Noida Metro Aqua Line
Overview
StatusOperational
OwnerNoida Metro Rail Corporation
LocaleNoida, Greater Noida
Termini
Stations21
Service
TypeRapid transit
SystemNoida Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockCRRC Corporation
Daily ridershipNA
History
Opened25 January 2019 (2019-01-25)[1]
Technical
Line length29.7 kilometers (18.5 mi)[2]
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Noida Sector 51
Noida Sector 50
Noida Sector 76
Noida Sector 101
Noida Sector 81
NSEZ
Noida Sector 83
Noida Sector 137
Noida Sector 142
Noida Sector 143
Noida Sector 144
Noida Sector 145
Noida Sector 146
Noida Sector 147
Noida Sector 148
Knowledge Park II
Pari Chowk
ALPHA 1
DELTA 1
GNIDA Office
Depot

The Aqua Line is a line of Noida Metro, a rapid transit system in Noida and Greater Noida in Uttar Pradesh, India. It consists of 21 metro stations from Sector 51 in Noida to Depot in Greater Noida.[3]

The line has been operational since 25 January 2019. It was inaugurated by Chief Minister of Uttar Pradesh Yogi Adityanath.[4]

Stations

All 21 stations on the 29.7 kilometres (18.5 mi) Aqua Line route are on elevated track.[5][6][7] This line has an interchange station with the Delhi Metro at Noida Sector 52 metro station.[8] All stations are equipped with platform screen doors.

Aqua Line
# Station name Total length in metres Interstation distance in metres Inauguration date Connections Layout
EnglishHindi
1Noida Sector 51नोएडा सेक्टर ५१0.0000.00025 January 2019Blue LineElevated
2Noida Sector 50नोएडा सेक्टर ५०1041.51041.525 January 2019NoneElevated
3Noida Sector 76नोएडा सेक्टर ७६2095.01053.525 January 2019NoneElevated
4Noida Sector 101नोएडा सेक्टर १०१3105.21010.225 January 2019NoneElevated
5Noida Sector 81नोएडा सेक्टर ८१4228.91123.725 January 2019NoneElevated
6NSEZएन॰एस॰ई॰ज़ेड॰5153.3924.425 January 2019NoneElevated
7Noida Sector 83नोएडा सेक्टर८३71301976.725 January 2019NoneElevated
8Noida Sector 137नोएडा सेक्टर १३७8279.41149.425 January 2019NoneElevated
9Noida Sector 142नोएडा सेक्टर १४२9631.11351.725 January 2019NoneElevated
10Noida Sector 143नोएडा सेक्टर 1४३11279.11648.025 January 2019NoneElevated
11Noida Sector 144नोएडा सेक्टर १४४12500.61221.525 January 2019NoneElevated
12Noida Sector 145नोएडा सेक्टर १४५13852.81352.225 January 2019NoneElevated
13Noida Sector 146नोएडा सेक्टर १५३15084.11231.325 January 2019NoneElevated
14Noida Sector 147नोएडा सेक्टर १४७16617.11533.025 January 2019NoneElevated
15Noida Sector 148नोएडा सेक्टर १४८25 January 2019NoneElevated
16Knowledge Park IIनॉलेज पार्क II19910.63293.525 January 2019NoneElevated
17Pari Chowkपरी चौक222392328.425 January 2019NoneElevated
18Alpha 1एल्फा १24010.8921.825 January 2019NoneElevated
19Delta 1डेल्टा १25096.71085.925 January 2019NoneElevated
20GNIDA Officeग्रेनो ऑफिस26182.61855.825 January 2019NoneElevated
21Depotडिपो27881.41699.025 January 2019NoneElevated

Construction

The NMRC has divided the Civil Construction work of Aqua Line (21 stations and 1 Depots) into multiple packages. The list of all construction contract is as follows:

Package Stations Contractor
NC-01 Noida Sector-51 to Noida Sector-137
(8 stations)
CEC and Sam India Buitwell (JV)
NC-02 Noida Sector-142 to Noida Sector-148
(7 stations)
CEC and Sam India Buitwell (JV)
NC-03 Knowledge Park II to Depot
(6 stations)
CEC and Sam India Buitwell (JV)
NC-04 Greater Noida Depot
(1 Depot)
Anupam Constructions
NGNC-01 Noida Sector-122 to Gr. Noida Sector-2
(5 stations)
GR Infraprojects

Note: The construction work of Package NGNC-01 will start by 2023 end.

See also

References

  1. "Uttar Pradesh CM Yogi Adityanath to inaugurate Noida Metro's 'Aqua line' on Friday". Zee News. 24 January 2019. Retrieved 25 January 2019.
  2. "DMRC". Retrieved 16 November 2018.
  3. "Noida Aqua Metro Line to be inaugurated by CM Adityanath today; here's all you need to know". www.businesstoday.in. Retrieved 25 January 2019.
  4. "Uttar Pradesh CM Yogi Adityanath to inaugurate Noida Metro's 'Aqua line' on Friday". Zee News. 24 January 2019. Retrieved 25 January 2019.
  5. "STATIONS BETWEEN NOIDA-GREATER NOIDA". noidametrorail.com. Archived from the original on 26 March 2016.
  6. Damini Nath. "Noida Metro Projects Still Off-Track". The Hindu.
  7. "Metro rail link between Noida and Greater Noida to be completed by 2017". India TV News.
  8. "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation (DMRC). February 2015. Retrieved 28 June 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.