Yesvantpur–Barmer AC Express
Overview
Service typeExpress, AC Express
First service5 May 2014
Current operator(s)North Western Railways
Route
TerminiBarmer
Yesvantpur Junction
Stops37
Distance travelled2,251 km (1,399 mi)
Average journey time53 hours 30 mins as 14805 Yesvantpur–Barmer AC Express, 50 hours 15 mins as 14806 Barmer–Yesvantpur AC Express
Service frequency14805 Yesvantpur–Barmer AC Express – Monday, 14806 Barmer–Yesvantpur AC Express – Friday.
Train number(s)14805 / 14806
On-board services
Class(es)AC 1st class, AC 2 tier, AC 3 tier
Sleeping arrangementsYes
Catering facilitiesPantry car attached
Observation facilitiesPreviously ran as 19405 / 06 Ahmedabad Junction–Yesvantpur AC Express.
Technical
Rolling stockStandard Indian Railways LHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed140 km/h (87 mph) maximum
43.44 km/h (27 mph) including halts.
Route map
(Barmer–Yesvantpur) AC Express route map

The 14806 / 05 Barmer–Yesvantpur AC Express is an AC Express train belonging to Indian RailwaysNorth Western Railway zone that runs between Barmer & Yesvantpur Junction in India.

It operates as train number 14806 from Barmer to Yesvantpur Junction and as train number 14805 in the reverse direction, serving the states of Rajasthan, Gujarat, Maharashtra & Karnataka.

It initially ran to / from Ahmedabad Junction being subsequently extended to Barmer.

The train before had ICF rakes of Rajdhani Express that have converted into LHB rakes. The LHB rakes are more secure than ICF rakes in safety manners.

Coaches

The 14806 / 05 Barmer–Yesvantpur AC Express has 1 AC 1st Class, 3 AC 2 tier, 13 AC 3 tier & 2 End on Generator Coaches. In addition, it also carries a pantry car.

As is customary with most train services in India, coach composition may be amended at the discretion of Indian Railways depending on demand.

Service

The 14806 Barmer–Yesvantpur AC Express covers the distance of 2,251 km (1,399 mi) in 50 hours 15 mins averaging 44.80 km/h (28 mph) & in 53 hours 30 mins as 14805 Yesvantpur–Barmer AC Express averaging 42.07 km/h (26 mph).

As the average speed of the train is below 55 km/h (34 mph), as per Indian Railways rules, its fare does not include a Superfast surcharge.

Routeing

The 14806 / 05 Barmer–Yesvantpur AC Express runs from Barmer via Samdari Junction, Bhildi Junction, Palanpur Junction, Ahmedabad Junction, Vadodara Junction, Surat, Vasai Road, Kalyan Junction, Lonavala, Pune Junction, Solapur, Hubli Junction, Davanagere,Tumakuru, to Yesvantpur Junction.

It reverses direction of travel 5 times during its journey at Samdari Junction, Bhildi Junction, Palanpur Junction, Gadag Junction and Hubli Junction.

Traction

As the route is undergoing electrification, an Vadodara-based WAP-5 hauls the train from Barmer to Pune Junction following which a Hubballi-based WDP-4D powers the train for the remainder of the journey.

Before February 2014, when the Central Line section was under 1500 V DC traction, it was hauled by a Kalyan-based WCAM 2/2P dual-traction locomotive between Vadodara Junction and Pune Junction.

Operation

  • 14806 Barmer–Yesvantpur AC Express runs from Barmer every Friday reaching Yesvantpur Junction on the 3rd day.
  • 14805 Yesvantpur–Barmer AC Express runs from Yesvantpur Junction every Monday reaching Barmer on the 3rd day.

References

    • "Welcome to Indian Railway Passenger reservation Enquiry". indianrail.gov.in. Archived from the original on 8 April 2014. Retrieved 5 April 2014.
    • "IRCTC Online Passenger Reservation System". irctc.co.in. Retrieved 5 April 2014.
    • "[IRFCA] Welcome to IRFCA.org, the home of IRFCA on the internet". IRFCA. Retrieved 5 April 2014.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.