The B Sixth Avenue Express[3] is a rapid transit service in the B Division of the New York City Subway. Its route emblem, or "bullet", is colored orange, since it uses the IND Sixth Avenue Line in Manhattan.[4]
The B operates only on weekdays between Brighton Beach in Brooklyn and 145th Street in Harlem, Manhattan, making express stops in Brooklyn along the BMT Brighton Line and in Manhattan along Sixth Avenue, and making local stops along Central Park West. During rush hours, the B is extended beyond 145th Street to and from Bedford Park Boulevard in the Bronx, making local stops along Grand Concourse.
Prior to November 1967 the B ran almost exclusively in Manhattan, as the BB, from 168th Street in Washington Heights during rush hours to 34th Street–Herald Square in Midtown Manhattan. Upon the opening of the Chrystie Street Connection, the B started running via the BMT West End Line (local) and BMT Fourth Avenue Line (express) in Brooklyn. A short-lived B service marked with a yellow bullet ran via the BMT Broadway Line in Manhattan and the BMT West End Line in Brooklyn from 1986 to 1988 due to Manhattan Bridge renovation, while orange B service traveled the pre-1967 route between 168th and 34th Streets. After 1989, the B north of 47th–50th Streets–Rockefeller Center used the IND Eighth Avenue Line to 168th Street on weekdays, and the IND 63rd Street Line on evenings and weekends. Late night service ran as a shuttle on the West End Line. Weekday service was rerouted to the Concourse Line in 1998, while off-peak service along 63rd Street ceased in 2000. The B started using the Brighton Line in 2004 after work on the north side of the Manhattan Bridge was completed.
History
The designation B was originally intended for express trains originating from the Washington Heights neighborhood of Manhattan and operating in Midtown Manhattan on the IND Sixth Avenue Line. However, the original B service, beginning with the opening of the Sixth Avenue Line on December 15, 1940, ran as a rush-hour only local service between 168th Street–Washington Heights and 34th Street–Herald Square. This service was designated BB, conforming with the Independent Subway System (IND) convention using double letters to indicate local services.[5]
Chrystie Street Connection
The Chrystie Street Connection and the express tracks of the Sixth Avenue Line opened on November 26, 1967, radically changing service. BB trains were combined with the former T service, which ran on the BMT West End Line in Brooklyn and the BMT Broadway Line in Manhattan. This created a through service from 168th Street to Coney Island–Stillwell Avenue via the Sixth Avenue Line express tracks and the Manhattan Bridge.[6] During middays, service to and from Brooklyn terminated at West 4th Street. During late night hours and Sundays when B service did not operate, TT shuttles continued to operate on the West End Line.[7] On July 1, 1968, the B was rerouted to terminate at 57th Street in Midtown Manhattan during middays and evenings, extending to 168th Street only during rush hours. The West End Line shuttles were also made part of the B route.[8]
On June 1, 1976, the New York City Transit Authority (NYCTA) announced changes in subway service that were expected to save $12.6 million annually and were the third phase of the agency's plan to realign subway service to better reflect ridership patterns and reduced ridership. As part of the changes, which took effect on August 30, 1976, B service began running between 57th Street and Coney Island during all times, replacing K service, and alternate B trains commenced operating between 168th Street and Coney Island during rush hours.[9][10] On December 14, 1976, the NYCTA announced severe cuts in bus and subway service in order to cut its budget by $30 million over the following 18 months in order to achieve a balanced budget, at the request of the Emergency Financial Control Board.[11] As part of the cuts, late night B service was cut back to running as a shuttle between 36th Street and Coney Island via the West End Line. This change took effect on August 27, 1977. Initially, the 57th Street station was to be closed during late nights.[12] However, a B shuttle also operated during late nights, running between 47th–50th Streets–Rockefeller Center and 57th Street.[13][14][15]
