Barnala
Indian Railway
General information
LocationSadar Bazar, Barnala, Barnala district, Punjab
India
Coordinates30°22′16″N 75°33′00″E / 30.3711°N 75.5500°E / 30.3711; 75.5500
Elevation228.86 metres (750.9 ft)
Owned byIndian Railways
Operated byNorthern Railway
Line(s)Bathinda–Rajpura line
Platforms1
Tracks5 ft 6 in (1,676 mm) broad gauge
Construction
Structure typeStandard on ground
ParkingYes
AccessibleWheelchair ramp
Other information
StatusFunctioning
Station codeBNN
Division(s) Ambala
History
ElectrifiedYes
Location
Barnala railway station is located in Punjab
Barnala railway station
Barnala railway station
Location in Punjab

Barnala (station code: BNN) is a railway station located in Barnala district in the Indian state of Punjab and serves Barnala city which is the administrative headquarter of the district. Barnala station falls under Ambala railway division of Northern Railway zone of Indian Railways.[1]

Overview

Barnala railway station is located at an elevation of 229 metres (751 ft). This station is located on the single track, 5 ft 6 in (1,676 mm) broad gauge, Dhuri–Bathinda section of Bathinda–Rajpura line.[2][3][4]

Electrification

Barnala railway station is situated on single track electrified line. There are two electrified tracks at the station.[5] The 68 km-long stretch from Dhuri station to Lehra Muhabbat station on Bathinda–Rajpura line was completed in July 2020, thereby providing complete electrification on Bathinda–Rajpura line.[6]

Amenities

Barnala railway station has 5 booking windows and all basic amenities like drinking water, public toilets, sheltered area with adequate seating. There is one platforms at the station. and one foot overbridge (FOB).[5]

References

  1. "Barnala railway station". indiarailinfo.com. Retrieved 8 September 2020.
  2. "How to reach Barnala". Barnala district official website. Retrieved 8 September 2020.
  3. "Barnala Train Station". Total Train Info. Retrieved 8 September 2020.
  4. "Barnala Trains Schedule and station information". goibibo. Retrieved 8 September 2020.
  5. 1 2 "Passenger amenities details of Barnala railway station as on 31/03/2018". Rail Drishti. Retrieved 7 September 2020.
  6. "Northern Railway completes electrification work on 130 km line in Punjab, Haryana". The New Indian Express. 16 July 2020. Retrieved 8 September 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.