General information | |||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Other names | Chongqingbei Railway Station (former name) South Square of Chongqingbei Railway Station (old translation) | ||||||||||||||||||||||||
Location | Chongqing North railway station, Yubei District, Chongqing China | ||||||||||||||||||||||||
Operated by | Chongqing Rail Transit Co., Ltd. | ||||||||||||||||||||||||
Line(s) | Line 3 Line 10 Loop line | ||||||||||||||||||||||||
Platforms | 6 platforms (2 side platforms and 2 island platforms) | ||||||||||||||||||||||||
Connections | |||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||
Structure type | Below ground | ||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||
Station code | 环/15, 3/27, 10/12 | ||||||||||||||||||||||||
History | |||||||||||||||||||||||||
Opened | 29 September 2011 (Line 3) 28 December 2018 (Line 10 and Loop line) | ||||||||||||||||||||||||
Previous names | Chongqingbei Railway Station | ||||||||||||||||||||||||
Services | |||||||||||||||||||||||||
|
Chongqing North Station South Square[1] (simplified Chinese: 重庆北站南广场; traditional Chinese: 重慶北站南廣場; pinyin: Chóngqìng Běizhàn Nánguǎngchǎng), previously known simply as Chongqingbei Railway Station, is an interchange station on Line 3 (straddle beam monorail), Line 10 (heavy rail subway) and the Loop line (heavy rail subway) of Chongqing Rail Transit.
Located in Chongqing's Yubei District, it serves the nearby Chongqing North railway station.
History
It opened with the first phase of Line 3 on September 29, 2011 as Chongqingbei Railway Station (simplified Chinese: 重庆北站; traditional Chinese: 重慶北站; pinyin: Chóngqìng Běizhàn).[2] On March 23, 2016, in anticipation of the opening of another metro station just north of the same railway station, its name was changed to reflect its location serving the south square of the railway station.[3]
On December 28, 2017, Line 10 opened for passenger operations,[4] however the Line 10 section of this station opened on December 28, 2018, exactly one year later than the other stations in the Phase 1 of Line 10.
The Loop line section of the station also opened on December 28, 2018.
Together the three lines (Line 3, Line 10 and the Loop Line) share the same concourse for entrance/exit and transfer while the Loop Line has one other concourse that solely serves Loop Line passengers.
Station structure
Loop line platform
An island platform is used for Loop Line trains travelling in both directions.
To Loop Min'an Ave. | ← | 环/15
|
← | Counterclockwise Loop | |
---|---|---|---|---|---|
Island Platform
Doors open on the left |
|||||
Clockwise Loop | → | 环/15
|
→ | To Loop Yulu |
Line 3 platforms
- Platform Layout
There are two side platforms for Line 3 trains.
Side Platform Doors open on the right | ||||
To 3 Terminal 2 of Jiangbei Airport | ← | 3/27
|
← | |
---|---|---|---|---|
→ | 3/27
|
→ | To 3 Yudong | |
Side Platform Doors open on the right |
Line 10 platform
- Platform Layout
An island platform is used for Line 10 trains travelling in both directions.
To 10 Houbao | ← | 10/12
|
← | ||
---|---|---|---|---|---|
Island Platform
Doors open on the left |
|||||
→ | 10/12
|
→ | To 10 Wangjiazhuang |
References
- 1 2 "重庆轨道交通运营线网图". cqmetro.cn. Archived from the original on 2022-04-17.
- ↑ 重庆轻轨三号线. Tencent (in Chinese). Retrieved 2018-01-05.
- ↑ 站名不再绕 3号线重庆北站将更名重庆北站南广场. Xinhuanet (in Chinese). 2016-03-23. Archived from the original on March 23, 2016. Retrieved 2018-01-05.
- ↑ 轨道交通5号线一期北段、10号线一期12月28日开通试运营. Chongqing Metro (in Chinese). 2017-12-28. Retrieved 2018-01-05.