Zhuhai–Zhuhai Airport
intercity railway
Overview
Native name珠机城际轨道交通
珠机线
StatusOperational (Phase 1)
LocaleZhuhai, Guangdong, China
Termini
Service
TypeRegional rail
SystemPearl River Delta Metropolitan Region intercity railway
Operator(s)China Railway Guangzhou Group
History
Planned opening2023 (Phase 2)
Opened18 August 2020 (Phase 1)[2]
Technical
Line length16.86 km (Phase 1)
39.475 km (full line)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Zhuhai to Zhuhai Airport railway track under construction.

Zhuhai–Zhuhai Airport intercity railway, also known as the Zhuji intercity railway, is a regional railway in Zhuhai. The Phase 1 runs from Zhuhai railway station to Zhuhai Changlong railway station, while Phase 2 will terminate at Zhuhai Jinwan Airport. It is operated by China Railway Guangzhou Group. The railway is an extension of the Guangzhou–Zhuhai intercity railway.

The construction of the railway will be split into two stages: Phase 1 from Zhuhai to Zhuhai Changlong.[1] Phase 1 started operation on 18 August 2020 (except Wanzai).[2][3] Phase 2 from Zhuhai Changlong to Zhuhai Airport will open in 2023.[4]

In November 2022, construction of the main structure of Hezhou South Station was completed.[5]

Stations

Station Name Chinese Distance
km
Pearl River Delta intercity railway transfers/connections Metro
transfers/connections
Location
Zhuhai 珠海 0.00 0.00  GZ  Xiangzhou
Wanzai North (Wanzaibei) 湾仔北
Wanzai 湾仔  Taipa  (Barra station, via undersea tunnel)
Shizimen 十字门
Hengqin North (Hengqinbei) 横琴北
Hengqin 横琴  Hengqin Extension 
Zhuhai Changlong 珠海长隆[1] 16.86
Jingwan 井湾[6]
Hezhou South (Hezhounan) 鹤洲南 Jinwan
Sanzao East (Sanzaodong) 三灶东
Zhuhai Airport 珠海机场  GFJZ 

References

  1. 1 2 3 "开始试运行!珠机城际离开通不远啦". Retrieved 2020-08-16.
  2. 1 2 "粤港澳大湾区又有新线开通!珠机城际铁路开始售票". 羊城晚报. 2020-08-17.
  3. "今日开通!可直达珠海横琴了_澳门". www.sohu.com. Retrieved 2020-08-18.
  4. "珠机城际二期隧道工程即将全面开建". SouthCN. Nanfang. Retrieved 24 March 2019.
  5. "Construction completed on Hezhou South Station". cityofzhuhai.com. 21 November 2022.
  6. "[广东]提前一年!珠机城际二期三灶隧道盾构区间实现双线贯通". 2020-07-30.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.