Anglo-Chinese School (Barker Road)
Address
60 Barker Road, Singapore

309919
Coordinates1°19′10.9″N 103°50′8.7″E / 1.319694°N 103.835750°E / 1.319694; 103.835750
Information
TypeGovernment-aided
MottoThe Best Is Yet To Be
Religious affiliation(s)Christianity
DenominationMethodist
Established1 March 1886 (1886-03-01)
FounderWilliam Fitzjames Oldham
Sister schoolMethodist Girls' School, Singapore
SuperintendentToh Chye Seng
School code7032
ChairmanRichard Seow (ACS Board of Governors)
PrincipalTse Horng Khoo
ChaplainMalcolm Tan
GenderBoys
Enrolment1450
Colour(s) Red   Blue   Gold 
SongACS Anthem
AffiliationsAnglo-Chinese Junior College
Websitewww.acsbr.moe.edu.sg

Anglo-Chinese School (Barker Road) is a government-aided Methodist all-boys' secondary school located at Barker Road in Newton, Singapore. It is a member of the Anglo-Chinese family of schools in Singapore. It offers the Singapore-Cambridge GCE Ordinary Level course for its students from Sec 1 to Sec 4/5. Students may then move on to Anglo-Chinese Junior College or Anglo-Chinese School (Independent). It has provided opportunities for its feeder students to continue with an ACS Education at a secondary level. ACS was also the first school in Singapore to have a flower named after it, the Ascocenda Anglo-Chinese School orchid, a hybrid created by the school to mark its 116th Founder's Day on 1 March 2002. ACS has many partner schools such as Anglo-Chinese School (Junior) and Anglo Chinese Junior College. The school is close to Newton MRT station.

It was a full school which subsumed Anglo-Chinese School (Primary) as its primary school section until 1998, when the school split into two. The school has been based at the newly rebuilt Barker Road campus since 2003. Its current principal is Mr. Khoo Tse Horng, while long-serving principal Mr. Ng Eng Chin is now retired and Mr. Peter Tan Chong Tze became principal of Queensway Secondary School until 2023. Mr. Loo Ming Yaw headed the school as Principal from 2018 to 2023 before his posting as principal of Millennia Institute in January 2024.

Barker Road campus

Anglo-Chinese School (Barker Road) with its distinctive clock tower. The Barker Road Campus also houses Anglo-Chinese School (Primary).

In 1999, ACS (Barker Road) moved out of the campus after a closing ceremony on 4 November, to allow the campus to be redeveloped. An issue developed after plans were revealed to dismantle the historic Art Deco clock tower facing Dunearn Road due to safety concerns. This conflict was resolved and the dismantling went ahead. A replica now stands 20 metres from the old clock tower, with the original clock mechanism installed in the new tower.

The 5.2-hectare campus now contains the primary and secondary blocks of ACS (Primary) and ACS (Barker Road) respectively. In between the primary and secondary buildings is an administrative block housing the administrative office as well as the two libraries. The landscaped, open-air Student Plaza links the three buildings together. The cafeteria, bookstore, CCA rooms and Music Studios are one floor below the Plaza. The Arts Centre contains the Mrs Lee Choon Guan Concert Hall, Tan Cheng Siong Drama Theatre and the Lee Kong Chian Auditorium which can seat 830, 270 and 1,200 respectively.

The sports complex also sits on the campus, containing the Shaw Pool and the Tan Chin Tuan Sports Hall. The Sports Hall has three basketball courts, a racket centre, full recreational facilities including a gym and changing rooms. The Olympic-size pool has eight lanes. The Transport Centre/carpark is below the complex.

Barker Road Methodist Church and the Methodist Centre (housing the Methodist Church in Singapore) have also been relocated to the redeveloped Barker Road campus. ACS Oldham Hall has also been renovated with improved facilities, such as air-conditioning in some rooms, a cafeteria, and the capacity to house 500 borders. The Barker Road campus was designed by SAA Architects Pte and the entire project cost was S$95 million, of which S$15 million had to be raised by the school. In 2004, the campus won the CIDB Award for Construction Excellence.

Construction is underway for a new sports facility featuring two indoor sports halls and an artificial field, known as the AstroTurf. Along with this, a new 7-story building is being built for academic purposes, near the site of the clock tower. Construction was expected to be completed by the end of 2020, however due to Covid-19 the project was delayed.

Notable alumni

See also

References

  • Earnest Lau and Peter Teo, The ACS Story, ISBN 981-04-8746-0
  • ECHO Magazine, Oct-Dec 2004
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.