Headquarter of The Emschergenossenschaft in Essen (Germany), constructed 1910 by Prof. Wilhelm Kreis
Emschergenossenschaft
AbbreviationEG
Formation1899 in Bochum
TypeStatutory authority in public-private partnership
Legal statusNonprofit organization
PurposeRiver basin management in the Emscher catchment
HeadquartersGermany, 45128 Essen, Kronprinzenstraße 24
Chief Executive Officer
Dr. Uli Paetzel
Chief Operating Officer
Dr. Emanuel Grün
AffiliationsJoint administration with Lippeverband
Websitehttps://www.eglv.de

The Emschergenossenschaft is the oldest and biggest public German water board, („Wasserwirtschaftsverband”) located in Essen (North Rhine-Westphalia/Germany) and responsible for the 865 km2 Emscher catchment with 2.2 million citizens. The main tasks are wastewater discharge and treatment, flood protection, groundwater management, settlement of claims caused by hard coal mining, river restoration and protection of ecosystems.

History

Origins and early development

Bond of the Emschergenossenschaft, issued May 1927

In the North of Germany the merging of adjoining land owners along rivers and creeks in cooperatives had a long tradition from the 13th century on. In the German Rhine catchment, downstream of Cologne, the industrialization in the 19th century was leading to a renaissance of the alliance ideas. Until the middle of the 19th century the river Emscher (running from the spring close to Dortmund in western direction to the Rhine) was a small meandering lowland river of 109 km and the villages along the river had only a few thousand citizens. The improvement of steam engines and the construction of the Cologne-Minden trunk line in the 1840s enabled the economic development and the excavation of vertical mine shafts in the northern Ruhr from the 1850s on. This resulted in severe environment and health problems due to mining subsidence: The hard coal excavation hundreds of meters underground caused sinking at the surface. In some areas the mining lead, over a period of 100 years, to 30 m of mining-induced subsidence. The Emscher catchment area suffered from “subsidence funnels” where waste water, surface run-off and water from the creeks gathered and stagnated. From the river Ruhr (running in parallel in the south of the Emscher) water was supplied by pumping stations to the northern cities from the 1870s on but the water carried germs and contaminations, too. Along the Emscher and its tributaries putrid smell, polluted water and flooding were not only restraining economic developments but also causing diseases and epidemics like typhus and malaria. From 1885 on legislative initiatives started to develop catchment-wide solutions and finally in 1899 the mining companies, industrial players and the Lord Mayors of the growing cities established the Emschergenossenschaft to organize the regional water drainage. In the same year the water supply was improved by the foundation of the Ruhrtalsperrenverein that was responsible for the construction and operation of drinking water basins to support industry and citizens.

The municipalities were responsible for the inner city drainage systems and interconnection points were jointly defined where the Emschergenossenschaft took over responsibility. Those were normally the sub catchment parts where underground sewer systems were impossible as the mining subsidence would have caused damage continuously and waste water would have infiltrated in groundwater and soil.

In the following years – based on the Emschergenossenschaft act from 1904, a special water board act – the technical initial equipment and extension of the river and tributaries took place in the 865 km2 catchment area, cutting the meanders (the Emscher was shortened from 109 km to today 81 km), deepening the runways and lining them with concrete, constructing dikes and pumping stations, relocating the Emscher mouth to guarantee downward slope and establishing waste water treatment plants. All discharge from industry, mines and households as well as rain, surface water and natural discharge were collected and drained in these new “concrete streams”. All costs were divided between the “users” of the Emscher system, depending on the volume and load of waste water or drainage capacity or causer (for example the mining companies).

Between 1906 and 1914 the catchment area changed completely as in parallel to the technical transformation of the river system with 7.000 hectares drained land the shipping waterway Rhine-Herne Canal was constructed over a stretch of 46 km to connect the coal and steel district via the Rhine to the North Sea. This waterway was located partly in the former Emscher course and is often only separated by a dyke from the Emscher.

Progressing coal mining aggravated environmental problems and permanent pumping and re-construction was needed since starting the initial equipment. In the 1920s the Emschergenossenschaft operated 30 waste water treatment plants but changed the system to more centralized solutions in the following years, starting 1927 with a facility in Bottrop and (after the second relocation of the Emscher mouth 1949) the development of the central treatment plant Emscher mouth in the 1970s.

Later development

The coal crisis that emerged in the 1960s resulted in the shutdown of most mines by the 1980s and as a consequence the mining subsidence decreased and nearly stopped in the 1990s. Within the frame of the Internationale Bauausstellung Emscher Park from 1989 to 1999 (established as a political program for structural changes from the North Rhine-Westphalian government) the Emscher restoration was announced as a so-called lighthouse project.

