6°16′03″S 107°09′54″E / 6.267390°S 107.164976°E / -6.267390; 107.164976

Cikarang Dry Port
Aerial view of Cikarang Dry Port
Location
Country Indonesia
LocationCikarang, West Java
Details
Opened2010
Operated byPT Cikarang Inland Port
Owned byJababeka Group
Type of harbourdry port
Statistics
Website
cikarangdryport.com

In Cikarang, West Java, Indonesia, there is a dry port called Cikarang Dry Port (CDP), which is a part of Kota Jababeka. With a total area of 200 hectares, CDP was founded in 2010. It is run as Indonesia's first and only Integrated Customs Services Zone by PT Cikarang Inland Port, a division of the publicly traded PT Jababeka Tbk. As an inland dry port model, CDP acts as a port extension that addresses ongoing traffic jams and delays at Tanjung Priok, a significant import/export gateway. Reducing the dwelling time from 3.2 days to the government-mandated 2.5 days is the primary goal.

To optimize its operations, the government involves CDP in order to expedite the 2.5-day dwelling time. Its design incorporates seamlessly with Tanjung Priok. The idea is that CDP handles the next step, port clearance, after Tanjung Priok has finished all loading and unloading operations. A freight train will transport containers from the seaport to CDP for administration, quarantine, and inspection in order to expedite the process.A similar procedure can also be used for export. Up to 8 million TEUs more can be handled annually at the port thanks to Tanjung Priok and CDP's integration. Productivity is a critical factor in the development of an industrial business and is facilitated by the coordination and synchronization of the entire supply chain through CDP. The CDP has a capacity of two hundred and fifty thousand TEUs.

Logo of Cikarang Dry Port

Traffic solutions

The government is aware that reducing traffic between ports and industrial estates is another additional value that CDP can provide. In theory, integrating CDP with Tanjung Priok could result in a 30% decrease in traffic congestion. The fuel consumption efficiency that results from this contribution is estimated to be worth 190 billion rupiahs annually.

Access

The government provides access to toll roads and the railway system to support the CDP. Furthermore, new CDP access is presently in development. Inland waterways are to be constructed by the Indonesia Port Corporation region II (Pelindo II) and the National Development Planning Agency (Bappenas). The goal of the project is to widen Cikarang Bekasi Laut (CBL), an existing river, in order to maximize its potential. The route will be used as a new means of transportation and extends from Tanjung Priok Port to CDP. It will be more economical, energy-efficient, and time-efficient. There is no need for trucking operations, and traffic congestion can be minimized, particularly on the Jakarta - Cikampek and Inner Jakarta toll roads. By using the river, the government avoids building a new toll road as well. The primary objective of the Cikarang Bekasi Laut (CBL) inland waterway development is to maximize the river channel's potential as a substitute transportation route that connects rural areas and the offshore Tanjung Priok area.

Cikarang Dry Port Railway

Product and services

  • Container Yard (CY): With an annual capacity of 400,000 TEUs, the container yard has the potential to grow to 2.5 million TEUs.
  • Reefer Plugs: 128 reefer plugs with a backup generator and uninterruptible power supply are available.
  • Container Freight Station (CFS) for Import – 3,888 sqm of consolidation warehouse is available for Less than Container Load Cargo handling.
  • Bonded Logistics Center – 11,960 sqm of cotton warehouse is available. Second warehouse is targeted to be 82,293 sqm large.
  • Empty Container Depot – Empty container depot is available for picking up empty containers for export stuffing or storing empty containers after import.
  • Integrated Customs – To support CDP as Integrated Customs Service Zone (KPPT – Kawasan Pelayanan Pabean Terpadu), Cikarang Customs Office is available in CDP area providing needed customs services and monitoring cargo movement at the gate 24/7 and 365 days.
  • Integrated Quarantine – Animal, plant, and fish quarantine services are available and integrated within CDP's area.
  • Physical Inspection – The facility is prepared for Red Line cargo inspection under customs supervision, and also quarantine inspection if required. Located inside the terminal brings cost and time efficiency. Joint inspection could be arranged for cargos those need both customs and quarantine inspections to save even more time and cost.
  • Mobile X-Ray (Hi-Co Scan) – TMobile X-Ray for container scanning is available for physical inspection.
  • Electronic Seal – Bonded transfer between sea port and dry port is equipped with Electronic Seal for security, monitoring and tracking.
  • Railway Connection – Railway connection is available connecting CDP to the sea port up to Surabaya in East Java. Connection to other major cities of Java connection would be developed later.
  • Trucks – Trucks are available for bonded transfer and feeder services to factories and warehouses.
  • Container Tracking – Online container tracking is available.
  • Indonesia National Single Windows (INSW) – Cikarang Dry Port is one of several ports connected to INSW.

Stakeholders

As CDP offers services in cargo handling and logistics, it deals much with the customs. But not merely with the customs, the logistics service handled involves many stakeholders from both the government and the private sector. These stakeholders include exporters, importers, vessels providers, terminal operators, container freight stations, bonded warehouses, trucking and forwarding agents, third party logistics (3PL), empty container depots as well as banking and other supporting facilities.[1]

International port code

CDP is legally permitted to deliver exported goods as well as receipt of imported goods to and from all over the world. This possibility is due to CDP having been registered in an international port network and already has a special and unique code which is IDJBK. This allows CDP to become an official Port of Origin and Port of Destination.[2]

References

  1. Putra, Irfan Eka. "Cikarang Dry Port - Jababeka". jababeka (in English, Indonesian, and Chinese). Retrieved 25 June 2017.
  2. Mark Millar (2014-07-03). "Innovative Port Solutions for Ocean Freight Supply Chains - eft - Supply Chain & Logistics Business Intelligence". eft. Retrieved 25 June 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.