Blue Line
Overview
StatusApproved
LocaleKanpur, Uttar Pradesh, India
Termini
  • Agriculture University
  • Barra-8
Stations8
Service
TypeRapid transit
SystemKanpur Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
Technical
Line length
  • 8.6 km (5.3 mi)
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 34 km/h (21 mph) (average)
Route map

Agriculture University
Rawatpur Rawatpur railway station
Kakadeo
Double Pulia
Vijay Nagar Chauraha
Shastri Chowk
Barra-7
Barra-8

The Blue Line (Line 2) (Hindi: ब्लू लाइन) of the Kanpur Metro is an approved metro route of mass rapid transit system in Kanpur. It consists of 8 stations from Agriculture University to Barra-8 with a total distance of 8.6 km. Its construction is expected to begin by end of December 2023.[1][2][3]

List of stations

Blue Line
# Station Name Connections Layout
EnglishHindi
1Agriculture Universityकृषि विश्वविद्यालयNoneUnderground
2RawatpurरावतपुरRawatpur railway station Orange LineUnderground
3KakadeoकाकादेवNoneUnderground
4Double Puliaडबल पुलियाNoneUnderground
5Vijay Nagar Chaurahaविजय नगर चौराहाNoneElevated
6Shastri Chowkशास्त्री चौकNoneElevated
7Barra-7बर्रा-7NoneElevated
8Barra-8बर्रा-8NoneElevated

See also

References

  1. "Work on Kanpur Metro second corridor to begin by end of December". The Times of India. September 2022. Retrieved 15 September 2023.
  2. "9 Bidders for Kanpur Metro Line-2's KNPCC-11 Underground Work". Retrieved 15 September 2023.
  3. "Kanpur Metro – Information, Route Maps, Fares, Tenders & Updates". Retrieved 15 September 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.