Freiburg im Breisgau tramway network
A Landwasser bound tram in Freiburg
Operation
LocaleFreiburg im Breisgau, Baden-Württemberg, Germany
Open14 October 1901 (1901-10-14)
StatusOperational
Lines5
Operator(s)Freiburger Verkehrs AG
Infrastructure
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Propulsion system(s)Electricity
Electrification750 V DC
Depot(s)1 (Betriebshof West)
Stock73 trams
Statistics
Route length32.3 km (20.1 mi)
Stops73
Overview
The network since 2019

The Freiburg im Breisgau tramway network (also known as Stadtbahn or formerly as Hoobl (Alemannic for Hobel))[1] is a network of tramways that forms part of the public transport system in Freiburg im Breisgau, a city in the federal state of Baden-Württemberg, Germany. Established in 1901, the network has been operated since its foundation by the company now known as Freiburger Verkehrs (VAG Freiburg or VAG), and powered by electricity. The tramway network currently has five lines. The expansion of the tram network since 1980 has served as an example of the "renaissance of the trams" in Germany. As of 2023, 73 trams were available for regular use: 2 of these were high-floored, 36 partial and 35 low-floored.[2][3] Almost the entirety of the network is located within Freiburg's urban area; only a few metres of the balloon loop at Gundelfinger Straße are located outside the boundary of Gundelfingen to the north of Freiburg. In total, the trams serve 20 out of the 28 districts in Freiburg.

History

Time before trams

After Freiburg was connected to the railway network via the Rhine Valley railway from 1845, there was an intercity transport link between the Hauptbahnhof and the Wiehre Train Station, which used the Hell Valley Railway for the first time in 1887. From 1891, horse-drawn buses, operated by two different private companies, transported citizens throughout the town. The horse-drawn buses were used on three lines: Lorettostraße to Rennweg, Waldsee to Hauptbahnhof, and Siegesdenkmal to Horben. They were eventually replaced by trams, except between Günterstal and Bohrer.[4]

Electricity power plant on Eschholzstraße

In May 1899, the city council made the decision to build an electric transport system in Stühlinger. Reasons for it included the University of Freiburg's increasing requirement for light and power, and the planned refurbishment of the town's trams. An 1899 survey by the city council resulted in a power requirement for more than 20,000 incandescent lamps.

The acting mayor at the time, Otto Winterer, decisively ensured the fast implementation of the trams. The concession for powering the tram was safeguarded by Direktion des Elektrizitätswerkes und der Straßenbahn, the name of the former VAG company. The tasks of building electric centre for producing light and power and the tramway were assigned to Siemens & Halske from Berlin. Because the supply of hydropower in the environment was too low, the decision was made to generate electricity via a steam power plant.

The tram's planners considered Freiburg Bächle in the Old City to be problematic, since it was feared that the trams could fall into the Bächle in the event of a derailment. It also had to be ensured that the entrances on the Bächle side remained closed. In the end, a senior engineer from the Hamburg trams project, "could not recommend the building of platforms next to the Bächle under any circumstances" and recommended that the Bächle be covered, which was ignored in order to preserve the Bächle as a landmark of Freiburg.[5]

Not included in the construction contract were the conversion and restoration of the streets after laying the tracks and erecting the depot at Urachstraße; this work was undertaken by the city and municipal building authorities. At the same time as the tram network, Freiburg had access to electric road lighting that was powered by the same electricity plant, which still exists today, and is located on Eschholzstraße, away from the tram network.[1] From there, a subterranean supply led to the corner of Betheroldstraße and Wilhelmstraße and another to the square in front of the Johanneskirche.

Initial operation

On 30 August 1901, the first test run took place,[6] with the first public-serving trams operating in the autumn. From 14 October 1901 onwards, lines A and D went into operation before lines B and C, which opened on 2 December 1901. The original length was nine kilometres and had 34 stops. The latter two routes were only able to operate once the Schwabentor had been converted. For the two-tracked tramway, it was extended, like the Martinstor, with a second passageway.[7] At first, however, the lines were only used for internal purposes and were not prescribed to trams. Freiburg was the fourth tram network installed within the Grand Duchy of Baden. In contrast to the older networks in Heidelberg, Karlsruhe, and Mannheim, which were all supplied with electricity three months before the plant opened in Freiburg, trams in the Breisgau were powered by electricity from the outset and used lyric current collectors.

The power plant opened on 1 October 1901 and regularly produced direct current. In the first year, 61 percent of the 177,000 Kilowatt hours were used by the tram network until 1933, when it received its own supply. In the beginning, the network ran as follows:

Line Route Cycle Journey time Turnaround time Courses Stops
A Rennweg-Lorettostraße Every 10 minutes

(7 am and 9 am) Every 5 minutes

14 minutes 40 minutes

(7 am and 9 am) Every 35 minutes

4 / 7 16
B Hauptbahnhof-Lorettostraße every 10 minutes 13 minutes 40 minutes 4 11
C Hauptbahnhof-Bleicheweg every 10 minutes 12 minutes 30 minutes 3 10
D Rennweg-Günterstal Every 15 minutes 23 minutes 60 minutes 4 21

Lines A and D ran along Habsburger Straße, Kaiser-Joseph-Straße, and Günterstalstraße, while the section Line D alone served encompassed the entire length of Schauninslandstraße. Lines B and C both followed Bismarckallee, Bertoldstraße, Salzstraße, Straße Oberlinden and the Schwabentorring until its southern end. From there, only Line B served Hildastraße and Urachstraße, while Line C followed Schwarzwaldstraße to the east. For train crossings, seven were accessible on the single-track east–west route.

Advice of not installing tracks next to the Bächle was ignored.

During the morning peak, up to 18 trams were used simultaneously, while nine others were in reserve. In the inner city, a denser supply resulted from the superposition of Lines A and D. There was on the single double-track railway of the network between Rennweg, now Hauptstraße, and Lorettostraße up to 16 trips per hour. On the interchange Lorettostraße-Günterstal, which was originally cross-bordered, the only intermediate passing loop was at Wonnhalde. The line to Güterstal, as a single line at the time, was operated by a trailer car, which was why there was a transfer line at the two terminals of Rennweg and Günterstal. There were four open summer carriages available for the strong holiday traffic during this season. The section serving Hauptbahnhof and Schwabentorbrücke was served by twelve cars an hour. However, due to the single-track infrastructure, the trams on lines B and C always ran very close behind each other.

An operational feature from the earlier years was the level junction at Günterstalstraße (a few metres south of Lorettostraße and Urachstraße) for the interurban route to Günterstal with Höllentalbahn, which had not yet been powered.

Since 1902, the tram transported more than three million passengers, while the horse-drawn bus lines in their last full year of operation in 1900 only transported 50,000 passengers. In the same years, Lines B and C were extended from their former endpoint at the Hauptbahnhof by approximately 200 metres to the northwest at Lehener Straße.[8] Heading towards Lehener Straße, trams were still signposted for the Hauptbahnhof.

Within the inner city, the operating company introduced a uniform tariff of ten pfennigs in 1902, and it was the only reason for a one-off transfer to Bertoldsbrunnen junction (colloquially called Fischbrunnen, or Fish's Well), Schwabentorbrücke and Lorettostraße. The fee for the route from Günterstal to Lorettostraße was ten pfennigs. It also cost 20 pfennigs for trips beyond Lorettostraße.

Network map 1902

[9]

First extensions

The junction of Bertoldsbrunnen around 1904, the traversing stretch of Lines B and C was at that time still a single-track. The tram serving Line D is marked with Günterstal - but is heading northwards. The destination were not changed at the end points and were valid only in one direction of travel.

The 15-minute trip to Günterstal was inadequate for the high demand on this service, so the operating company installed two additional passing points at Waldhüterhaus on Schauinslandstraße and at Günterstaler Kreuz, which reduced the trip time to 10 minutes. In order to further increase capacity on this route, three more summer trams were put into operation in the same year, and the first extensions were installed. At the beginning of the summer schedule in 1905, Alter Messplatz, also called Bleicheweg, was added to the loop at Stadthalle—the first terminal loop in Freiburg. The terminus station was Waldsee, named after the waters in the recreation area of Möslepark.

In the following year, lines B and C were expanded into two-track lines, except for the short single-track section between Bleicheweg and Waldsee.

In 1908, both of the newly constructed stretch of tracks between Hauptstraße and Okenstraße, and Lehener Straße to Güterbahnhof became operational. The latter was located on Breisacher Straße and Hugstetter Straße to Hohenzollernplatz (now Friedrich-Ebert-Platz). The route followed along the course of Heiliggeiststraße and Friedhofstraße to the terminating station of Güterbahnhof on the corner of Waldkircher Straße/Eichstätter Straße. The route was designed to be double-tracked right for five-minute cycles.

Further extensions after 1909

When the new bridge from Siegesdenkmal via Friedrichring, Friedrichstraße, and Hauptbahnhof to Stühlinger was commissioned, a fifth line was introduced in 1909 using Arabic numbers. The new Line 5 operated on a ten-minute cycle and used the "Blue Bridge" to cross the main railway line.[10] In Stühlinger, the terminal loop was built around the Herz-Jesu church. Further destinations included the districts of Haslach, Herdern, and Zähringen, as well as a short extension in Wiehre:

  • 1910: Lorettostraße - Goethestraße and, after completion of the new railway underpass Komturbrücke, Rossgässle (today Okenstraße) - Reutebachgasse
  • 1913: Stühlinger Kirchplatz (today Eschholzstraße) - Scherrerplatz
  • 1914: Siegesdenkmal - Immentalstraße
Komturplatz was originally located directly below the Rhine valley railway. The former stop=house with the engraved opening date has been preserved to this day.

Zähringen had only belonged to Freiburg from 1906, the tram connection was part of the Merger treaty.[11] The route through Herdern forced the introduction of a sixth line.

Four other stretches of track were planned, but they could not be implemented because of World War I. A line was planned to connect Johanneskirche and Reiterstraße, another between Stühlinger Kirchplatz and Hohenzollernplatz via Eschholzstraße, and one more from the Betzenhausen and Mooswald districts.[12]

An overland stretch from Günterstal via Horben and Schauinsland to Todtnau was planned,[12] where the route was going to connect a metre gauge train line to Zell im Wiesental. The planners had hoped for a quick connection to the tourist-friendly southern Black Forest.

World War I

During World War I, most of the workforce was conscripted for military service. Of the original 133 employees, only eight remained. As a result, women were employed for the first time by the Armed Forces from 1915.[13]

After the war started, the tram network was used to transport the wounded to numerous lazarettos across the city. As a result, a new railway connection was constructed from Zollhallenplatz, through Neunlindenstraée and Rampenstraße to the remote military section of the freight station. Trams for transporting injured people waited for the lazaretto trains at the loading stations. The carriages and sidecarriages were able to transport twelve heavily wounded people.[14] In total, 20,779 injured soldiers were transported. After World War I, the track through Neunlindenstraße served as a shortened form for many years to link the former railway track at Kaiserstuhlstraße.

A connection between the trams and the Grand Duchy of Baden State Railway was built in 1917 in the civilian part of the Güterbahnhof. This track originated from the terminal station, which was located at the mouth of Eichstetter Straße into Waldkircher Straße to Güterbahnhof, in order to enable direct reloading. The company procured ten freight trucks and rebuilt the open summer carts 102–104. The connection existed until the start of the 1980s, when the GT8K motor coaches were delivered to Freiburg via a partially four-lane line.

The company began to expand existing routes into two-track lines. The second track between Wonnhalde and Wiesenweg went into operation on the route towards Günterstal at the end of 1913. In the autumn of 1917, the section followed from Silberbachstraße to Wonnhalde.

