Chengdu–Yibin
high-speed railway
成宜高速铁路
Overview
StatusUnder construction
Termini
Stations12
Service
Operator(s)China Railway Chengdu Group
Technical
Line length261 km (162 mi)
(full line)
176 km (109 mi) (Chengdu to Zigong section)[1]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph) (Chengdu–Tianfu)
350 km/h (217 mph) (Tianfu–Yibin)
Route map

Chengdu East
Tianfu
Sanchahu
Tianfu Airport
(Right arrow Chengdu–Chongqing ICR to Ziyang North)
Ziyang West
Zizhong West
Weiyuan
Zigong
Yantan
Nanxi North
Yibin East
Yibin
|bottom= }}

The Chengdu–Yibin high-speed railway, or Chengdu–Zigong–Yibin high-speed railway is a high-speed railway currently under construction in China.[2] It runs between Chengdu and Yibin via Chengdu Tianfu International Airport.

History

The section from Chengdu to Tianfu Airport was approved in October 2017.[3] The whole line was approved on 14 January 2019.

Stations

Station Name[2] Chinese Metro
transfers/connections
Chengdu East 成都东 Chengdu Metro 2 7
Tianfu 天府 Chengdu Metro 18 19 (U/C)
Sanchahu 三岔湖
Tianfu Airport 天府机场 Chengdu Metro 18
Ziyang West 资阳西
Zizhong West 资中西
Weiyuan 威远
Zigong 自贡
Yantan 沿滩
Nanxi North 南溪北
Yibin East 宜宾东
Yibin 宜宾

References

  1. "成都至自贡高速铁路可研报告获批 - 重大项目动态 - 自贡市政府网站集约化平台". www.zg.gov.cn. Archived from the original on 2021-02-20. Retrieved 2020-10-29.
  2. 1 2 "川青铁路、蓉昆高铁来了!".
  3. 四川网络广播电视台 - 四川广播电视台. "成都至自贡天府机场段铁路获批 设计时速350km/h". www.sctv.com. Retrieved 2020-10-29.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.