The NYCTA approved four changes in subway service on April 27, 1981, including an increase in B service. The changes were made as part of the $1 million, two-year Rapid Transit Sufficiency Study, and were expected to take place as early as 1982, following public hearings and approval by the Metropolitan Transportation Authority (MTA) board. As part of the changes, midday B service was going to be increased, replacing AA service. B service on the West End Line and Fourth Avenue Line express was to be supplemented by a new rush hour T train, running between Bay Parkway and Chambers Street on the Nassau Street Line.[16]
On June 1, 1983, the NYCTA proposed changes to increase service along Sixth Avenue and better connecting the line to the Bronx and Queens. As part of the changes, B train service would run to 168th Street at all times, with service to 57th Street during non-rush hours replaced by a new H train running between 57th Street and World Trade Center. With the extension of B service to 168th Street, AA service would be eliminated. The changes would have gone into effect in spring or summer 1984, pending approval by the MTA board.[17]
Manhattan Bridge reconstruction (1986 to 2004)
1980s
The reconstruction of the Manhattan Bridge between 1986 and 2004 affected B service as the bridge's north side tracks, which led to the Sixth Avenue Line, were closed multiple times. These closures severed the connection between the northern and southern portions of the route. B service was split into two different services starting on April 26, 1986, with an expected completion date of October 26, 1986.[18] The closure of the bridge's north side tracks caused the return of pre-November 1967 service patterns, before the opening of the Chrystie Street Connection: The orange B duplicated the former BB service, and the yellow B imitated the old T service.[19] The northern B service ran via Sixth Avenue, using an orange bullet, between 34th Street-Herald Square and 168th Street during rush hours only. The southern B service ran via the bridge and BMT Broadway Line, using a yellow bullet. It ran from Coney Island-Stillwell Avenue and terminated at Astoria–Ditmars Boulevard rush hours; Queensboro Plaza middays, evenings, and weekends; and 36th Street late nights as a shuttle. Service to 57th Street and Grand Street was replaced by an S shuttle running between these two points via the Sixth Avenue local.[18] On May 24, 1987, evening and weekend Broadway Line B service was cut back from Queensboro Plaza to 57th Street–Seventh Avenue.[20]
Through B service on the Sixth Avenue Line resumed December 11, 1988, when the Manhattan Bridge's north side tracks reopened. Due to increased demand for Sixth Avenue service along Central Park West, B trains were extended local to 168th Street on middays and evenings, partially replacing the discontinued K service.[21] During late nights, the B continued to operate as the West End Shuttle from 36th Street to Coney Island. B service operated to 57th Street during weekends and N service was increased to replace B service to Ditmars Boulevard.[22][23] In May 1989, Sunday afternoon service was increased to run every 10 minutes instead of every 12 minutes.[24]
With the opening of the IND 63rd Street Line on October 29, 1989, B service was extended from 57th Street to 21st Street–Queensbridge on weekends.[25][26][27] In addition, the span of through service on weekends between Brooklyn and Manhattan was increased from 17 to 19 hours. The last Brooklyn-bound through train was the train leaving 57th Street at 1:12 a.m. as opposed to the one leaving at 12:11 a.m., and the first Manhattan-bound through trains were leaving Coney Island at 5:01 a.m. Saturdays and 5:21 a.m. Sundays, compared to 5:42 a.m. Saturday and 6:21 a.m. Sunday trains. Weekday service was also slightly modified, with Stillwell Avenue-bound trains running local along Fourth Avenue in Brooklyn until 8 a.m. instead of 7 a.m.[24]