During the war, a severe accident occurred immediately after an air attack on the level crossroads at Hellentalbahn. On 12 October 1916, around 9:30 pm, a tram driver travelling into the city did not see the closed barrier at night and collided with a railway train travelling uphill. The driver was severely injured, and the conductor and the only passenger only suffered minor injuries.[15][16]

Period between the World Wars

Line 5 ran to Stühlinger from 1909 until 1961 via the Wiwili Bridge, still known as the Blaue Brücke (Blue Bridge).

In 1919, the operating company combined Line 5 (Siegesdenkmal – Scherrerplatz) and Line 6 (Siegesdenkmal – Immentalstraße) into the new Line 5 from Scherrerplatz to Immentalstraße. In 1921, there were already six lines when the terminus of Line 3 was moved from Goethestraße to the stop at today's Musikhochschule, and a new Line 6 from Schwabentorbrücke to Goethestraße was introduced. In the same year, lines became colour-coded in order to facilitate passenger orientation.[17]

Because of hyperinflation in the Weimar Republic, daily passenger numbers decreased from 40,000 in 1919 to under 3,000 in 1923. At the same time, the price for a one-way journey increased from 15 pfennigs to 100 billion Reichsmark, and tram rides became unattractive. Line 6 was discontinued on 16 October 1916 and the cycles of the other lines waned. The situation only improved when the Rentenmark was introduced in November 1923. On 22 December 1924, Line 6 was reopened between Schwabentorbrücke and Goethestraße.

In 1925, a further extension went into operation in the suburb of Littenweiler, which had been incorporated in 1914. It was to be opened in the same year as the Merger treaty, and was one of the reasons for the community giving up its independence,[18] but the extension had to be delayed by eleven years because of World War I. At times, an alternative route through the southern-running Waldseestraße was considered. Its course would have led to the centre of Littenweiler, but directly after the loop at Stadthalle, a further crossroads with Höllentalbahn became necessary. After the line was extended to Littenweiler, the garden city of Waldsee, which had only been established after World War I, also profited. It closed the settlement gap between the Wiehre and Littenweiler, and connected with Freiburg's city centre. In the same year, the first motor bus from Freiburg was set up from Hohenzollernplatz to Betzenhausen.

In 1928, the operating company built the last part of the new stretch of track between Rennweg and Komturplatz, where a second depot was opened at the same time. In return, the operation of the short branch line between today's stop at Rennweg and Güterbahnhof was stopped.

After the Schauinslandbahn was opened on 17 July 1930, the tram's directorate applied for a two-track extension between Wiesenweg and Günterstäler Tor on 23 January 1931 to improve the feeder service to the Talstation. The company also planned a new four-kilometre long stretch of track to connect the mountain railway network to the tram network.[19] Die Gesellschaft plante außerdem eine vier Kilometer lange Neubaustrecke zur Anbindung der Bergbahn an das Straßenbahnnetz.[20] At the terminus of Talstation, a terminal loop was built in front of the station building, which forced the side carriages to be suspended in Günterstal, and motor cars had to be operated on their own up to the Talstation. The high costs for the maintenance garage in Günterstal and five additional rail cars led to the decision of using this connection as an alternative to bus routes.

Line map from 1934

In 1931, the first complete shutdown of a section took place when the route leading to Goethestraße went out of service. Line 6 served between Schwabentorbrück and the Wiehre train station. The section between Wiehre train station and Lorettostraße remained as an operational route to the depot.

From 1933, members of the Sturmabteilung and the Schutzstaffel, as well as members of the Hitler Youth received a tariff reduction by one unit price of ten Reichspfennigs on any route. Jews were forbidden from using public trams.[21]

On 8 November 1934, the facilitation of operations in a southern direction led to a relief for the tram network, and as a result the level crossing was no longer in use. The main railway line crossed the Günterstal section at Holbeinstraße at Sternwaldtunnel. The tram company was also able to complete the two-track expansion of the route to Günterstal by closing the gap between Lorettostraße and Silberbachstraße. The neutralisation of the railway also affected the tram network, because the Wiehre now had access to a new train station on Türkenlouisstraße. At the time, there was no direct connection between Höllentalbahn and Line 6.

From 1938 to 1943, the annual number of passengers doubled to more than ten million passengers as motorised private transport almost stopped as a result of the crude oil crisis. However, no new vehicles could be procured.[22] In order to maintain the network, in the years of 1942 and 1943, 43 of the original 101 stops were closed. After six years of operation, Line 6 was reactivated from 196, and connected Schwabentorbrücke to Lorettostraße. The loop at today's Stadthalle no longer served there from 1938 to 1939 in accordance to the plan, since trams on the reinforced Line 3 stopped at Römerhof.

In 1943, the city council decided to introduce the trolleybus as a third mode of urbanised transport after diesel had become scarce to operate buses.[23] Bus Lines B (Johanesskirche to Haslach Englerplatz) and C (Johanneskirche to St. Georgen) and, optionally, the second tram network had to be changed over to the entire tram network. Construction began with the installation of the first overhead mast on 1 August 1944. As a result of World War II, there were delays to the overhead line material and ordered vehicles. After the war, construction was abandoned.

World War II and Post-War era

Tram at Hansjakobstraße (June 1944)

During the air attack on Freiburg on 27 November 1944, several vehicles and half of the overhead network were destroyed.[24] At the time of the attack, there were around 30 vehicles in evening traffic in service. Rail car 1 was destroyed at the railway depot, car 7 by detonations in the Nord depot, and two sets of carriages from vehicle 53 and the side carriage of 110 in front of the City Theatre. Carriage 44 and side carriage 107 were hit at Bismarckallee. 26 other vehicles were badly damaged by the bombs.

From 15 April 1945, all trams stopped operations as the electrical crossing had been destroyed during the war. On 26 May 1945, the operating company resumed the Holzmarkt-Günterstal and Oberlinden-Littenweiler routes after repairing the tracks and overpass on the slightly damaged sections of the route. After a temporary bridge had been erected for the Rheintalbahn at Komturplaty, the entire Zähringen-Günterstal route was operational for lines 1 and 2 again from 4 October 1945. Line 5 was interrupted by a bombing on the Blue Bridge until 1948. On 1 September 1946, a shuttle service was established.

Substation at Lorettostraße

Reconstruction plans included numerous varieties of trams. Ultimately, the original routes were maintained to preserve the accessibility and importance to the city centre. A changeover to trolleybus operation was criticised by planners after it failed to start during the Second World War.[25]

The trolley bus operation in a densely built city centre can never reach the performance of a railroad

Planner of the City's Tram Network, 1953

In 1950, the connection between Schwabentorbrücke and Lorettostraße lost its line traffic, but remained as an operational route to the depot until 1959.[26] Line 5 experienced a further 300 m extension from Immentalstraße to St. Urban church.[27] A further extension at Richard-Wagner-Straße and Hinterkirchstraße to Zähringen could not be implemented.

Until 1959, additional trams were provided after evening shows at Theater Freiburg. They travelled from the tri-track station in Bertoldstraße to the Wiehre, Zähringen and Günterstal.[28]

Unidirectional operation and closure of Line 5

Line network in 1950, before Lines 5 and 6 were operational

The lack of managers and desire to save jobs led to the commissioning of the so-called "Sputnik trams", which were named after the first artificial earth satellite in 1957. They had the same capacity as a two-axle carriage and side carriage, but could be handled by one conductor using a one-way embarking and disembarking system. They were also the first Freiburg uni-directional vehicles but could only be used on Line 4. A provisional triangular junction had been set up at the terminus station at Littenweiler. They had already been using the turning loop started in 1954 at the other end of the commuter station. Another novelty of the early 1950s were the three-car coaches, which consisted of a motor coach and two side carriages.

At the end of 1961, the operating company closed Line 5 for "economic and traffic reasons", and replaced it with the then bus line H. The reason for the decommissioning was, among other things, the poor introduction into the traffic area. A conversion to a more efficient route with its own railway body was therefore not possible. In addition, modern traction units could not be used on the curvy track. Thus, as in the early days, there were only four lines.

In order to spare the cumbersome marshalling operation at the triangular junction of line 4, the VAG installed a turning loop at Littenweiler due to the lack of space at Lassbergstraße, which meant that Littenweiler lost its tram connection. In the district of Brühl at the other end of the line, a new block of flats was opened on 20 December 1962[29] at Offenburgstraße and Hornusstraße. The old loop at Komturplatz became a hindrance to traffic because of the cramped situation.[30]

By shortening the track in Littenweiler, the network shrank by almost 30 percent within a few years: from 19.7 kilometres in 1945 to 14.2 kilometres in July 1962. In 1966, the city tram produced their first unmanned traction coaches with a red S on a white background. Due to safety reasons, the doors of the side cars and most of the older units had to be manually operated. Nevertheless, individual units which were procured before 1966 were also adapted for one-man operation.

Price struggles, discussions on decommissioning and further rationalisation

Special tram journey from the Regional Centre for Political Education celebrating the 40th anniversary of the Freiburg Price Struggles

On 1 and 2 February 1968, the "Freiburg price struggles" caught nationwide attention. At the time, some 2,000 people protested against price increases, occupied Bertoldsbrunnen, and stopped all trams. The protest was unsuccessful.

While many other cities discussed decommissioning trams, Freiburg decided to maintain and modernise towards the end of the 1960s. In 1969, due to the above-average urban planning to the west, a first general traffic plan was adopted. New buildings formed a decisive approach to promote the maintenance and expansion of inner-city tram transport.

In 1971, a small series of modern eight-axle articulated trams manufactured by Duewag was introduced with plans to be further expanded. They could also be operated single-handedly and carry exactly the same number of passengers as the multi-staffed three-car or four-axle units with two-axle side cars. The articulated trams were specially designed for Freiburg's narrow streets, with a four-axle centre wagon and a saddle-mounted end car with a bogie.

In the same year, a rationalisation commission was convened to examine a complete changeover to bus operation.

This is one thing, however, one can completely ignore nowadays: the time of the streets is over. In the future, they will be increasingly degraded in our cities.

Interim Report of the Rationalisation Commission in 1971

The municipal council endorsed the 1969 general public transport plan in 1972 by a large majority. They thought a connection with trams was more sensible, especially for the western districts. A pedestrian zone on Kaiser-Joseph-Straße was introduced in November 1972. Motorised traffic into the Old City was forbidden and only trams were allowed.[31] From then onwards, investments were made to modernise and accelerate the existing network.

While the inner city ring was being constructed, a single-track parallel section across from the Greifneggring was installed between the Schwabentor and Schwabentorbrücke. At the same time, the existing stretch across the Schwabentorring was restored to provide enough space for separate track space and two lanes of traffic. Due to the connection between the older and newer routes, trams heading towards the city centre from Littenweiler could be reversed before they reached Schwabentor.

On 17 March 1978, the first ceremony for the (almost) urban railway standards with an independent railroad track was extended to Landwasser by Mayor Eugen Keidel and Secretary of State Rolf Böhme. At the start of the 1980s, the first existing stretches of track were given their own reservations, such as the section between Komturplatz and Zähringen.[19] In 1981, the next series of modern articulated trams ended the side carriage operation and the Schaffner era.

