Cenisio
General information
Coordinates45°17′29″N 9°06′08″E / 45.291409°N 9.102231°E / 45.291409; 9.102231
Owned byAzienda Trasporti Milanesi
Platforms1
Tracks2
Construction
Structure typeUnderground
AccessibleYes
Other information
Fare zoneSTIBM: Mi1[1]
History
Opened20 June 2015 (2015-06-20)
Services
Preceding station Milan Metro Following station
Monumentale
towards Bignami
Line 5 Gerusalemme

Cenisio is a station on Line 5 of the Milan Metro.

History

The works for the construction of the station began in July 2011,[2] as part of the second section of the line, from Garibaldi FS to San Siro Stadio. It was opened to the public on 20 June 2015, nearly two months after the opening of this section of the line, and five months earlier than scheduled.[3]

Station structure

Cenisio is an underground station with two tracks served by one island platform and, like all the other stations on Line 5, is wheelchair accessible.

Interchanges

Near this station are located:

References

  1. "Rete metropolitana di Milano". Azienda Trasporti Milanesi. Archived from the original on 9 July 2021. Retrieved 13 January 2022.
  2. Sito Comune di Milano
  3. MilanoToday


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.