On September 30, 1990, evening service was rerouted to 21st Street–Queensbridge to replace Q service with A service running local between 145th and 168th Streets in its place. B trains stopped operating between 47th–50th Streets–Rockefeller Center and 168th Street between 8:15 p.m. and 6:45 a.m., saving the NYCTA $1.35 million annually.[28] Also on this date, because N service resumed running via the Manhattan Bridge, B trains began skipping DeKalb Avenue.[29][30]
1990s
The north side of the Manhattan Bridge closed on middays and weekends from April 30, 1995, until November 12, 1995,[31] during which B trains ran only between Pacific Street and Coney Island–Stillwell Avenue, running local on the BMT West End Line and express on the BMT Fourth Avenue Line.[32]
From February 22, 1998, to May 22, 1999, B service was cut to 57th Street on evenings and weekends due to track and tunnel reconstruction of the IND 63rd Street Line. Service on that line was replaced by a shuttle to the BMT Broadway Line which ran every 20 minutes.[33][34] The 57th Street station was closed from 12:30 to 6 a.m. daily during the project.[35] The project had initially been slated to be completed in fall 1999,[36] but normal service resumed in May 1999, ahead of schedule.[34]
The B and the C switched northern terminals on March 1, 1998, ending the connection between the B and Washington Heights. The B was routed onto the IND Concourse Line to Bedford Park Boulevard during rush hours. Midday service terminated at 145th Street.[37][38] The change was made to reduce crowding on the C and to reduce passenger confusion about the C's route.[39]
2000s
On November 5, 2000, B service was taken off of the IND 63rd Street Line for signal and track work. It ran along the Eighth Avenue Line to 145th Street (terminating at Bedford Park Boulevard during rush hours) at all times except late nights.[40][41][42] A separate B Queensbridge Shuttle continued to operate via 63rd Street during the hours the Q was not running; service operated between 21st Street and 34th Street–Herald Square via the Broadway Line.[42] This shuttle service operated until January 2001, when the 63rd Street Connector east of 21st Street opened for night and weekend service diversions.[43]
On July 22, 2001, the Manhattan Bridge's north side tracks closed and B service over the Manhattan Bridge was split into two services, similar to the 1986 changes. This time, the southern half of the route that ran via the Broadway Line was named the W. B service ran on weekdays only, from 34th Street to Bedford Park Boulevard during rush hours and from 34th Street to 145th Street during middays and evenings.[44][45][46]
The Manhattan Bridge was fully reopened to subway service on February 22, 2004. B and D trains were once again extended through Grand Street station and over the bridge's north tracks into Brooklyn. However, rather than returning to the West End Line which it had served in some form since 1967, the B now ran express on the BMT Brighton Line to Brighton Beach (replacing the <Q>) in order to combine two weekday-only services, while the D replaced the B on the West End Line, running express on the BMT Fourth Avenue Line in Brooklyn. B service now operated between Brighton Beach and Bedford Park Boulevard during rush hours and Brighton Beach and 145th Street on weekday middays and evenings.[47][48][49][50]
2004 to present
From September 14, 2009, to October 3, 2011, B trains ran local in Brooklyn due to station renovations on the Brighton Line.[51][52][53]
In July 2019, the MTA introduced a proposal to end late evening service.[54] Instead, B service would end around 9:30 PM, which it previously did prior to July 2008.[55] In their proposal, the MTA noted that service often ended early on weeknights to accommodate planned work.[54]
From March 2020 to June 8, 2020, the B was temporarily suspended due to lack of ridership and train crew availability caused by the COVID-19 pandemic.[56][57][58][59] From December 30, 2021[60][61] to January 19, 2022, B service was again suspended due to a shortage of crew members exacerbated by the COVID-19 pandemic.[62]
