Guiyang–Nanning high-speed railway 贵南高速铁路 | |
---|---|
Overview | |
Status | Operational (Guiyang–Libo section)[1] |
Locale | Guizhou and Guangxi, China |
Termini | |
Service | |
Services | 1 |
Operator(s) | China Railway Chengdu Group & China Railway Nanning Group |
History | |
Opened | 8 August 2023[1] |
Technical | |
Line length | 512 km (318 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The Guiyang–Nanning high-speed railway is a high-speed railway between Guiyang and Nanning in China. The railway will be 512 km (318 mi) in length, of which 482 km (300 mi) is newly build. Travel time between the two cities will be cut from 10 hours to 2.5 hours.[2] It will be part of the Baotou (Yinchuan)–Hainan corridor.
History
Construction on the railway began in 2018. The initial section from Guiyang to Libo opened on 8 August 2023.[1]
Route
Station Name[3] | Chinese | Transfers / Connections | Location | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Guiyang North | 贵阳北 | 1 | Guizhou | |||||||
Guiyang | 贵阳 | 1 | ||||||||
Longli North | 龙里北 | |||||||||
Guidingxian | 贵定县 | |||||||||
Duyun East | 都匀东 | |||||||||
Dushan East | 独山东 | |||||||||
Libo | 荔波 | |||||||||
Huanjiang | 环江 | |||||||||
Hechi West | 河池西 | Guangxi | ||||||||
Yong'anzhen | 永安镇 | |||||||||
Du'an | 都安 | |||||||||
Mashanxian | 马山县 | |||||||||
Nanning North | 南宁北 | |||||||||
Nanning East | 南宁东 | Nanning Metro: 1 |
References
- 1 2 3 "贵南高铁贵荔段8月8日开通运营 两地最快57分钟可达". 2023-08-07. Archived from the original on 2023-08-07.
- ↑ "Construction site of Guiyang-Nanning high-speed railway - People's Daily Online". en.people.cn. Retrieved 2020-06-22.
- ↑ "最新!贵南高铁贵州段已正式进入运行试验阶段". 2023-06-26. Archived from the original on 2023-08-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.