The Emschergenossenschaft with its administrative, political and industrial members decided to re-develop the whole Emscher system towards „second hand nature“ – as real restoration, to as it was before industrialization is impossible. The stretch was fixed for the time frame 1990 to 2020 with an investment budget of 4.5 billion €. The first step was the construction or upgrading of 4 centralized waste water treatment plants in Dortmund, Bottrop, Duisburg and at the Emscher mouth.

The second step is the construction of a 400 km waste water sewer system in parallel to the “concrete streams” and the river Emscher itself; tubes had been impossible due to mining subsidence before. Step by step compartments of the sewer system are connected to the waste water treatment plants.

After connecting the tubes the remaining “concrete streams” are re-developed as a third step. The development has created a regional system of 350 km open waste water courses within corridors, fenced and secured to prevent accidents and damage. These isolated lines are a benefit as they enable the Emschergenossenschaft to re-develop green belts with restored water courses in these corridors. In other metropolitan areas normally water courses had disappeared in the underground sewer system which was impossible in the Emscher catchment area. The planning process was based on catchment wide masterplan strategies and public involvement, especially for huge construction sites. The Emschergenossenschaft cooperated in many EU funded transnational projects for example on regional metropolitan park demands, with Dutch institutions on flood prevention and public participation processes,[1] on climate change mitigation and adaptation [2] and with further networks on pharmaceutical residues in surface waters.[3]

The Emscher restoration programme is planned to be ready with a first basic ecological equipment until 2020.

Responsibilities

Responsibilities and tasks of the Emschergenossenschaft are defined in the act „Emschergenossenschaftsgesetz“ (Emscher GG [4]), enacted July 14, 1904 and adapted until 2013:

  • Management of runoff, flood prevention at open water courses and in the sub catchments;
  • Maintenance of open water courses and related facilities;
  • Ecological restoration of technically altered water courses;
  • Groundwater management;
  • Compensation of mining impacts on ecological or water management related changes;
  • Waste water disposal;
  • Waste disposal of waste from water management services;
  • Water quality management;
  • Scientific work related to water management challenges;
  • Support of drinking water supply, water for industrial use and use of hydropower

The Emschergenossenschaft is working in an administrative collectivity with the Lippeverband, a water board established in 1926 in a neighboring river catchment area. Together, more than 1.500 employees work for both water boards,[5] around 900 of them belong to the Emschergenossenschaft. Both public water boards together are the biggest water management and service provider in Germany.

Governance

The North Rhine-Westphalian water boards are statutory bodies, working in public-private partnership as non-profit institutions.[6]

The Emschergenossenschaft has an administration that is governed by a board of 3 managing directors, elected for 5 years each. The election happens on the level of associates that have representatives in an annual assembly, coming from

  • 19 municipalities,
  • 170 commercial and infrastructure companies and
  • 9 mining companies.

The number of representatives per member depends on the number of citizens in the 19 municipalities and on the volume of waste water “produced” by the companies and mines.

The supervisory authority is the Ministry for Climate Protection, Environment, Agriculture, Conservation and Consumer Protection of the State of North Rhine-Westphalia (MKULNV). German water boards are not formal authorities but have to receive permissions and approvals for construction works etc. They are independent in financial and internal management but depend on regulatory decrees regarding water acts.

Catchment area

The Emschergenossenschaft is working in the 865 km2 catchment area of the Emscher with the municipalities (from east to west)

The catchment is historically divided since cutting the Emscher main stream from its original estuary twice, first in 1906 from the original mouth in Duisburg and 1949 again by shifting the mouth to Dinslaken. The former parts of the catchment area in Duisburg and Oberhausen are drained artificially and the waste water is – after treatment – pumped into the river Rhine. These sub catchments are called “Alte Emscher” and “Kleine Emscher”. The third shift of the Emscher mouth (under construction 2014–2018) has been leading to the municipality of Voerde as a new member in the Emschergenossenschaft.

Data

  • Members of the Emschergenossenschaft: 201
  • Catchment area: 865 km2
  • Population: approx. 2.2 Mio.
  • Water courses: 341 km
  • Waste water sewers: 328 km (currently more under construction, in 2018 approx. 400 km)
  • Dykes: 117 km
  • Waste water treatment plants: 5 (in total 4.8 Mio. people equivalents)
  • Pumping stations: 132
  • Part of catchment area drained by pumps (polder areas): 37.8%
  • Flood plains: 23 [7]

References

  1. Sustainable Development of Floodplains
  2. "Urban networks to face climate change". Archived from the original on 2018-04-14. Retrieved 2015-09-09.
  3. "EU cooperation on pharmaceuticals in the aquatic environment". Archived from the original on 2015-09-25. Retrieved 2019-08-08.
  4. Act Emschergenossenschaftsgesetz
  5. "Portray and website". Archived from the original on 2015-07-31. Retrieved 2015-09-09.
  6. "Environment Ministry North Rhine–Westphalia". Archived from the original on 2015-09-13. Retrieved 2015-09-09.
  7. Emschergenossenschaft “Geschäftsbericht”, Essen, November 2016
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.