Route
Service pattern
The following table shows the lines used by the B, with shaded boxes indicating the route at the specified times:[63]
Line | From | To | Tracks | Times | |
---|---|---|---|---|---|
weekdays | rush hours | ||||
IND Concourse Line | Bedford Park Boulevard | 155th Street | local | ||
145th Street | all | ||||
IND Eighth Avenue Line | 135th Street | 59th Street–Columbus Circle | local | ||
IND Sixth Avenue Line | Seventh Avenue/53rd Street | Broadway–Lafayette Street | express | ||
Chrystie Street Connection | Grand Street | all | |||
Manhattan Bridge | north | ||||
BMT Brighton Line | DeKalb Avenue | Brighton Beach | express |
Stations
For a more detailed station listing, see the articles on the lines listed above.[3]
Station service legend | |
---|---|
Stops all times | |
Stops all times except late nights | |
Stops weekdays during the day | |
Stops all times except rush hours in the peak direction | |
Stops rush hours only | |
Station closed | |
Stops weekdays in the peak direction only | |
Time period details | |
Station is compliant with the Americans with Disabilities Act | |
↑ | Station is compliant with the Americans with Disabilities Act in the indicated direction only |
↓ | |
Elevator access to mezzanine only |
Stations | Subway transfers | Connections/Other Notes | ||
---|---|---|---|---|
The Bronx | ||||
Concourse Line | ||||
Bedford Park Boulevard | D | |||
Kingsbridge Road | D | Some northbound a.m. rush hour trips terminate at this station | ||
Fordham Road | D | Bx12 Select Bus Service | ||
182nd–183rd Streets | D | Skipped by trains terminating at Kingsbridge Road | ||
Tremont Avenue | D | |||
174th–175th Streets | D | |||
170th Street | D | |||
167th Street | D | |||
161st Street–Yankee Stadium | D 4 (IRT Jerome Avenue Line) |
Bx6 Select Bus Service | ||
Manhattan | ||||
155th Street | D | |||
145th Street | D A C (IND Eighth Avenue Line) |
Northern terminal for all midday and evening trains | ||
Eighth Avenue Line | ||||
135th Street | C | |||
125th Street | A C D | M60 Select Bus Service to LaGuardia Airport | ||
116th Street | C | |||
Cathedral Parkway–110th Street | C | |||
103rd Street | C | |||
96th Street | C | |||
86th Street | C | M86 Select Bus Service | ||
81st Street–Museum of Natural History | C | M79 Select Bus Service | ||
72nd Street | C | |||
59th Street–Columbus Circle | A C D 1 (IRT Broadway–Seventh Avenue Line) |
|||
Sixth Avenue Line | ||||
Seventh Avenue | D E (IND Queens Boulevard Line) |
|||
47th–50th Streets–Rockefeller Center | D F <F> M | |||
42nd Street–Bryant Park | D F <F> M 7 <7> (IRT Flushing Line at Fifth Avenue) 1 2 3 (IRT Broadway–Seventh Avenue Line at Times Square–42nd Street, daytime only) N Q R W (BMT Broadway Line at Times Square–42nd Street, daytime only) S (42nd Street Shuttle at Times Square, daytime only) A C E (IND Eighth Avenue Line at 42nd Street–Port Authority Bus Terminal, daytime only) |
|||
34th Street–Herald Square | D F <F> M N Q R W (BMT Broadway Line) |
M34 / M34A Select Bus Service PATH at 33rd Street Amtrak, LIRR, NJ Transit at Pennsylvania Station | ||
West Fourth Street–Washington Square | D F <F> M A C E (IND Eighth Avenue Line) |
PATH at Ninth Street | ||
Broadway–Lafayette Street | D F <F> M 6 <6> (IRT Lexington Avenue Line at Bleecker Street) |
|||
Chrystie Street Branch | ||||
Grand Street | D | |||
Brooklyn | ||||
Brighton Line | ||||
DeKalb Avenue | N Q R W | |||
Atlantic Avenue–Barclays Center | Q D N Q R W (BMT Fourth Avenue Line) 2 3 4 5 (IRT Eastern Parkway Line) |
LIRR Atlantic Branch at Atlantic Terminal | ||
Seventh Avenue | Q | |||
Prospect Park | Q S (BMT Franklin Avenue Line) |
|||
Church Avenue | Q | |||
Newkirk Plaza | Q | |||
Kings Highway | Q | B82 Select Bus Service | ||
Sheepshead Bay | Q | |||
Brighton Beach | Q |
References
- ↑ 'Subdivision 'B' Car Assignment Effective December 19, 2021'. New York City Transit, Operations Planning. December 17, 2021.