Era of the city railways and "environmental season tickets" from 1983/1984

On 9 December 1983, a new stretch of line was opened heading towards Padauallee is seen as the start of the city railway era. At the heart of the Western Expansion was Stühlinger Bridge, also called City Railway Bridge, which was built over the Rhine Valley Railway and the Höllentalbahn. Since then, the new Hauptbahnhof (main train station) has enabled direct access to the railway lines. In the same year, the VAG increased the voltage from 600 volts to the conventional 750 volts of direct current. When Line 5 was introduced, the line network expanded nd the routes became colour-coded, which are visible as roll signs on each tram. Line 1 replaced Line 4 as the main line, with the new circle routed Line 3. During peak times, trams travelling to the Reutebachgasse terminus could only travel in one direction north of Hornusstraße.

Around that time, a nationwide debate began. It concerned the introduction of a cost-effective and transferable Regio-Umweltkarte (or "environmental protection monthly ticket") based on the system used in Basel, which became operational since 1 March 1984 and was quickly adopted in other Swiss cities such as Bern and Zürich. Associated price reductions were countered by passenger growth, which led to improvements in the company's business. Many German transport companies, including VAG, did not fit into the concept of its high publicity. They were supported by the former Association of German Transport Companies, the municipal top associations and large sections of the scientific community who frequently warned against the introduction of these tickets. "One shied away from new ideas with new risks, was unable to find a general offer for the offensive and therefore conjured up everywhere the fact that environmental issues were only a flop and led to more deficits".[32]

Opening of Stühlinger Bridge (1983)

On 24 July 1984, the municipal council decided to introduce the first "environmental protection monthly ticket" despite the VAG rejecting the proposal, and the system began in October.[33] Prices were reduced by at most 30 percent, and the price for the transferable environmental subscriptions was set at 38 Deutsche Marks, or 32 Deutsche Marks a month for concession (the non-transferable monthly ticket cost 51 Deutsche Marks and originally increased to 57 Deutsche Marks in 1985).

This introduction of a cost-effective and transferable monthly ticket caused passenger numbers to rise 12 percent in 1984 and 23 percent the following year, or 5 million to 33.8 million passengers in 1985. Despite the considerable price reduction, the VAG made a profit of 250,000 Deutsche Marks in 1985 alone.[34] Within four years, the number of environmental subscriptions sold rose from 60,500 to 309,000.[35] The ticket served as a breakthrough for German transport companies: "After Freiburg, the trend towards environmental subscriptions could no longer be stopped across Germany."[35]

The Transport Community of Freiburg was founded in 1985, along with the rural districts of Emmendingen and Breisgau-Hochschwarzwald, and Freiburg kept to one tariff zone instead of multiple.[34] The Transport Community of Freiburg, which was purely company-oriented, was a predecessor of the Regio-Verkehrsbund Freiburg (RVF) and was founded in 1994.[36]

The passenger increase that increased by almost 25 percent in a few months was managed relatively well by the tram units. However, because the number of passengers using the network drastically increased in 1985, which was not anticipated by the VAG, ten used GT4-trams from Stuttgart's tram network had to be taken by the company, as the Stadtbahn in Stuttgart began to replace trams. They were the first and only used trams in the history of VAG to be purchased. A novel feature of Freiburg was the use of multiple units and the division of leading and guided units. The trams, referred colloquially as "Spätzlehobel"[37] which were always used in Freiburg in their yellow and white Stuttgart livery, were only replaced by new trams in 1990.

The Regio-Umweltkarte, introduced on 1 September 1991, provided for itself, and previously, its own intermediate stages, partly for increasing passenger growth. The VAG used the outdated Sputnik trams from 1959 until 1993. The Regio-Umweltkarte, in addition to its own monthly ticket, had a connection card available for travel across neighbouring regions costing 15 Deutsche Marks. In 1987, the Regio-Umweltkarte reduced ticket prices by about 25 percent (which was also the case in Basel), which led to a spark in further traffic and environmental issues across Germany[34]

In 1985, the VAG completed the project of providing a tram line to Landwasser by extending the former terminus at Paduaallee by 1.8 kilometres over Elsässer Straße and reaching Moosweiher.

In the following year, a new route from Friedrich-Ebert-Platz to Hohenzollernstraße, Breisacher Straße and Fehrenbachallee replaced the old route via Hugstetter Straße and the station forecourt, causing Lines 3 and 4 ti cross over Stühlinger bridge.[38]

Start of the low-floor age

Line map, 1991

When the first GT8N series motor trams were delivered, the VAG began offering its passengers a low-floor entry starting in 1990. It was to be the third tramway network to do so after Würzburg and Bremen. The rapid development of low-floor technology during these years reflected in Freiburg's acquisition of trams. If the first trams only had a low-floor section of seven percent and a depth rise of five doors, the second low-floor generation in 1994 had a low-floor section of 48 percent and barrier-free access to three out of the four doors. From 1999, only low-floor units were purchased. VAG equipped almost all the older stops across the network with 24-centimetre high platforms.

In March 1994, the three-kilometre long extension between Runzmattenweg and Bissierstraße built in 1983 became accessible to the Haid industrial park via vineyards. The route runs parallel to Berliner Alllee and crosses the B31 and the Dreisam. In the vineyard, the route runs along a track to the west of Binzengrün Straße before turning onto Opfinger Straße. The route crosses Besançonallee and reaches the western depot, where it runs on its own rail west of Besançonallee to Munzinger Straße, which meant the Western Railway Depot received a railway link for the first time.

Characteristic of all new stretches of track since 1980 are the numerous "lawn tracks". Freiburg here was a pioneer for a new type of track.

The depots at Komturstraße and Urachstraße were less important. The northern depot was demolished in 2007, while the southern depot became a museum.

The link to the newly developed district of Rieselfeld was established in 1997. On this 1.3 kilometre section, the route runs on a ridged track in the middle of Rieselfeldallee and serves three stops at Geschwister-Scholl-Platz, Maria-von-Rudloff-Platz and Bollerstaudenstraße. The terminal loop at Rieselfeld turns around a residential building, the "Tram-Turm".

On 3 June 2002, the VAG introduced a relief Line 8 from Munzinger Straße to Stadthalle in 15-minute cycles, which was discontinued on 27 July 2002.

After 40 years, the Haslach district had a tram network when Line 7 was first opened between Am Lindenwäldle and Pressehaus in October 2002. The route follows the vineyard route and runs to the north of Opfinger Straße to the crossing of the freight railway, then goes down Carl-Kistner-Straße and serves Haslach Bad, Scherrerplatz and Dorfbrunnen in the middle of Haslach. There was controversy when the link connecting Pressehaus and the Innenstadt happened: although the majority voted for the route to lead to Stadttheater via Kronenstraße in 1997, the municipal council voted for a different route via Basler Straße to Johanniskirche.[39] In 2004, the entire route between Am Lindenwäldle and Johanniskirche became operational as Line 5. The costs for this project amount to about 30 million Euros. Later, it was decided to implement the first-named routed as part of the "Stadtbahn Rotteckring".

The district of Vauban, built on the site of a former barracks in 1998, also had access to the tram network in 2006 after three years of construction.[40][41] The cost amounted to 18 million euros instead of the originally estimated 30 million.[42] The 2.5 kilometre long section branches off from the route towards Haslach to Merzhauser Straßer after the stop at Heinrich-von-Stephan-Straße, and runs mostly along a road towards Merzhauser Straße. At Paula-Modersohn-Platz, the route turns into Vaubanallee and runs mainly northwards until its final stop at Innsbrucker Straße.

Expansion program "Stadtbahn 2020" and night trams

Between February 2009 and November 2010, the section of the track was completely renovated by Habsburger Straße. In addition, three stops at Tennenbacher Straße, Hauptstraße and Okenstraße were adapted to operate without barriers.[43] The section between Maria-Hilf-Kirche and Musikhochschule along Schwarzwaldstraße was modernised in 2011.[44]

On 15 March 2014, the 1.8 kilometre stretch was opened from Reutebachgasse to the centre of Zähringen at Gundelfinger Straße after three years of construction. Part of this project included the construction of the stop at Reutebachgasse. The route follows Zähringer Straße, crosses the freight railway and runs on its own line west of Gundelfinger Straße to the southern outskirts of Gundelfingen. Part of the terminal loop is located at the Gundelfinger boundary, so trams leave the region of Freiburg here. The cost of this construction project was 24.5 million euros.[45]

From the beginning of June to the end of October 2014, tracks at the junction of Bertoldsbrunnen were renovated after the points broke.[46] During the renovation, all lines had to be relocated to the edge of the inner city (Siegesdenkmal, Stadttheater, Holzmark and the Schwabentor loop). During this time the GT8N-operated Line 1 heading east was operational, because a provisional depot had to be erected at Möschlschleife due to the lack of a track connection to the depot.[47]

When the timetable changed on 14 December 2014, the city council decided to reduce the noise in the inner city by providing a continuous night service in 30-minute cycles on Saturday, Sunday and pre-selected holidays, except for the sections between Johanniskirche and Günterstal, and Technisches Rathaus and Hornusstraße.[48] This cost around 550,000 euros yearly and, according to VAG, has been seen as a positive move. By counting the number of passengers on the night services in November 2014, it was reported that a high four-digit number of passengers use the service nightly.[49]

The next expansion was the Stadtbahn Messe, for which construction started on 14 June 2013, and which opened to Technische Fakultät on 11 December 2015 and to the Messe on 13 December 2020. The 1.5 kilometres (0.93 mi)-long initial phase crosses the network at Robert-Koch-Straße and continues via Breisacher Straßer and Berliner Allee to Technische Fakultät just to the north of the Freiburg-Colmar railway link, while the second phase continues a further 970 metres (3,180 ft) to Messe. The new Line 4 was initially marked as MESSE (in uppercase lettering) before being changed to Messe in February 2016.[50][51][52]

In 2019 the System received a new major expansion with the completion of the Rotteckring tram. This added a new North-South Line through the city center. The new Line divirges from the existing network at Heinrich-von-Stehpan-Straße, crosses the Dreisam on the Kronenbrücke, which was rebuilt during construction of the expansion, before entering the City Center. This also added Stops at existing Stations Stadttheater and Europaplatz. The line opened on the 16th of March 2019.[53]

On 14 June 2023, the new Stadtbahn Waldkircher Straße opened. Part of the existing tram tracks of line 2 running through Komturstraße were moved into Waldkircher Straße in order to better connect the main parts of the district and to make it possible for the stations to be barrier-free, as the previous stops Komturplatz and Eichstätter Straße were on the street itself.[54]

Operations

Overview

The five tram lines, all of which are cross-city routes, serve a total of 78 stops. The average distance between stops in 2012 was 456 metres.[55] Trams run between 5 am and 12:30am Monday to Friday, and non-stop on weekends. The line length is 32.3 kilometres, and cumulatively 40 kilometres.[56] VAG operates a total of 24 substations with an installed total transformer capacity of 33.75 megavoltamperes (MVA).[57]

Line Route Stops Cycle Length Journey time Mode Trams used Courses at one time Course numbers
1 Littenweiler, Laßbergstraße[58] - Landwasser, Mossweiher 22 6 mins 9.9 km 31mins Unidirectional GT8K, GT8N, GT8Z (rarely),

Combino, Urbos

16 01 - 115
2 Günterstal, Dorfstraße - Hornusstraße 20 10 mins 8,0 km 30mins Bidirectional GT8Z 8 220 - 227
3 Vauban, Innsbrucker Straße - Haid, Munzinger Straße 21 7.5 mins 9.2 km 32mins Unidirectional GT8K, GT8N, GT8Z, Combino,

Urbos

11 330 - 341
4 Messe Freiburg - Zähringen, Gundelfinger Straße 20 6min; 7.5 mins 9.2 km 32mins Unidirectional GT8K, GT8N, GT8Z, Combino,

