| Qianjiang–Changde railway | |
|---|---|
| Overview | |
| Status | Operational |
| Termini |
|
| Stations | 10 |
| Service | |
| Type | Higher-speed rail, Heavy rail |
| Operator(s) | China Railway Guangzhou Group |
| History | |
| Opened | 26 December 2019 |
| Technical | |
| Line length | 336 km (209 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 50 Hz 25,000 V |
| Operating speed | 200 km/h (124 mph)[1] |
The Qianjiang–Changde railway is an electrified higher-speed railway in China.
History
Testing began on 14 October 2019.[2] The railway opened on 26 December.[3]
Stations
The line has the following passenger stations:
- Qianjiang (interchange with the Chongqing–Huaihua railway, planned interchange with the Chongqing–Qianjiang intercity railway)
- Xianfeng
- Laifeng
- Longshan North
- Sangzhi
- Zhangjiajie West (planned interchange with the Zhangjiajie–Huaihua high-speed railway and Yichang–Zhangjiajie high-speed railway)
- Niuchehe
- Taoyuan
- Changde (interchange with the Shimen–Changsha railway)
References
- ↑ "黔张常铁路环评报告获国家环保部批复 - 湖南频道". hn.rednet.cn. 14 August 2014. Retrieved 13 October 2020.
- ↑ "黔张常铁路开启动车组检测-湖南省人民政府门户网站". www.hunan.gov.cn. 15 October 2019. Retrieved 13 October 2020.
- ↑ "黔张常铁路正式通车_图片新闻_中国政府网". www.gov.cn. 26 December 2019. Retrieved 13 October 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.