History
United States
NameStamford
NamesakeCity of Stamford, Connecticut
BuilderAmerican Shipbuilding Company, Lorain, Ohio
Laid downCanceled
ReclassifiedFrom patrol gunboat, PG-203, to patrol frigate, PF-95, 15 April 1943
FateConstruction contract cancelled, 31 December 1943
General characteristics
Class and typeTacoma-class frigate
Displacement1,264 long tons (1,284 t)
Length303 ft 11 in (92.63 m)
Beam37 ft 11 in (11.56 m)
Draft13 ft 8 in (4.17 m)
Propulsion
  • 2 × 5,500 shp (4,101 kW) turbines
  • 3 boilers
  • 2 shafts
Speed20 knots (37 km/h; 23 mph)
Complement190
Armament

USS Stamford (PF-95) was a United States Navy Tacoma-class frigate authorized for construction during World War II but cancelled before construction could begin.

Stamford originally was authorized as a patrol gunboat with the hull number PG-203, but she was redesignated as a patrol frigate with the hull number PF-95 on 15 April 1943. She was assigned the name Stamford on 30 August 1943.

Plans called for Stamford to be built under a Maritime Commission contract by the American Shipbuilding Company at Lorain, Ohio, as a Maritime Commission Type T. S2-S2-AQ1 hull. However, the contract for her construction for the U.S. Navy was cancelled on 31 December 1943 prior to the laying of her keel.

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.