Straight 9°59′40.62″N 76°17′29.77″E / 9.9946167°N 76.2916028°E / 9.9946167; 76.2916028 (Kaloor Metro Station) [20]
14 Town Hall†† ടൗണ്‍ ഹാൾ 3 October 2017 12.5 m Side Straight 9°59′28.4″N 76°17′16.9″E / 9.991222°N 76.288028°E / 9.991222; 76.288028 (Lissie Metro Station) Transfer to Ernakulam Town railway station [21]
15 M. G. Road എം. ജി. റോഡ് 3 October 2017 12.5 m Side Straight 9°59′2.64″N 76°16′55.38″E / 9.9840667°N 76.2820500°E / 9.9840667; 76.2820500 (Madhava Pharmacy Metro Station) [22]
16 Maharaja's College മഹാരാജാസ് കോളേജ് 3 October 2017 12.5 m Side Straight 9°58′24.34″N 76°17′05.96″E / 9.9734278°N 76.2849889°E / 9.9734278; 76.2849889 (Maharaja College Metro Station) [23]
17 Ernakulam South†† എറണാകുളം തെക്ക് 3 September 2019 12.5 m Side Straight 9°58′3.92″N 76°17′28.60″E / 9.9677556°N 76.2912778°E / 9.9677556; 76.2912778 (Ernakulam Junction Metro Station) Transfer to Ernakulam Junction railway station [24]
18 Kadavanthra കടവന്ത്ര 3 September 2019 12.5 m Side Straight 9°57′59.72″N 76°17′53.73″E / 9.9665889°N 76.2982583°E / 9.9665889; 76.2982583 (GCDA Metro Station) [25]
19 Elamkulam ഇളങ്കുളം 3 September 2019 12.5 m Side Straight 9°58′01″N 76°18′30″E / 9.967075°N 76.308364°E / 9.967075; 76.308364 [26]
20 Vyttila വൈറ്റില 3 September 2019 12.5 m Side Straight 9°58′03″N 76°19′14″E / 9.967477°N 76.320426°E / 9.967477; 76.320426 [27]
21 Thaikoodam തൈക്കൂടം 3 September 2019 12.5 m Side Straight 9°57′36″N 76°19′25″E / 9.960080°N 76.323708°E / 9.960080; 76.323708 [28][29]
22 Pettah പേട്ട 7 September 2020 12.5 m Side Straight 9°57′04″N 76°19′52″E / 9.951161°N 76.331004°E / 9.951161; 76.331004 [30]
23 Vadakkekotta വടക്കേക്കോട്ട 1 September 2022 12.5 m Side Straight [31]
24 SN Junction എസ്എൻ ജംഗ്ഷൻ 1 September 2022 12.5 m Side Straight [31]
25 Thrippunithura Terminal†† തൃപ്പൂണിത്തുറ ടെർമിനൽ [31]

References

  1. Metro Rail: List of stations in phase 1
  2. Metro Stations
  3. "Metromap.in".
  4. "Now, e-bus service connects Kochi airport with metro". The Week. 20 February 2020. Retrieved 21 February 2020.
  5. "Metro station of the future". The New Indian Express. 4 July 2009. Retrieved 5 July 2009.
  6. "Metro corridors face a footpath problem". Times of India. 23 July 2019. Retrieved 24 July 2019.
  7. "Kochi Metro to harvest rainwater at all stations". The New Indian Express. 5 July 2020. Retrieved 6 July 2020.
  8. "The transgender staff of India's newest metro service". BBC News. 22 May 2017. Retrieved 23 May 2017.
  9. "Tech snag hits Kochi Metro, services partially disrupted". Manorama News. 5 July 2018. Retrieved 6 July 2018.
  10. "Sub-station at Muttom Metro depot switched on". The Hindu. 5 January 2016. Retrieved 6 January 2016.
  11. "Kochi metro operations' control centre to be established at Muttom". The Hindu. 11 March 2014. Retrieved 19 May 2016.
  12. "Kochi Metro Rail stations could turn mini shopping malls soon". The News Minute. 15 November 2017. Retrieved 16 November 2017.
  13. "Now, carry your cycle with you on metro". The Hindu. 18 November 2020. Retrieved 19 November 2020.
  14. "Test piling at Pathadipalam begins". The New Indian Express. 11 June 2013. Retrieved 12 June 2013.
  15. "Edappally to be all-women metro station". The Hindu. 7 March 2018. Retrieved 8 March 2018.
  16. "₹239-crore pact signed for improving metro corridor". The Hindu. 5 February 2020. Retrieved 6 February 2020.
  17. "KMRL launches feeder service to collectorate". The New Indian Express. 18 November 2020. Retrieved 19 November 2020.
  18. "Metro to Kakkanad: Decks cleared for road widening". Times of India. 25 November 2020. Retrieved 26 November 2020.
  19. "Metro starts feeder service from JLN Stadium to Infopark". The New Indian Express. 14 March 2020. Retrieved 15 March 2020.
  20. "KMRL takes up projects to clear waterlogging in Kochi". The Hindu. 13 May 2020. Retrieved 14 May 2020.
  21. "Lissie metro station to be Town Hall stop from tomorrow". The New Indian Express. 31 January 2020. Retrieved 1 February 2020.
  22. "Kochi Metro Rail to launch accommodation facility". The New Indian Express. 22 May 2018. Retrieved 23 May 2018.
  23. "Kochi Metro runs up to Maharaja's". Deccan Chronicle. 3 October 2017. Retrieved 4 October 2020.
  24. "Surprise, surprise! Two commuters inaugurate Kochi Metro station building". The New Indian Express. 6 November 2020. Retrieved 7 November 2020.
  25. "Kochi Metro's new stretch from Maharaja College to Thaikoodam with 5 new stations opens – details of new route". Financial Express (India). 5 September 2019. Retrieved 6 September 2019.
  26. "Kochi: New metro stations have little parking facilities". Deccan Chronicle. 29 August 2019. Retrieved 30 August 2019.
  27. "Metro station at Vyttila mobility hub on the cards". The Hindu. 29 February 2012. Retrieved 1 March 2012.
  28. "Trial run begins on metro's Thykoodam-Pettah viaduct". The Hindu. 17 September 2019. Retrieved 18 September 2019.
  29. "Roadside parking at Thykoodam Metro station becomes a menace". Deccan Chronicle. 17 September 2019. Retrieved 18 September 2019.
  30. "Kochi Metro ready for commercial operations between Aluva and Pettah". Times of India. 29 May 2020. Retrieved 30 May 2020.
  31. 1 2 3 "Centre focussed on improving Kerala's connectivity: PM Modi". OnManorama. Retrieved 2 September 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.