This article lists events related to rail transport that are currently scheduled to occur in 2030. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Events
Unknown date
- – Opening of the Dhaka Metro Rail MRT 2.
- – Full completion of the Sichuan–Tibet railway.[1]
- – Latest expected opening of the Lisbon–Porto high-speed rail line.[2]
- – Latest expected opening of the Hokkaido Shinkansen from Shin-Hakodate-Hokuto to Sapporo.[3]
- – Completion of Phase I of the Cross Island MRT line.[4]
- – Expected completion of the Madrid–Extremadura high-speed rail line.[5]
- – Earliest expected opening of the C Line Extension in Los Angeles County.[6]
- – Planned completion of the first phase of the East San Fernando Valley Light Rail Transit Project in the San Fernando Valley.[7]
- – Completion of South Coast Rail Phase II, which will reactivate tracks past a previous branch to meet with the line to Fall River, Massachusetts.[8]
- – The earliest upgrade of Žilina-Poprad railway up to 160km/h.
- – Altamont Corridor Express and Amtrak San Joaquins are expected to begin services to Merced,[9][10] upon which it will become the southern terminus of the San Joaquins.
- – Altamont Corridor Express is planned to commence a spur line service to Union City station in the East Bay.[11][12]
- – Expected opening of Line 2, Ho Chi Minh City Metro.[13][14]
References
- ↑ "川藏铁路雅林段"一头一尾"站前工程招标,计划4月开工". 2021-01-31.
- ↑ "Portugal to invest 43 billion euros in large infrastructure by 2030, PM says". Reuters. 22 October 2020. Retrieved 5 January 2021.
- ↑ Ayateru, Hosozawa (8 June 2018). "Next Shinkansen will not only be faster, safer, but save on power". Asahi Shimbun. Archived from the original on 8 June 2018. Retrieved 11 May 2019.
- ↑ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Ministry of Transport (MOT). Archived from the original on 17 May 2021. Retrieved 17 May 2021.
- ↑ Sánchez Rodríguez, Rocío (3 January 2021). "Extremadura: AVE con destino a 2030". El Periódico Extremadura.
- ↑ Sharp, Steven (9 August 2022). "Metro rolls out new options for C Line extension to Torrance". Urbanize Los Angeles. Retrieved 12 August 2022.
- ↑ "May 2023 LA Metro update to FTA on ESFV project". 5 June 2023. Retrieved 5 June 2023.
- ↑ Laidler, John (June 16, 2017). "Sharp differences over latest plan for South Coast Rail". Boston Globe. Retrieved June 18, 2017.
- ↑ Holland, John (4 December 2021). "Board advances ACE service to Turlock and Merced County. When will first train run?". Modesto Bee. Retrieved 9 December 2021.
- ↑ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved 13 March 2023.
- ↑ Krause, Daniel; Mangonon, Anthony (June 1, 2022). Deliverable 3.1.3 (Initial Service and Operations Planning Analysis) (PDF). Wordpress (Report). AECOM. Retrieved 21 December 2023.
- ↑ "Union City on track to become regional transit hub by 2030". East Bay Echo. December 12, 2023. Retrieved 22 December 2023.
- ↑ VietnamPlus (2022-03-02). "Completion schedule of HCM City Metro Line No.2 extended to 2030 | Society | Vietnam+ (VietnamPlus)". VietnamPlus. Retrieved 2022-10-18.
- ↑ VnExpress. "HCMC shifts parking lot focus from underground to high above - VnExpress International". VnExpress International – Latest news, business, travel and analysis from Vietnam. Retrieved 2022-10-18.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.