Beitun Main Station 103a 北屯總站 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Beitun, Taichung Taiwan | ||||||||||
Coordinates | 24°11′7″N 120°42′34″E / 24.18528°N 120.70944°E | ||||||||||
Operated by | |||||||||||
Line(s) | |||||||||||
Platforms | 2 side platforms | ||||||||||
Construction | |||||||||||
Structure type | At grade | ||||||||||
Other information | |||||||||||
Station code | 103a | ||||||||||
History | |||||||||||
Opened | 25 April 2021[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Beitun Main Station Location within Taiwan |
Beitun Main Station | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese | 北屯總站 | ||||||||||
|
Beitun Main Station is a metro station operated by Taichung Metro located in Beitun District, Taichung, Taiwan. It is the eastern terminus of the Green Line, and is located near the depot of the entire line.[2]
Around the station
Beitun Main station is located within a new development zone. With the construction of the new station, the surrounding area saw rapid development, including a planned Costco store.[3]
Station structure
2F | Crossover Level | Platforms-connecting Overpass |
G | ||
Track 1 | Green Line termination platform | |
Track 2 | Green Line: towards Taichung HSR Station (Jiushe) | |
Side platform, doors will open on the right | ||
Concourse | Exit/Entrance, Lobby, information desk, automatic ticket dispensing machines, one-way faregates |
References
- ↑ 郝雪卿、蘇木春 (2020-11-15). "台中捷運綠線試營運16日起1個月免費搭 市民興奮終於等到了[影]". 中央通訊社.
- ↑ "臺中捷運未來營運計畫" (PDF). Transportation Bureau of Taichung City (in Chinese (Taiwan)). Taichung Metro. May 8, 2017. Retrieved October 15, 2019.
- ↑ 詹千雁 (September 20, 2019). "台中好市多二店蓋這!捷運環繞高CP 勝麗方程市首購首選" (in Chinese (Taiwan)). SET News. Retrieved October 15, 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.