HSR Layout
Namma Metro station
Under Construction of HSR Layout metro station
General information
LocationAH45, Sector 6, Koramangala, Bengaluru, Karnataka 560034
Coordinates12°54′59″N 77°37′59″E / 12.91649°N 77.63304°E / 12.91649; 77.63304
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Blue Line
PlatformsSide platform (TBC)
Platform-1 → Central Silk Board
Platform-2 → Krishnarajapura / KIAL Terminals
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningJune 2026 (June 2026) (TBC)
Electrified(TBC)
Services
Preceding station Namma Metro Following station
Central Silk Board
Terminus
Blue Line
(Future Service)
Agara
Location

HSR Layout is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the main HSR Layout suburban area which divides into seven sectors consisting of main roads and cross roads inside the locality. This is a prime location for its neighbouring areas like Agara, Silk Board, Sarjapura and Madiwala. This metro station is slated to become operational around June 2026.[2][3][4][5]

Station layout

Station Layout - To Be Confirmed

HSR Layout track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Central Silk Board Change at the next station for Yellow Line
Platform #
Northbound
Towards ← Krishnarajapura / KIAL Terminals next station is Agara
Side platform | Doors will open on the left Disabled access
L2

Connections

Entry/Exit

See also

References

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. Retrieved 14 December 2023.