Urbos

12 442 - 453
5 Rieselfeld, Bollerstaudenstraße - Europaplatz 15 6min; 7.5 mins 6,3 km 20 mins Bidirectional GT8Z, Combino, Urbos 8 565 - 572
  • GT8K, GT8N, Combino and Urbos cannot be used on line 2 because they are unsuitable for the route, as the terminal station in Günterstal is too short and does not have a loop for unidirectional trams to turn around.
  • The GT8Z is usually not used on line 1 because its capacity is too low for the line's demand, making it a rather rare sight.
  • In the evenings from 9 pm to 11:01 pm, lines 1, 2, 3 and 4 meet in both directions for minutes 01, 16, 31 and 46 to form a circular enclose at Bertoldsbrunnen. After this time, they wait until 01 and 31.
  • A night service leaves every 30 minutes from Bertoldsbrunnen between 1am and 4:30 on Saturday, Sunday and on selected bank holidays on Lines 1, 3, 4 and the Rieselfeld-Europaplatz section of line 5.[59] Günterstal and other inner- and non-urban destinations are connected to the night service in the form of taxis and buses.[60]
  • Trams heading to and from the depot at VAG-Zentrum are marked with the red slash that is used for lineless operation instead of a line number. Trams coming from the depot stay this way until they arrive at the terminal station of the line which it then switches to. Trams heading to the depot have Am Lindenwäldle as their destination and final stop, as this is the last one before the trams turn rightward onto the area of the VAG-Zentrum.
  • The unidirectional tram models travel in reverse when heading to and from the Depot before switchting direction at a crossover. This procedure is done in the sections VAG-Zentrum to Runzmattenweg (line 1) and Heinrich-von-Stephan-Straße to Vauban, Innsbrucker Straße (line 3).
  • With the exception of Bertoldsbrunnen, Klosterplatz and Oberlinden, all stations have platforms with barrier-free access to low-floor vehicles.
  • Course numbers are not stated by lines (for example, line 3, course 1) but by a three-digit number range. It was originally a two-digit range.[61]
  • Apart from the terminus stops, all stops along Freiburg's tram network are request stops.

Special service to the Europa-Park-Stadion

When there is an SC Freiburg home game in the Europa-Park-Stadion, four special service lines start three hours prior to kick-off. They run as express trains from Hauptbahnhof, Zähringen (non-stop from Friedrich-Ebert-Platz), and Landwasser (non-stop from Runtzmattenweg). The fourth line runs from Munzinger Straße and stops at all stations. After the game the special service lines start from the triple platform Europa-Park-Stadion Station and run express to Rathaus im Sthülinger and Friedrich-Ebert-Platz.[62]

Tariff

Trams have been a part of the Regio-Verkehrsverbund Freiburg (RVF) since 1994. The entire network is located within tariff zone A, which means that a tram ride has a level 1 tariff. The pass is called the "Regio-Karte": it is readily available and is valid throughout the network. Single tickets cost 2.30 euros for general, and 1.40 euros for children up to 14 years of age. Day tickets (Regio 24) and various other tickets are also available. Bikes are not permitted on any tram on the network.[63]

There are ticket machines in each carriage and at important stops. Passengers cannot buy tickets from the driver since the start of 2016.[64]

Development of passenger numbers

1902 1919 1923 1936 1984 1985 2000 2013
3,250,000 14,600,000 800,000 9,400,000 29,000,000* 33.800,000* 65,000,000* 63,400,000*

* Passenger numbers from 1984, 1985 and 2000 also include buses and rail replacement services, as there is no explicit data for these years.

Route timeline

The following table shows all openings and closures in passenger-oriented trams. Temporary routes are not included.

Route Opened Closed
Günterstal - Bertoldsbrunnen - Rennweg 14 October 1901
Hauptbahnhof - Bertoldsbrunnen - Alter Messplatz 2 December 1901
Schwabentorbrücke - Alter Wiehrebahnhof - Lorettostraße 2 December 1901
Hauptbahnhof - Lehener Straße 1902
Alter Messplatz - Musikhochschule 1905
Lehener Straße - Friedrich-Ebert-Platz - Güterbahnhof 1908
Rennweg - Okenstraße 1908
Siegesdenkmal - Hauptbahnhof 17 June 1909
Siegesdenkmal - Stühlinger Kirchplatz 1 September 1909
Okenstraße - Komturplatz - Reutebachgasse 10 March 1910
Lorettostraße - Goethestraße December 1910
Stühlinger Kirchplatz - Scherrerplatz October 1913
Siegesdenkmal - Immentalstraße 1 July 1914
Musikhochschule - Römerhof - Bahnhof Littenweiler 7 March 1925
Kaiserstuhlstraße - Güterbahnhof 1928
Kaiserstuhlstraße - Komturplatz 1928
Lorettostraße - Goethestraße 15 October 1931
Immentalstraße - Herdern Kirche 1 July 1951
Schwabentorbrücke - Alter Wiehrebahnhof - Lorettostraße 1959
Scherrerplatz - Wilhelmerstaße and Hauptbahnhof -

Siegesdenkmal - Herdern Kirche

31 December 1961
Laßbergstraße - Bahnhof Littenweiler 20 December 1962
Stadttheater - Rathaus im Stühlinger - Paduaallee 9 December 1983
Runzmattenweg - Bissierstraße 9 December 1983
Paduaallee - Moosweiher 14 June 1985
Rathaus im Stühlinger - Friedrich-Ebert-Platz 27 September 1986
Hauptbahnhof - Hugstetter Straße - Friedrich-Ebert-Platz 27 September 1986
Bissierstraße - Am Lindenwäldle - Munzinger Straße 26 March 1994
Am Lindenwäldle - Bollerstaudenstraße 14 September 1997
Am Lindenwäldle - Pressehaus 12 October 2002
Pressehaus - Johanneskirche 20 March 2004
Heinrich-von-Stefan-Straße - Innsbrucker Straße 29 April 2006
Reutebachgasse - Gundelfinger Straße 15 March 2014
Robert-Koch-Straße - Technische Fakultät 11 December 2015
Heinrich-von-Stephan-Straße - Europaplatz 16 March 2019
Technische Fakultät - Messe Freiburg 13 December 2020

Line timeline

Lines were originally given letters before they were assigned Arabic numerals in 1909. Each line had its own destinations, which differed in colour. Lines were officially colour-coded in the summer of 1921. The VAG introduced a line reform in 1983, when the colours of the lines were changed and coloured roll signs were introduced to display the line number.

Daily usage

Line Route From Until
A Hauptstraße (formerly: Rennweg) – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Lorettostraße 14 October 1901 1908
Okenstraße (formerly: Roßgäßle) – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Lorettostraße 1908 16 June 1909
1 17 June 1909 14 April 1921
15 April 1921 27 November 1944[lower-alpha 1]
13 March 1946 19 December 1962
Hornusstraße – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Lorettostraße 20 December 1962 8 December 1983
1 Laßbergstraße – Schwabentorbrücke – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Paduaallee 9 December 1983 13 June 1985
Laßbergstraße – Schwabentorbrücke – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Moosweiher 14 June 1985 today
D Hauptstraße (formally: Rennweg) – Siegesdenkmal – Bertoldsbrunnen – Dorfstraße 14 October 1901 1908
Okenstraße (formally: Roßgäßle) – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Dorfstraße 1908 16 June 1909
2 17 June 1909 9 March 1910
Reutebachgasse – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Dorfstraße 10 March 1910 14 April 1921
15 April 1921 27 November 1944[lower-alpha 1]
Holzmarkt – Dorfstraße 28 November 1944 15 May 1945
25 May 1945 3 October 1945
Reutebachgasse – Komturplatz 25 June 1945 3 October 1945
Reutebachgasse – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Dorfstraße 4 October 1945 September 1996
29 April 2006 14 March 2014
Gundelfinger Straße – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Dorfstraße 15 March 2014 10 December 2015
Hornusstraße – Europaplatz (formerly: Siegesdenkmal) – Bertoldsbrunnen – Dorfstraße 11 December 2015 16 March 2019
Hornusstraße - Friedrich-Ebert-Platz - Hauptbahnhof - Bertoldsbrunnen - Dorfstraße 16 March 2019 today
C Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Alter Messplatz (formerly: Bleicheweg) 2 December 1901 1902
Lehener Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Alter Messplatz (formerly: Bleicheweg) 1902 1905
Lehener Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Waldsee) 1905 1908
Güterbahnhof – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Waldsee) 1908 16 June 1909
3 17 June 1909 14 April 1921
3 Güterbahnhof – Hauptbahnhof – Bertoldsbrunnen – Alter Messplatz (formerly: Bleichestraße) 15 April 1921 7 March 1925
Güterbahnhof – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Waldsee) 8 March 1925 1928
Friedrich-Ebert-Platz (formerly: Hohenzollernplatz) – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Waldsee) 1928 1938
Friedrich-Ebert-Platz (formerly: Hohenzollernplatz) – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Römerhof (formerly: Wendelinstraße) 1938 27 November 1944[lower-alpha 1]
3 13 March 1946 1953–1957
Hauptfriedhof (formerly: Friedhof) – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Römerhof 1953-1957 19 December 1962
Hauptfriedhof (formerly: Friedhof) – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Laßbergstraße 20 December 1962 ?
Hornusstraße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Laßbergstraße ? 8 December 1983
3 Circular route: Hornusstraße – Hauptbahnhof – Bertoldsbrunnen – Siegesdenkmal – Hornusstraße (– Reutebachgasse)[lower-alpha 2] 9 December 1983 26 September 1986
Circular route: Hornusstraße – Robert-Koch-Straße – Hauptbahnhof – Bertoldsbrunnen – Siegesdenkmal – Hornusstraße (– Reutebachgasse)[lower-alpha 2] 27 September 1986 September 1996
Oldtimerlinie:[lower-alpha 3] Paduaallee – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Stadthalle) September 1996 1 October 2005
Innsbrucker Straße – Heinrich-von-Stephan-Straße – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Munzinger Straße 29 April 2006 today
B Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Alter Wiehrebahnhof (formerly: Bahnhof Wiehre) – Lorettostraße 2 December 1901 1902
Lehener Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Alter Wiehrebahnhof (formerly: Bahnhof Wiehre) – Lorettostraße 1902 16 June 1909
4 17 June 1909 December 1910
Lehener Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Alter Wiehrebahnhof (formerly: Bahnhof Wiehre) – Goethestraße December 1910 14 April 1921
4 Lehener Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Waldsee/Mösle) 15 April 1921 6 March 1925
Lehener Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Bahnhof Littenweiler 7 March 1925 1928
Komturplatz – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Bahnhof Littenweiler 1928 27 November 1944[lower-alpha 1]
Oberlinden – Schwabentorbrücke – Bahnhof Littenweiler 28 November 1944 15 May 1945
25 May 1945 12 March 1946
Komturplatz – Friedrich-Ebert-Platz (formerly: Hohenzollernplatz) 25 June 1945 12 March 1946
Komturplatz – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Bahnhof Littenweiler 13 March 1946 19 December 1962
Hornusstraße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Lassbergstraße 20 December 1962 8 December 1983
4 Hornusstraße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Lorettostraße (– Dorfstraße)[lower-alpha 2] 9 December 1983 26 September 1986
Hornusstraße – Robert-Koch-Straße – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Lorettostraße (– Dorfstraße)[lower-alpha 2] 27 September 1986 September 1996
Hornusstraße – Robert-Koch-Straße – Hauptbahnhof – Bertoldsbrunnen – Dorfstraße September 1996 28 April 2006
4 Gundelfinger Straße – Siegesdenkmal – Bertoldsbrunnen – Hauptbahnhof – Robert-Koch-Straße – Technische Fakultät 11 December 2015 12 December 2020
Gundelfinger Straße – Europaplatz – Bertoldsbrunnen – Hauptbahnhof – Robert-Koch-Straße – Messe Freiburg 13 December 2020 today
5 Siegesdenkmal – Hauptbahnhof 17 June 1909 31 August 1909
Siegesdenkmal – Hauptbahnhof – Eschholzstraße (formerly: Stühlinger Kirchplatz) 1 September 1909 October 1913
Siegesdenkmal – Hauptbahnhof – Eschholzstraße (formerly: Stühlinger Kirchplatz) – Scherrerplatz October 1913 22 November 1919
Immentalstraße – Siegesdenkmal – Hauptbahnhof – Eschholzstraße (formerly: Stühlinger Kirchplatz) – Scherrerplatz 23 November 1919 14 April 1921
15 April 1921 27 November 1944[lower-alpha 1]
Eschholzstraße (formerly: Stühlinger Kirchplatz) – Scherrerplatz 1 September 1946 14 April 1949
Immentalstraße – Siegesdenkmal 18 October 1946 14 April 1949
Immentalstraße – Siegesdenkmal – Hauptbahnhof – Eschholzstraße (formerly: Stühlinger Kirchplatz) – Scherrerplatz 15 April 1949 30 June 1951
Herdern Kirche – Siegesdenkmal – Hauptbahnhof – Eschholzstraße (formerly: Stühlinger Kirchplatz) – Scherrerplatz 1 July 1951[65] 31 December 1961
Bissierstraße – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Siegesdenkmal – Hornusstraße (– Reutebachgasse)[lower-alpha 2] 9 December 1983 25 March 1994
Munzinger Straße – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Siegesdenkmal – Hornusstraße (– Reutebachgasse)[lower-alpha 2] 26 March 1994 19 March 2004
Bollerstaudenstraße – Scherrerplatz – Hauptbahnhof – Bertoldsbrunnen – Runzmattenweg – Bissierstraße 20 March 2004 28 April 2006
Bollerstaudenstraße – Scherrerplatz – Bertoldsbrunnen – Hauptbahnhof – Robert-Koch-Straße – Hornusstraße 29 April 2006 14 March 2014
Bollerstaudenstraße – Scherrerplatz – Bertoldsbrunnen – Hauptbahnhof – Robert-Koch-Straße – Hornusstraße (– Gundelfinger Straße)[lower-alpha 2] 15 March 2014 15 March 2019
Bollerstaudenstraße – Scherrerplatz – Stadttheater – Europaplatz 16 March 2019 today
6[lower-alpha 4] Immentalstraße – Siegesdenkmal 1 July 1914 22 November 1919
Schwabentorbrücke – Alter Wiehrebahnhof (formerly: Bahnhof Wiehre) – Goethestraße 15 April 1921 16 October 1922
22 December 1924 15 October 1931
Schwabentorbrücke – Alter Wiehrebahnhof (formerly: Bahnhof Wiehre) 16 October 1931 9 November 1934
Schwabentorbrücke – Alter Wiehrebahnhof – Lorettostraße 1940 1943
1 September 1946 19 November 1950
6 Bollerstaudenstraße – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Siegesdenkmal – Reutebachgasse 14 September 1997 19 March 2004
Munzinger Straße – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Siegesdenkmal – Reutebachgasse 20 March 2004 28 April 2006
7 Munzinger Straße – Scherrerplatz – Pressehaus 12 October 2002[66] 19 March 2004
7 Oldtimerlinie:[lower-alpha 3] Musikhochschule – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Paduaallee 6 May 2006 today
8 Munzinger Straße – Runzmattenweg – Hauptbahnhof – Bertoldsbrunnen – Schwabentorbrücke – Musikhochschule (formerly: Stadthalle) 3 June 2002 27 July 2002
  1. 1 2 3 4 5 Bombing of Freiburg on 27 November 1944
  2. 1 2 3 4 5 6 7 Only for professional traffic
  3. 1 2 Only on the first Saturday between months May and September operated by the Freunde der Freiburger Straßenbahn (Friends of Freiburg's Tramways).
  4. Destination board was divided diagonally. Upper left white and lower right red.