- ↑ "Subdivision 'B' Car Assignments: Cars Required November 1, 2021" (PDF). The Bulletin. Electric Railroaders' Association. 64 (12): 3. December 2021. Retrieved December 3, 2021.
- 1 2 "B Subway Timetable, Effective December 4, 2022". Metropolitan Transportation Authority. Retrieved August 26, 2023.
- ↑ "Line Colors". mta.info. Metropolitan Transportation Authority. Archived from the original on October 16, 2016. Retrieved October 30, 2016.
- ↑ "The New Subway Routes". The New York Times. December 15, 1940. ISSN 0362-4331. Archived from the original on April 16, 2018. Retrieved June 20, 2016.
- ↑ "New Subway Routes Brochure". New York City Transit Authority. November 1967. Archived from the original on December 8, 2015. Retrieved January 24, 2016 – via The JoeKorner.
- ↑ "New York City Subway Map and Guide 1967". web.archive.org. New York City Transit Authority. 1967. Archived from the original on January 3, 2020. Retrieved March 29, 2019 – via subway.com.ru.
- ↑ Hofmann, Paul (July 1, 1968). "Skip-Stop Subway Begins Run Today – KK Line Links 3 Boroughs – Other Routes Changed". The New York Times. ISSN 0362-4331. Retrieved November 27, 2016.
- ↑ "Service Adjustment on BMT and IND Lines Effective 1 A.M. Monday, Aug. 30". October 23, 2016. Archived from the original on January 5, 2017. Retrieved October 23, 2016 – via Flickr.
- ↑ Raftery, Thomas (June 2, 1976). "Some Lines Derailed In Plan for Subway". New York Daily News. Retrieved March 29, 2019.
- ↑ Hirschfeld, Neal; Patterson, Michael (December 15, 1976). "TA Cuts Subway, Bus Service Jan. 1". New York Daily News. Retrieved March 29, 2019.
- ↑ "Angry Riders Blast TA Cuts". New York Daily News. January 6, 1977. Retrieved March 29, 2019.
- ↑ "Service Adjustments on the BMT and IND Lines Effective Midnight, Saturday, August 27 New York City Transit Authority (1977)". June 9, 2016. Archived from the original on September 15, 2016. Retrieved June 9, 2016 – via Flickr.
- ↑ "Still Take The A Train". New York Daily News. December 15, 1976. Retrieved March 29, 2019.
- ↑ McFadden, William (August 22, 1977). "Night Service Subway Cuts Start Sunday". New York Daily News. Retrieved March 29, 2019.
- ↑ Edmons, Richard (April 28, 1981). "TA approves four route changes. 2-year subway study affects only the IND/BMT division". New York Daily News. Retrieved March 29, 2019.
- ↑ Harney, James (June 2, 1983). "TA eyes big Sixth Ave. beef-up". New York Daily News. Retrieved March 29, 2019.
- 1 2 Washington Heights, Central Park West And Grand Concourse Riders Your Guide To Service Changes On The B D During Rehabilitation Work April 26 Through October 26, 1986. New York City Transit Authority. April 1986.
- ↑ "If You Ride These Subway Lines, You Know Something Drastic Has To Be Done". New York City Transit Authority. 1986. Archived from the original on May 10, 2017. Retrieved October 30, 2016 – via The JoeKorner.
- ↑ "Announcing Service Changes On The N and R Routes Beginning May 24, 1987 New Routes Mean Better Service". New York City Transit Authority. May 1987. Archived from the original on August 19, 2016. Retrieved April 23, 2018 – via subwaynut.com.
