The Barnard River Scheme is an inter-basin water transfer system in New South Wales, which can transfer water from the Barnard River in the upper Manning River catchment over the Mount Royal Range into the Hunter River.[1]
The scheme was constructed between 1983 and 1985, to provide drought relief water for Bayswater Power Station which was being constructed at the same time.
The scheme consists of:
- a weir on the Barnard River, which transfers water into a small dam on Orham Creek via a gravity channel
- a pair of pumping stations which pump the water through pipelines to Bralga Tops
- another pipeline feeding downhill into Oaky Creek, which is a tributary of the Hunter River.
References
- ↑ Anne Keen (1 October 2019). "Barnard River on water storage plan". Gloucester Advocate. Retrieved 21 November 2021.
External links
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.