Night service

The night service "Safer Traffic" was originally served by buses from 1996, but have largely been tram-operated since 14 December 2014. There is currently no service due to the Covid-19 Pandemic.[67][68]

Line Route From Until
1 Laßbergstraße – Schwabentorbrücke – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Moosweiher 14 December 2014 today
2/5 Gundelfinger Straße – Siegesdenkmal – Bertoldsbrunnen – Scherrerplatz – Bollerstaudenstraße 14 December 2014 6 December 2015
3 Innsbrucker Straße – Heinrich-von-Stephan-Straße – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Munzinger Straße 14 December 2014 today
4 Gundelfinger Straße – Europaplatz – Bertoldsbrunnen – Hauptbahnhof – Robert-Koch-Straße – Messe 11 December 2015 today
5 Bollerstaudenstraße – Scherrerplatz – Bertoldsbrunnen 11 December 2015 March 2019
5 Bollerstaudenstraße – Scherrerplatz – Europaplatz March 2019 today

Trams

Currently used trams

GT8K

GT8K

In 1981, after a good experience with the Duewag GT8 Geamatic, which was delivered in 1971, another ten vehicles were commissioned with service numbers 205–214 on the route to Landwasser. The high-floor uni-directional trams were delivered with the white and red Freiburg livery and have two front headlights. The seats are arranged transversely in the diagram 2+1 instead of the mechanical stepped cruise control of earlier trams. The second series used for the first time a direct current controller, which was operated via set point transmitter. It allows a largely jerka-free acceleration and deceleration. Compared to the first series, which had scissor pantographs , the second series had single-arm pantographs.

Tram 205 is now used as an historic tram, tram 207 was scrapped in 2007, and trams 208 and 209 were sold to the Ulm tram network in 2008.[69]

Since 2006, trams are usually limited to the morning rush hour or as an additional service to SC Freiburg's home games. From 2012 to 2017, trams 206 and 210–214 were reused due to the GT8Zs' renovation. For this purpose, tram 206, which had not been used for years, was reactivated, and was the first tram to have an LED display, while the remaining vehicles were renovated in March 2013. Due to the introduction of the second Urbos series at the start of 2017, tram 206 was retired again.[70] The remaining two GT8Ks (212,214) will only operate on Lines 1 (during peak times), 3 and 4, as well as for stadium transportation from Mondays to Fridays.[71]

GT8N

GT8N

In 1990, Duewag delivered another series of eleven developed GT8s for a unit price of 2.75 million Deutsche Marks. Unlike its predecessors, the GT8Ns 221–231 have a low-floor middle section that allow barrier-free entry. Firstly, the GT8N were primarily used on Line 1, where they replaced the GT4 procured from Stuttgart.[71]

In contrast to the GT8K, the GT8N were also equipped with scissor pantographs. In 2011, all trams had a matrix display installed. The trams were modernised by the Czech company Cegelec, who replaced the obsolete thyristor technology with relatively new insulated-gate bipolar transistor technology.[72] The aim of this measure was to extend the service life of the vehicles, reduce maintenance costs and electricity consumption, and improve the availability of spare parts. The modernisation process was completed in 2011.

In recent years, the GT8N's usage has been shifted to lines 3 and 5. The 11 trams are generally only used on weekdays.

GT8Z

GT8Z

At the beginning of the 1990s, Freiburg was looking for modern low-floor trams, and the city ordered a series of 26 GT8Z (241–266) in 1994 to start the Haid route. The purchase price was 4 million Deutsche Marks each. Meanwhile, the remaining GT4s were decommissioned.[71] The bi-directional trams could be used across all lines.

For more than 20 years of operation, there were some instances of rusting on the trams, but this has been eradicated since they were modernised in 2012.[71] Outdated transistors were replaced at the Siemens Test Centre at Wildenrath, and Cegelec replaced the electronics (including two new LCDs in the centre cabin) and the seat cushions.[73] Trams 241–245, 247, 250–252, 258, 259, 262 and 264 have been completely renovated. In early 2017, trams 248, 249, 260 and 266 were being modernised and removed from operation. After a test phase in 2013, during which time operation on line 3 was limited, trams that had been modernised were running on lines 2 and 5 from March 2014.

Tram 243 was damaged in a severe crash on 2 February 2023 and will most likely not return into service.[74]

Combino Basic

Combino Basic

When the route to Rieselfeld and Haslach had been opened, the need for trams continued to rise. For this reason, a series of nine trams was ordered from Duewag's successor company Siemens. The first seven-part bi-directional trams were delivered in 1999.[71]

Because of serious design deficiencies (such as loose screws from improper calculations), all Combinos were withdrawn from circulation in 2004. Erroneous values were calculated on high-floored units. Tram 272 was artificially aged in order to gain more insights into the strength of the bodies.[75] The Combinos were refurbished until 2007, but trams 271 and 273-279 are fully operational again.

Combino Advanced

Combino Advanced

The Combino Advanced was built by Siemens and were initially made available free of charge to VAG.[71] In this series, which was delivered in 2004 and 2006 with operating numbers 281–290, the bodies were reinforced in order to avoid problems that the Basic model experienced. Only nine units were planned originally, while car 290 was delivered as a replacement for the scrapped 272 Combino.

The seven-part bi-directional trams differed from their predecessors by having a rounder-shaped head, and the entire passenger section was air-conditioned.

Urbos

Urbos

On 4 February 2013, the Spanish company CAF was awarded the contract to produce twelve 43-metre long seven-sectioned bi-directional trams.[76][77][78] The purchase price was 36 million euros. The first tram was numbered 302 and arrived on 17 March 2015.[79] Five other trams from the first series, numbers 301, 303-306 were delivered during the summer of 2015.[80] Regular deployment began on 22 July 2015 after trail and training trips.[81] The new trams serve Lines 1, 3, 4 and 5. Numbers 307 to 312 were delivered between February and July 2017.[82][83] As of November 2021, there are 17 Urbos currently being used. (301–317)

Future trams

The VAG has ordered another eight Urbos trams, which are expected to be delivered in 2023 and 2024, and are intended to replace the remaining GT8N and GT8K.[84][85]

Former and museum trams

Railcars

The following rail cars were procured for trams, which are no longer used for regular services. Until 1959, the company only had access to two-axle or short four-axle maximum rail cars, and only articulated trams since then. Large-scale units were never used in Freiburg, and all previously cancelled units were high-floored.

The remaining trams are partly used on the Oldtimerlinie 7 operated by Freunde der Freiburger Straßenbahn. In the months of May to September, the route between Paduaallee and Stadthalle happened on the first Saturday of the month, and stops at all intermediate stations could be used free of charge.[86] Historic trams are stationed in the former southern depot at Urachstraße.

Photo Number Unit Manufacturer Type Kind Year of construction In service until Notes
1–27 27 HAWA Two-axle Bi-directional 1901 1954 Number 2 kept as a museum tram
28–30 3 Waggonfabrik Rastatt Two-axle Bi-directional 1907 1960
31–40 10 MAN Two-axle Bi-directional 1909 1962 Number 38 work tram, now kept as a museum tram
41–47 7 MAN Two-axle Bi-directional 1914 1966 Number 42 was handed over to the Museum of Automotive Engineering at Marxzell in 1972 and kept as a museum tram
47–52 6 Waggonfabrik Fuchs Maximum railcar Bi-directional 1927 1968
53–61 9 Waggonfabrik Rastatt Maximum railcar Bi-directional 1927–1929 1978 Number 56 kept as a museum tram
61–74 14 Waggonfabrik Rastatt Multi-purpose Bi-directional 1951–1953 1972 Number 61 in second usaage, first Freiburg tram with steel construction

Number 70 kept as a museum tram

Number 72 was renamed tram 406

100–102 3 Waggonfabrik Rastatt Sputnik Uni-directional 1959 1993 First articulated tram in Freiburg, named after the satelitte of the same name

100 (1967-1994 as 103), was reused as a rehabilitation tram and since 2006 museum tram

101 and 102 were scrapped in 1995.