- ↑ Annual Report on 1989 Rapid Routes Schedules and Service Planning. New York City Transit Authority, Operations Planning Department. June 1, 1990. p. 17.
- ↑ "System-Wide Changes In Subway Service Effective Sunday, December 11, 1988". June 17, 2016. Archived from the original on September 15, 2016. Retrieved June 17, 2016 – via Flickr.
- ↑ Johnson, Kirk (December 9, 1988). "Big Changes For Subways Are to Begin". The New York Times. ISSN 0362-4331. Retrieved October 30, 2016.
- 1 2 Annual Report on 1989 Rapid Routes Schedules and Service Planning. New York City Transit Authority, Operations Planning Department. June 1, 1990. p. 36.
- ↑ "October 29, 1989 Subway Map". New York City Transit Authority. October 1989. Retrieved October 7, 2018 – via Flickr.
- ↑ "Announcing New Subway Service Between Queens And Manhattan. Starting Sunday, October 29, 1989". New York Daily News. October 24, 1989. Retrieved March 29, 2019.
- ↑ Introducing the new 63 Street Extension Opening 29, 1989. New York City Transit Authority. October 1989.
- ↑ Siegel, Joel (September 28, 1990). "We will be missing some trains, sez TA". New York Daily News. Retrieved March 29, 2019.
- ↑ "Service Changes September 30, 1990" (PDF). New York City Transit Authority. September 30, 1990. Archived (PDF) from the original on October 26, 2014. Retrieved May 1, 2016 – via subwaynut.com.
- ↑ "September 30, 1990 Subway Map". New York City Transit Authority. September 1990. Retrieved October 7, 2018 – via Flickr.
- ↑ Belluck, Pam (November 13, 1995). "For Riders, A Bright Spot Amid Tumult". The New York Times. ISSN 0362-4331. Retrieved March 29, 2019.
- ↑ Ronald Sullivan (March 26, 1995). "Bridge Repairs to Disrupt Off-Peak Subway Service". The New York Times. Archived from the original on August 19, 2016. Retrieved July 2, 2016.
- ↑ "63rd Street Shuttle Timetable Effective February 1998". Metropolitan Transportation Authority. February 1998. Archived from the original on March 5, 2016. Retrieved July 31, 2018 – via The JoeKorner.
- 1 2 "May 1999 Subway Map". Metropolitan Transportation Authority. May 1999. Retrieved March 29, 2019 – via Flickr.
- ↑ "B Line Av of Americas (6 Av) Express". mta.nyc.ny.us. Metropolitan Transportation Authority. February 1998. Archived from the original on May 4, 1999. Retrieved April 2, 2019.
- ↑ B Q All Times Service to Lexington Av/63 St, Roosevelt Island, 21 St/Queensbridge replaced by special shuttle February 22 to Fall '99. New York City Transit. February 1998.
- ↑ "March 1, 1998 B C Routes are switching places above 145 St". New York City Transit. March 1998. Archived from the original on January 5, 2017. Retrieved October 23, 2016 – via Flickr.
- ↑ "The B and C routes will switch places above 145th Street beginning March 1". New York Daily News. February 23, 1998. Retrieved March 29, 2019.
- ↑ "Changes in B & C service". New York Daily News. February 24, 1998. Retrieved March 29, 2019.
- ↑ "Weekly Subway Service Advisories Updated Nov 9, 2000". mta.nyc.ny.us. Metropolitan Transportation Authority. November 9, 2000. Archived from the original on November 9, 2000. Retrieved April 2, 2019.
- ↑ "Increased Subway Service" (PDF). The Bulletin. Electric Railroaders' Association. 43 (11): 1. November 2000.
- 1 2 "B Schedule Effective November 2000" (PDF). June 5, 2001. Archived from the original (PDF) on June 5, 2001. Retrieved May 12, 2023.
- ↑ Musluoglu, Subutay (February 2001). "63rd Street Connector". New York Division Bulletin. Electric Railroaders' Association.
