History
PRC
Name809 Floating dock
NamesakeFloating dock
Builder4805th Factory
Laid down1967
LaunchedJune 27, 1970
Commissioned1971
In service1971
General characteristics
Displacement518.17 long tons (526.49 t)
Length41 m (134 ft 6 in)
Beam12 m (39 ft 4 in)
Draught1.41 m (4 ft 8 in)
Depth7.1 m (23 ft 4 in)
Propulsion2 marine diesel engines
Speed8.5 knots (15.7 km/h; 9.8 mph)

120-ton class dry dock is a class of naval auxiliary ship in service with the People's Liberation Army Navy (PLAN). Only a single unit was completed with hull number 809, and it was originally given the name 809 Floating dock after the hull number.[1] However, the pennant number and its name may have been changed due to the change of Chinese naval ships naming convention.

Designed in Shanghai by Shenjia Shipyard (申佳船厂), also known as the 4805th Factory of PLAN in Shanghai in the mid-1960s, construction begun at the same shipyard in 1967 after design was completed, during the greatest political turmoil in China at the time, namely, Cultural Revolution. The result was the delay of the program, with the launching of the vessel did not commence until approximately three years later on June 27, 1970.[1] The program suffered another serious blow approximately two months after the launching on August 31, 1970, when copper workers operated against the regulation by opening the valve, resulting in the sinking of the vessel. The salvage and repair cost totaled ¥120,000 and delayed the program further for two more months, with sea trials finally conducted in October 1970. The dry dock was finally completed and handed over to PLAN in 1971 for naval base in Fujian.[1]

Class Pennant # Builder Launched Commissioned Status Fleet
120-ton 809 4805th Factory June 27, 1970 1971 Active East Sea Fleet

References

  1. 1 2 3 "120t-class drydock". shtong.gov.cn. Retrieved 5 August 2015.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.