104–122 19 104–114: Maschinenfabrik Esslingen

115–122: Waggonfabrik Rastatt

GT4 Bi-directional 1962–1968 1994 Sold to the tramway of Brandenburg an der Havel, tramway of Halberstadt and Nordhausen after decommissioning

107 in reprocessing

109 as a museum car

121 as a party car

151–160 10 Maschinenfabrik Esslingen GT4 Uni-directional 1964 1990 Taken from Stuttgart in 1985

After decommission, given to the Halle tramway, 151–157 moved to Iași, and 158–160 were scrapped.

201–204 4 Duewag GT8 Uni-directional 1972 2001 With Geamtic control

Used in Łódź from 2006 to 2012, later scrapped or used for spare parts

Sidecars

Number Unit Manufacturer Year of construction Year of decomisisoning Notes
28–31 4 HAWA 1901 1918–1921 29–31 open saloon wagons, produced for use in Günterstal, renumbered in 1909 to 101–104
32–34 3 Waggonfabrik Rastatt 1903 1944 Procured for use in Günterstal, renumbered 105–107 in 1909, trams were given new bodies in 1954
38–40 3 Waggonfabrik Rastatt 1907 1968 Procured for use in Günterstal, renumbered 108–111 in 1909, trams were given superstructures in 1950
111–120 10 MAN 1909 1971 Matching railcars 31–40 used on lines 2 and 4. Trams had new constructions in 1949 (new numbers 116–125)
126–134 9 Rathgeber 1950 1978–1981 Trailers for the multi-purpose trams
135–143 9 Waggonfabrik Rastatt 1952–1953 1981 Trailers for the multi-purpose trams, 135 and 142 kept as museum trams
105–111 7 Eigenbau 1954 1960 Modified motor trams from series 1 to 27 (3, 4, 6, 10, 18, 25 and 26), originally manufactured in 1901

Departmental vehicles

Originally, the departmental trams were numbered up from 200.[87] Since 1971, they were numbered from 400 since the GT8 at the time was numbered 200.

Number Type Manufacturer Year of construction Notes
201 Water Tram Helmers 1901 In use until 1950, given to the Middle Baden Train Network
201II Auxiliary Equipment Tram HAWA 1901, Renovated 1950 Originated from railcar 27, in use until 196
202 Water Tram Helmers 1909 In use until 1950
203 Grinder Tram Schörling 1914 From 1971, new number 414, in use until 1982, kept as a museum tram
204 Salt Tram Helmers 1901 With snowplow, in use until 1968
205 Salt Tram Eigenbau 1909 In use until 1971, last number 415
207 ? HAWA 1901, Renovated 1954 Former railcar 13, in use until 1961
208 ? HAWA 1901, Renovated 1954 Former railcar 14, in use until 1962
209 ? HAWA 1901, Renovated 1954 Former railcar 15, in use until 1962
209II Transportation Tram ? 1962 From 1971, new number 416
210 ? HAWA 1901, Renovated 1954 Former railcar 21, in use until 1962
210II Transportation Tram ? 1962 From 1971, new number 417
211 ? HAWA 1901, Renovated 1954 Former railcar 12, in use until 1961
212 ? HAWA 1901, Renovated 1954 Former railcar 17, in use until 19XX
401 Driving School Tram Waggonfabrik Rastatt 1951, Renovated 1970 Former railcar 65, decommissioned
402 Catenary Tram Waggonfabrik Rastatt 1951, Renovated 1970 Former railcar 70, rebuilt to original condition in 2016, planned use as a museum wagon
403 Workshop Tram Waggonfabrik Rastatt 1951, Renovated 1971 Former multi-purpose tram, decommissioned
404 Workshop Tram Waggonfabrik Rastatt 1951, Renovated 1971 Former multi-purpose tram, decommissioned
405 Workshop Tram/

Grinder Tram

Waggonfabrik Rastatt 1951, Renovated 1979 Formerly railcar 66, initially workshop tram

From 1982, a grinder tram, sold in 2012 to Halberstadt

406 Workshop Tram Waggonfabrik Rastatt 1951, Renovated 1971 Former multi-purpose tram, given to the Bergish Tram Museum in 2002
406II Track Grinding Tram SF 50 Windhoff 2012 Four grinding wheels, still in use today
407 Workshop Tram Waggonfabrik Rastatt 1951, Renovated 1971 Former multi-purpose tram, decommissioned
407II Maintenance Klv53Cl Schöma 1982 Snowplow with diesel engine
411 Tipper truck DIEMA 1982
412 Tipper truck DIEMA 1982 Sold to Romania

Paintwork and advertisement

The wood-panelled side walls with Freiburg's coat of arms were typical features of the first trams in the city.

The general paintwork for all municipal trams in 1901 was yellow with brown side panels made of teak. Advertisement was strictly rejected since "the elegance of the tram" would suffer considerably.[88]

We do not deny the effectiveness of advertising on our trams, but we doubt that it will contribute to the increase in tourism, when posters are placed on the wage, with the recommendation of water, alcohol-free drinks, cigarettes etc."

Representative of the municipal tram network in a statement given in 1919

There was only a lull in the ban on advertising during the economic crisis of July 1919. Since them, internal commercial advertising was tentatively approved. In 1921, the city entered into a three-year contract with the Berlin Transport Propaganda GmbH.

After strong criticism from the citizens and the directorate of the trams, which advertised on the exterior as "speckled and striped monsters", the city took over the jurisdiction from 1925 and decided in 1927 to vote in interior tram advertisements, giving companies the opportunity to advertise on the inside of the trams and that the exterior should be left alone.

Wrap advertisement on a GT8N

As a result, another form of vehicle advertising was established in 1930.[88] Companies were able to hire out-of-the-way wagons in order to disguise them completely with advertising boards and ordered them to go through the city without passengers. The first customer of such a tram was the Sarrasani Circus. The National Socialists used these advertisements as a means of propaganda and labelled rail car 13 with the slogan "We're going to England!"[88]

Lord Mayor Wolfgang Hoffman introduced the advertising on side-mounted roof-mounted signs in 1949 and announced that he would finance an additional bus service every year.[88] The colour scheme was set in brown font with an ivory-coloured base tone. Since then, roof plates have been installed on all vehicle generations up the GT8N series and are still used today as an advertising platform.

GT8Z 243 was the first tram to be lacquered with the new design

In 1964, the full marketing rights for advertising were transferred to Schiffmann & Co GmbH, a sister company of the advertising centre Lloyd, which was the first time there was advertising on the body's exterior surface.

After the GT8Ks were procured in 1981, the company also introduced a red and white colour scheme, which replaced the cream-coloured design with green trim strips. The new varnishing was based on the colours of Freiburg's coat of arms. Gradually, the older vehicles were repainted.

On 26 March 1994, the first vehicles were equipped with wrap advertising and partly glued window surfaces for the start-up of the route towards Munzinger Straße.[88] Up to 25% of the window surface area could be allocated to advertising.[89]

The Combinos are predominantly painted in red. There are white stripes between the driver cabins above and below the windows for the Combino Basics, while the Combino Advanced models have a black stripe, with a white stripe over it and white doors.

In 2011, GT8N 225 was painted to give it a more modern look. Some characteristics of the new design are the light grey base and the red "VAG tail". The tram remained in one place and the painting was partly removed for a whole advertisement.

While the GT8Zs were being renovated, since October 2013, several trams of this series have been given a new paint finish, which is based on the paintwork seen on the Urbos. The basic colours of red and white were kept and supplemented by black stripes.

Internal furnishing

The first series of two-axle railcars from 1901 could transport 31 passengers. Inside the tram there were two wooden horizontal benches that could accommodate 16 people. The large side windows could be darkened with curtains. The lighting and handrails for standing passengers were attached to the tram deck. In 1903, three matching side cars were put into operation. In contrast to previous vehicles, a conversion into an open salon carriage was possible. For this purpose, the glass panes framed with bronze could be completely put into the parapet.

The next generation of trams, delivered in 1907 numbered 38–40, had cross-sections with leather covers in the 2+1 scheme. In addition, the new trailers were equipped with foldable arm rests and spring-loaded padding.

The multi-purpose trams, the Sputnik articulate trams, and the two-way GT4 were fitted with seats made from Durofol. In contrast, the used trams from Stuttgart were equipped with artificial leather seats.

The seating in the Sputniks, obtained in 1959, originally faced the direction of travel.

The first two GT8 series had seats made of plastic, while trams purchased since 1990 were equipped with fabric upholstery, which only includes the seat surface for the GT8N; the rear surfaces were padded.

Depots

Western Depot at VAG-Zentrum

West (VAG-Zentrum)

The western depot at Besançonallee was built in the 1970s. Initially, the 100,000 square metre site served exclusively as a depot for buses, but was taken over by the tram network. After the line between Bissierstraße and Haid opened in 1994, the western depot connected to the network. Today, all the workshops and administration conducted by the VAG are located at this site next to large storage areas for buses and trams. The depot, which used to offer space for 50 vehicles, had 17 new bays in 2015 to create additional capacities for the Urbos.[90]

South (Urachstraße/Lorettostraße)

The southern depot in Wiehre has existed since 1901 and was until 1994 one of the two regular depots for the network. It is located on Urachstraße close to the stop for Lorettostraße. The construction of the depot was not included in the building contract of the network, but was taken over the municipal building authority. The art nouveau buildings were expanded in 1907 and 1908 around a rear house and an intermediate building. The car hall, which was initially designed for 35 vehicles, was supplemented by a further storage hall, so that 77 vehicles could be stationed after it was converted.

After the second building opened at the northern depot, only five course cars and buses served the depot. After the new western depot was connecting to the network in 1994, the depot lost he last remaining regular scheduled services. At the present time, vehicles of the Freunde der Freiburger Straßenbahn are accommodated in the western and older part of the depot. The eastern hall now serves the local fire brigade.

North (Komturstraße)

Northern depot

As a result of the continuous expansion of the fleet due to greater usage, the southern depot reached its full capacity limit in the 1920s. For this reason, a new depot at Komturstraße began operation in 1928 with the opening of the section Rennweg-Komturplatz. The five-track hall offered space for 30 two-axle trams. From then on, a large proportion of new trams were delivered to the northern depot, since the depot was better connected to the road and rail network compared to the southern depot. The embankment to the railway station was also nearby. Moreover, with its two-sided driveway – unlike the depot at Urachstraße – it could accommodate equipment vehicles. On 15 April 1950, the second storage unit was put into operation, which could accommodate 48 additional two-axle vehicles.

After the western depot opened, the northern depot lost its importance. Until 2006, the GT8K was left in the storage rooms before the building was demolished in 2007 to allow for residential development of the site.[91]

Track storage (Kaiserstuhlstraße)

At the beginning of the 1920s, a track storage area was put into operation at Kaiserstuhlstraße near to the Güterbahnhof. This was connected to the network at Neulindenstraße which was built during the Second World War for lazaretto transportation. The company stationed work vehicles on site and kept a scrap yard where carriages were dismantled. In the 1980s, the yard was closed down and railway connections dismantled.[92]

Planning

Medium-term plans

Gundelfingen line

The route to Gundelfingen was part of the project "Stadtbahn to northern Freiburg's districts and Gundelfingen". The route was going to cross the Alte Bundestraße and run towards the terminus loop at Waldstraße.[93] At the same time, it was planned to move Gundelfingen S-Bahn station 100 m to the north, in order to link the tram to the S-Bahn.