- ↑ "Manhattan Bridge Service Changed B D Q <Q> W". Metropolitan Transportation Authority. July 2001. Retrieved March 29, 2019 – via The JoeKorner.
- ↑ "B D S Manhattan Bridge Service Change Train Timetable" (PDF). mta.info. New York City Transit. April 2003. Archived from the original (PDF) on June 29, 2003. Retrieved October 30, 2016.
- ↑ "Manhattan Bridge Service Changes". The New York Times. July 21, 2001. Archived from the original on July 3, 2018. Retrieved July 31, 2018.
- ↑ "A Subway Map Remade, in Hopes of Matching Routes and Riders". The New York Times. February 20, 2004. Archived from the original on July 15, 2014. Retrieved June 9, 2014.
- ↑ "B D M N Q R W Weekday Service Manhattan Bridge Map" (PDF). mta.info. Metropolitan Transportation Authority. February 2004. Archived from the original on February 5, 2004. Retrieved September 18, 2016.
{{cite web}}
: CS1 maint: bot: original URL status unknown (link) - ↑ "MTA NYC Transit Manhattan Bridge Information". mta.info. Metropolitan Transportation Authority. February 5, 2004. Archived from the original on February 5, 2004. Retrieved September 18, 2016.
{{cite web}}
: CS1 maint: bot: original URL status unknown (link) - ↑ "More Service on the Manhattan Bridge B D M N Q R W New Subway Service! February 22, 2004". The JoeKorNer. New York City Transit. 2003. Archived from the original on July 15, 2014. Retrieved August 5, 2010.
- ↑ "B Train Timetable" (PDF). mta.info. Metropolitan Transportation Authority. January 18, 2010. Archived from the original (PDF) on March 31, 2010. Retrieved October 30, 2016.
- ↑ "B Express Service Returns to the Brighton Line". mta.info. Metropolitan Transportation Authority. September 30, 2011. Retrieved March 31, 2019.
- ↑ "Brighton Line Station Rehabilitation" (PDF). The Bulletin. Electric Railroaders' Association. 52 (10): 18. October 2009.
- 1 2 "July 2019 NYC Transit/MTA Bus Committee Meeting" (PDF). mta.info. July 22, 2019. p. 207. Retrieved July 24, 2019.
- ↑ "MTA | Press Release | NYC Transit | Service Adjustments on BMW Lines". www.mta.info. July 24, 2008. Retrieved July 25, 2019.
- ↑ Guse, Clayton (March 24, 2020). "Coronavirus forces MTA to implement big cuts to NYC's mass transit". nydailynews.com. Retrieved June 9, 2020.
- ↑ Martinez, Jose (April 28, 2020). "Subway Service Slowly Gets Back On Track As Transit Workers Return". The City. Archived from the original on April 29, 2020. Retrieved April 29, 2020.
- ↑ Bascome, Erik (June 2, 2020). "Full service on MTA buses, subways set to return by June 8". silive. Retrieved June 8, 2020.
- ↑ Siff, Andrew (June 5, 2020). "MTA Resumes Regular Weekday Service; Overnight 4-Hour Closure Stays". NBC New York. Retrieved June 8, 2020.
- ↑ York, NBC New (December 28, 2021). "COVID Staffing Crush Forces NYC Subway Suspensions, NJ Transit Cancellations". NBC New York. Retrieved December 30, 2021.
- ↑ Garcia, Kristine; Cole, Kirstin (December 30, 2021). "MTA subway lines suspended due to COVID staff shortages". PIX11. Retrieved December 30, 2021.
- ↑ "4 Major Subway Lines to Resume Regular Service as Omicron Staffing Havoc Ebbs". NBC New York. January 18, 2022. Retrieved January 25, 2022.
- ↑ "Subway Service Guide" (PDF). Metropolitan Transportation Authority. September 2019. Retrieved September 22, 2019.