In April 2014, representatives of the CDU and the Greens in Gundelfingen launched a cross-party public opinion poll about further development of the tramway.[94] An immediate extension was planned for a station up to Auf der Höhe to better connect the local senior centres and the centre of Gundelfingen.[95] In a referendum in Gundelfingen on November 12, 2023, 58% of voters rejected a resumption of planning with a turnout of 61%.[96][97]

Planned tram network after 2020

In the 2007 transport development plan, the following network was proposed after the opening of all routes planned in the medium term:[98]

Line Route
1 Laßbergstraße – Schwabentorbrücke – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Moosweiher
3 Gundelfingen Bahnhof – Gundelfinger Straße – Europaplatz – Bertoldsbrunnen – Hauptbahnhof – Runzmattenweg – Munzinger Straße
4 Dorfstraße – Bertoldsbrunnen – Hauptbahnhof – Robert-Koch-Straße – Hornusstraße
5 Dietenbach1 - Bollerstaudenstraße – Scherrerplatz – Bertoldsbrunnen – Europaplatz – Fahnenbergplatz – Robert-Koch-Straße – Messe Freiburg
7 Innsbrucker Straße – Heinrich-von-Stephan-Straße – Stadttheater – Fahnenbergplatz – Europaplatz – Hornusstraße

1Not part of the original plan, as planning for the new district of Dietenbach started after publication

Investigated measures

First construction stage, as well as stage 3 and 4 of the second construction stage as a way of connecting St. Georgen with Freiburg

Connection to St. Georgen

St. Georgen, with more than 10,000 inhabitants, is Freiburg's largest district without a tram connection. Originally it was planned to continue the route from Munzinger Straße to St. Georgen Church. Such an extension is still in demand,[99] but it was not included in the action plan until 2020.[100] The planning of the Transport Development Plan 2020 provides two connection stages.[101]

In the first construction stage, the route is to be extended from Munzinger Straße via St. Georgen Kirche to Langgasse. For the second stage, there are five route variants.[102]

  • Variant 1 (FNP-Route): St. Georgen Kirche – Obergasse – Andreas-Hofer-Straße - Vauban
  • Variant 2 (FNP-Route): St. Georgen Kirche – Hartkirchweg – Hüttweg - Vauban
  • Variant 3: St. Georgen Kirche – Hartkirchweg – Cardinalweg – Andreas-Hofer-Straße – Vauban
  • Variant 4: St. Georgen Kirche – Hartkirchweg – Am Mettweg – Guildfordallee – Pressehaus
  • Variant 5 (Branch line): St. Georgen Kirche – Cardinalweg

Other plans

In the long term, the following new routes have been or are being considered:

  • Connecting Bissierstraße and Elsässer Straße via Berliner Allee[103]
  • A route to Merzhausen from Paula-Modersohn-Platz[104]
  • A route to Hochdorf, either from Messe Freiburg or Moosweiher, Landwasser[105]

In older plans, there have also been considerations on new routes through Elsässer Straße (connecting Berliner Allee with Diakoniekrankenhaus), to Denzlingen (from Gundelfingen) and to Umkirch (from Bollerstaudenstraße, Rieselfeld; nowadays from Dietenbach, as soon as construction were to finish) via Mundenhof.[105]

Particular features

The tram network in Freiburg crosses three historic city gates. At the end of the 19th century, there were talks about demolishing the Schwabentor, but it was expanded instead. After World War II, it was returned to its original state. In the German-speaking area, there are only two other such gateways: the Nauener Tor in Potsdam's tram network and the Käfigturm in Bern's.

Since 1967, when the Lörrach tram network ceased its operations, the route to Günterstal was the southernmost tram route in Germany, until 2014 when Basel extended its network to Weil am Rhein.

The Stühlinger Bridge ("Stadtbahnbrücke") is the steepest section of Freiburg's tramway network. For this reason, the GT8s were equipped with all-wheel drive.

Further reading

  • Dietmar Gemander, Thomas Hettinger: Die Freiburger Straßenbahn. Die Zeit vor der Stadtbahn, EK-Verlag, Freiburg im Breisgau 2006, ISBN 3-88255-845-8.
  • Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg, Freiburger Verkehrs AG, Freiburg im Breisgau 2001, ISBN 3-00-008339-1.
  • Wolfdieter Batsch: Die Freiburger Stadtbahn: ein Jahrhundertwerk kurz vor seiner Verwirklichung, Freiburger Stadthefte, Band 24, Rombach, Freiburg im Breisgau 1977.
  • Norman Kampmann, Christian Wolf: Die Freiburger Straßenbahn heute. Mit der Freiburger Verkehrs AG durch die Breisgaumetropole, EK-Verlag, Freiburg im Breisgau 2012, ISBN 3-88255-499-1.
  • Joachim Scheck, Daniel Charhouli: STRABA: Freiburg auf Gleisen entdecken, Promo-Verlag, Freiburg im Breisgau 2014, ISBN 978-3-923288-78-6.

References

Notes

  1. 1 2 Manfred Gallo: Freiburg: Der „Hoobl" fährt seit 107 Jahren. Badische Zeitung, 3 November 2008, retrieved 21 March 2014.
  2. VAG Freiburg, .
  3. Tram-Info Freiburg, .
  4. Peter_Kalchthaler: Wo fuhr einst Freiburgs erster Omnibus? Badische Zeitung, 6 February 2012; retrieved, 13 June 2014.
  5. Viktor Kuntzemüller: Freiburgs Bächle einst und jetzt Archived 2015-06-29 at the Wayback Machine. In: Freiburger Almanach. 38, 1987.
  6. Freiburger Zeitung, Ausgabe 1 September 1901.
  7. Simone Höhl: Hochfrisur und Tiefenanalyse: Die Risse im Schwabentor sind noch immer ein Rätsel. Badische Zeitung, 30 January 2013, retrieved 13 June 2014.
  8. Dietmar Gemander, Thomas Hettinger: Die Freiburger Straßenbahn. Die Zeit vor der Stadtbahn. EK-Verlag, Freiburg 2006, ISBN 3-88255-845-8, S. 15: Erste Streckenerweiterungen.
  9. Freiburger Verkehrs AG: Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg. 2001, S. 19 (Betriebsbericht 1902: Einheitliche Tarife für die Straßenbahn).
  10. Gerhard Greß: Verkehrsknoten Freiburg und seine Umgebung in den fünfziger und sechziger Jahren. EK-Verlag, Freiburg 1997, ISBN 3-88255-263-8, S. 11.
  11. 100 Jahre Straßenbahn in Zähringen, auf nahverkehr-breisgau.de, retrieved 13 June 2014.
  12. 1 2 Dietmar Gemander, Thomas Hettinger: Die Freiburger Straßenbahn. Die Zeit vor der Stadtbahn. EK-Verlag, Freiburg 2006, ISBN 3-88255-845-8, S. 21–23: Planungen und Streckenerweiterungen zwischen 1910 und 1914.
  13. Freiburger Verkehrs AG: Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg. 2001, S. 36 (Betriebsbericht 1915: Einzug des Fahrpersonals und erstmalige Anstellung von Frauen).
  14. L. Werthmann (Hrsg.): Die Freiburger Lazarette im Völkerkrieg: 1914/15. Caristasverlag, Freiburg im Breisgau 1915, S. 152/153.
  15. Morgenausgabe, 13 October 1916.
  16. Freiburger Zeitung, Abendausgabe, 13 October 1916.
  17. Dietmar Gemander, Thomas Hettinger: Die Freiburger Straßenbahn. Die Zeit vor der Stadtbahn. EK-Verlag, Freiburg 2006, ISBN 3-88255-845-8, S. 27: Die Zeit nach dem Ersten Weltkrieg.
  18. Andreas Peikert: Seit 100 Jahren gehört Littenweiler zu Freiburg. Badische Zeitung, 8 January 2014, retrieved 13 June 2014.
  19. 1 2 Manfred Gallo: Das Gasthaus an den Gleisen. Badische Zeitung, 1 February 2010, retrieved 13 June 2014.
  20. Dietmar Gemander, Thomas Hettinger: Die Freiburger Straßenbahn. Die Zeit vor der Stadtbahn. EK-Verlag, Freiburg 2006, ISBN 3-88255-845-8, S. 33: Die 30er-Jahre.
  21. Freiburger Verkehrs AG: Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg. 2001, S. 77 (Betriebsbericht 1933: Tarifänderungen).
  22. Heiko Hauman, Dagmar Rübsam, Thomas Schnabel, Gerd R. Ueberschär: Hakenkreuz über dem Rathaus. Von der Auflösung der Weimarer Republik bis zum Ende des Zweiten Weltkrieges (1930–1945). In: Geschichte der Stadt Freiburg im Breisgau. Band 3, Theis, Stuttgart 1992, ISBN 3-8062-0857-3, S. 353 f.
  23. Dietmar Gemander, Thomas Hettinger: Die Freiburger Straßenbahn. Die Zeit vor der Stadtbahn. EK-Verlag, Freiburg 2006, ISBN 3-88255-845-8, S. 36–37: Der Obus-Verkehr.
  24. Freiburger Verkehrs AG: Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg. 2001, S. 83 (Betriebsbericht 1944/45: Schäden nach dem Bombenangriff am 27. November 1914).
  25. Städtische Straßenbahn Freiburg i. Br., Artikel für „Fahr Mit", 4 November 1953.
  26. Die Triebwagen des Typs Sputnik auf www.nahverkehr-breisgau.de
  27. Hans Sigmund: Freiburg Nord: Als die Tram zum Kirchplatz fuhr. Badische Zeitung, 22 March 2010, retrieved 7 February 2013.
  28. Wiehre-Journal Nummer 19 Archived 2014-03-12 at the Wayback Machine, November/December 2009.
  29. Stilllegungsdaten Freiburg im Breisgau, auf www.sufk-koeln.de, retrieved 13 June 2014.
  30. Wendeschleife Komturplatz verlegt, in der Rubrik Freiburg vor 50 Jahren der Badischen Zeitung, Ausgabe 4 May 2010, retrieved 13 June 2014.
  31. Greß, Gerhard (1997). Verkehrsknoten Freiburg und seine Umgebung in den fünfziger und sechziger Jahren. EK-Verlag, Freiburg. p. 49. ISBN 3-88255-263-8.
  32. Heiner Monheim, Rita Manheim-Dandörfer: Straßen für alle. Analysen und Konzepte für den Stadtverkehr der Zukunft. Rasch und Röhring, Hamburg 1990, ISBN 3-89136-368-0, S. 417.
  33. Freiburger Verkehrs AG: Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg. 2001, S. 165
  34. 1 2 3 Joachim Wille: Die Tempomacher – Freie Fahrt ins Chaos. C. H. Becksche Verlagsbuchhandlung, München 1988, ISBN 3-406-33026-6, S. 162–168.
  35. 1 2 Heiner Monheim, Rita Manheim-Dandörfer: Straßen für alle. Analysen und Konzepte für den Stadtverkehr der Zukunft. Rasch und Röhring, Hamburg 1990, ISBN 3-89136-368-0, S. 418.
  36. 15 Jahre RegioKarte Archived 2015-09-24 at the Wayback Machine, auf rvf.de, retrieved 13 June 2014.
  37. "Tramfans machen mächtig Dampf – badische-zeitung.de" (in German). Retrieved 2014-12-15.
  38. Wolfgang Plöger u.a.: Wir halten Freiburg in Bewegung seit 1901. Dokumentation des öffentlichen Personennahverkehrs der Stadt Freiburg i.Br. Broschüre der Freiburger Verkehrs AG, Freiburg i. Br. 1991.
  39. Amtsblatt Freiburg: Eröffnung Stadtbahn Haslach, retrieved 13 January 2014.
  40. VAG Freiburg: Eröffnungsfest Stadtbahn Vauban 4 April 2006, retrieved 17 January 2014.
  41. Amtsblatt Freiburg: Stadtbahn Vauban: Trasse zwischen Basler Straße und Vauban 9 October 2003, retrieved 17 January 2014.
  42. Amtsblatt 29 April 2006, Seite 4, retrieved 26 August 2014.
  43. Amtsblatt Freiburg: Umgestaltung der Habsburgerstraße, Sonderbeilage 5 November 2009, retrieved 13 June 2014.
  44. Stadt Freiburg: Sanierung und Umgestaltung Schwarzwaldstraße.
  45. Bahn frei für Linie 2 – Einweihung am Samstag, badische-zeitung.de, 12 March 2014, retrieved 26 August 2014.
  46. Simone Höhl: Wieder Weichenbruch am Bertoldsbrunnen – im Juni kommt die Generalsanierung. Badische Zeitung, 8 May 2014, retrieved 26 October 2014.
  47. Simone Höhl: Handarbeit in der Mösleschleife. Badische Zeitung, 21 June 2014, retrieved 26 October 2014.
  48. Joachim Röderer: Tram fährt rund um die Uhr. Badische Zeitung, 8 March 2014, retrieved 31 January 2016.
  49. Sina Gesell: Ein Jahr Nachtverkehr mit Bus und Bahn: Wie läuft's? Badische Zeitung, 3 December 2015, retrieved 31 January 2016.
  50. Uwe Mauch: Freiburg: Spatenstich für die 38 Millionen Euro teure Tramtrasse zum Messegelände. Badische Zeitung, 15 June 2013, retrieved 16 June 2013.
  51. Simone Höhl, Joachim Röderer: Premiere in Pink: Die Linie 4 rollt in den Freiburger Westen. Badische Zeitung, 12 December 2015, retrieved 22 December 2015.
  52. "Urban transport industry news round-up". Railway Gazette. 23 December 2020. Retrieved 24 December 2020.
  53. Badische Zeitung, 14 April 2019, retrieved 2 July 2022.
  54. Susanne (2023-06-06). "Alles neu macht die 2 - Stadtbahn Waldkircher Straße". VAG Blog (in German). Retrieved 2023-12-28.
  55. VAG: Zahlen & Fakten, Stand 2012, retrieved 13 June 2014.
  56. "Freiburg im Breisgau auf strassenbahn-online.de" (in German). Retrieved 2014-06-13.
  57. Michael Flösch, VAG-Betriebsleiter im Bereich „Instandhaltung Elektrischer Anlagen", Stand 16 July 2014.
  58. Simone Höhl (2016-12-27). "Freiburg: Korrektur: Lassbergstraße heißt jetzt Laßbergstraße" (in German). Badische Zeitung. Retrieved 2017-04-29.
  59. "Freiburg und Umgebung: Aus der Tram in Taxi und Bus: So funktioniert der Nachtverkehr – badische-zeitung.de" (in German). Retrieved 2014-12-14.
  60. "VAG safer traffic: Freiburger Verkehrs AG" (in German). Archived from the original on 2014-12-14. Retrieved 2014-12-14.
  61. Kursnummern auf tramtom.de, retrieved 13 June 2014.
  62. "Zum SC Freiburg auf www.vag-freiburg.de" (in German). Retrieved 2021-11-03.
  63. VAG Preisinformaton, retrieved 14 October 2016.
  64. Simone Lutz: Warum verkaufen Freiburger Straßenbahnfahrer keine Tickets mehr?, Badische Zeitung, 10 February 2016, retrieved 10 February 2016.
  65. Herderner Bürgerbrief, Oktober 2009 Archived 2014-02-25 at the Wayback Machine, retrieved 13 June 2014.
  66. Stadtbahn Haslach, auf zrf.de, retrieved 14 June 2014.
  67. VAG Freiburg: "Neuer Nachtverkehr", 21 December 2014, retrieved 13 November 2015.
  68. VAG Freiburg: , 13 December 2021, retrieved 22 January 2022.
  69. Wagenparkliste Ulm: Arbeitswagen, auf tram-info.de, retrieved 22 June 2014.
  70. Blickpunkt Straßenbahn Ausgabe 1/2017, S. 102.
  71. 1 2 3 4 5 6 Norman Kampmann, Christian Wolf: Die Freiburger Straßenbahn heute. Mit der Freiburger Verkehrs AG durch die Breisgaumetropole (Stadtverkehr-Bildarchiv, Band 2). EK-Verlag, Freiburg 2012, S. 10–13: Fahrzeuge für den Stadtbahnbetrieb.
  72. Nahverkehr Breisgau: "GT8 Einrichtungstriebwagen 3.Serie". Archived from the original on January 24, 2010. Retrieved 2014-06-22., retrieved 22 June 2014.
  73. Simone Höhl: "Renovierung: Die Verkehrs-AG modernisiert ihre größte Straßenbahnflotte". Badische Zeitung, 22 September 2013, retrieved 11 February 2013.
  74. Julia Dreier & Frank-Thomas Uhrig: "Straßenbahn bricht bei Unfall in Freiburg auseinander – 13 Verletzte im Krankenhaus". Badische Zeitung, 2 February 2023, retrieved 16 April 2023.
  75. Nahverkehr Breisgau: "Was geschah mit Wagen 272?". Archived from the original on June 12, 2010. Retrieved 2014-06-22., retrieved 22 June 2014.
  76. tenders electronic daily Lieferauftrag – 58336-2013, retrieved 13 June 2014.
  77. Rolf Müller: "VAG kauft Trams bei spanischem Hersteller". Badische Zeitung, 25 February 2013, retrieved 13 June 2014.
  78. 12 neue Stadtbahnwagen vom Typ „Urbos 100" für Freiburg at the Wayback Machine (archive index) , Freiburger Verkehrs AG, 15 March 2013.
  79. "Ankunft: Freiburgs neue Straßenbahnen: Der Urbos ist da – badische-zeitung.de" (in German). Retrieved 2015-03-18.
  80. "Freiburg: Premiere: VAG feiert Start des Urbos-Zeitalters – Jungfernfahrt durch Freiburg – badische-zeitung.de" (in German). Retrieved 2015-10-23.
  81. "Freiburg: Neue Strassenbahn: Der Urbos startet in Freiburg – BZ testet neue Tram – badische-zeitung.de" (in German). Retrieved 2015-07-16.
  82. Simone Höhl (2016-05-21). "Freiburg: Urbos haben sich etabliert – manchen sind sie jedoch zu eng" (in German). Badische Zeitung. Retrieved 2016-05-22.
  83. Simone Höhl (2017-02-28). "Freiburg: Die neuen Urbos-Straßenbahnen rollen an" (in German). Badische Zeitung. Retrieved 2017-03-01.
  84. Blickpunkt Straßenbahn Ausgabe 4/2017, S. 106.
  85. "VAG bestellt acht weitere Urbos 100". www.vag-freiburg.de (in German). 2021-05-28. Retrieved 2023-12-28.
  86. Informationen zur Oldtimerlinie 7, auf stadt-land-regiokarte.de, retrieved 13 June 2014.
  87. Nahverkehr Breisgau: "Arbeitswagen". Archived from the original on January 23, 2010. Retrieved 2014-03-07., retrieved 13 June 2014.
  88. 1 2 3 4 5 Freiburger Verkehrs AG: Mobile Stadt – Die Geschichte der Straßenbahn in Freiburg. 2001, S. 103 (Wie die Reklame ins Rollen kam).
  89. "Freiburg: Schiffmann Außenwerbung: Straßenbahnen in Freiburg sind seit fast 100 Jahren mobile Werbeflächen" (in German). Badische Zeitung. Retrieved 2016-01-12.
  90. Simone Höhl: "Freiburg: Die VAG baut die längste Garage der Stadt". Badische Zeitung, 8 June 2013, retrieved 23 February 2014.
  91. VAG Freiburg: "Betriebshof Nord wird verkauft". retrieved 13 June 2014.
  92. Nahverkehr Breisgau: "Verschrottungen". Archived from the original on January 23, 2010. Retrieved 2014-03-09..
  93. "Gundelfingen: Gundelfingen-Süd kann nur Zwischenlösung sein". Badische Zeitung, 17 February 2012, retrieved 12 January 2014.
  94. "Bündnis 90/Die Grünen: Bürgerbefragung zur Straßenbahn" (PDF). Archived from the original (PDF) on May 4, 2014. Retrieved 2014-05-04.
  95. Andrea Dreschner: "Gundelfingen: Straßenbahn bis zum ‚Ochsen'?". Badische Zeitung, 26 April 2014, retrieved 4 May 2014.
  96. "Ergebnis". wahlergebnisse.komm.one. Retrieved 2023-12-28.
  97. Zeitung, Badische (2023-11-12). "Bürgerentscheid: Mehrheit stimmt gegen eine Straßenbahn für Gundelfingen". Badische Zeitung (in German). Retrieved 2023-12-28.
  98. "Stadt Freiburg: Streckennetz Stadtbahn/Stadtbus Prognose 2020, Stand 18.12.2007" (PDF).
  99. Beteiligungshaushalt Freiburg: Wann bekommt St. Georgen endlich einen Straßenbahnanschluss? Archived 2014-02-02 at the Wayback Machine 15 January 2013, retrieved 18 January 2014.
  100. Unabhängiger Bürgerverein St. Georgen: "Stadtbahn St. Georgen in weite Ferne gerückt". Archived 2013-09-25 at the Wayback Machine 5 June 2010, retrieved 18 January 2014.
  101. Stadt Freiburg: "Verkehrsentwicklungsplan 2020: Untersuchte Maßnahmen im ÖPNV". S. 1–9, retrieved 4 November 2014.
  102. Stadt Freiburg: "Verkehrsentwicklungsplan 2020: Untersuchte Maßnahmen im ÖPNV (Bild)", retrieved 4 November 2014.
  103. "Stadt Freiburg: Verkehrsentwicklungsplan 2020: Untersuchte Maßnahmen im ÖPNV" (PDF).
  104. Zeitung, Badische (2011-10-20). "Stadtbahn ist noch Thema". Badische Zeitung (in German). Retrieved 2023-12-28.
  105. 1 2 "Stadt Freiburg: Maßnahmenübersicht ÖPNV" (PDF).

Bibliography

  • Gemander, Dietmar; Hettinger, Thomas (2006). Die Freiburger Straßenbahn [The Freiburg Tramway] (in German). Freiburg i. B., Germany: EK-Verlag. ISBN 3882558458.
  • Höltge, Dieter (1999). Straßen- und Stadtbahnen in Deutschland [Tramways and Stadtbahnen in Germany] (in German). Vol. Band 6: Baden [Volume 6: Baden]. Freiburg i. B., Germany: EK-Verlag. ISBN 3882553375.

Media related to Trams in Freiburg im Breisgau at Wikimedia Commons

47°59′42″N 07°50′59″E / 47.99500°N 7.84972°E / 47.99500; 7.84972

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.