Abu Dhabi Crude Oil Pipeline
Habshan–Fujairah pipeline (right) with Saudi Arabia's East-West Crude Oil Pipeline (left)
Habshan–Fujairah pipeline (right) with Saudi Arabia's East-West Crude Oil Pipeline (left)
Location
CountryUnited Arab Emirates
ProvinceAbu Dhabi, Fujairah
General directionnorth–south
FromHabshan
Passes throughSweihan
ToFujairah
General information
Typeoil
OwnerInternational Petroleum Investment Company
ContractorsChina Petroleum Engineering and Construction Corporation
Sub-contractors: Techno Engineering Service Pvt Ltd
Construction started2008
Commissioned2012
Technical information
Length360 km (220 mi)
Maximum discharge1.5 million barrels per day (~7.5×10^7 t/a)
Diameter48 in (1,219 mm)
No. of pumping stations3
Pumping stationsHabsan, Sweihan, Fujairah

Habshan–Fujairah oil pipeline, also known as "Abu Dhabi Crude Oil Pipeline (ADCOP)", is an oil pipeline in the United Arab Emirates. It starts from the Habshan onshore field in Abu Dhabi and runs to Fujairah on the Gulf of Oman.

History

The pipeline was ordered by the International Petroleum Investment Company in order to increase the security of supply and reduce oil transportation through the Strait of Hormuz. The conceptual design of the pipeline was completed in 2006 by Tebodin, and the construction related contracts were awarded in 2007. EPC contract for the project was awarded to China Petroleum Engineering and Construction Corporation and China Petroleum Pipeline Bureau,[1][2][3][4] both subsidiaries of the China National Petroleum Corporation. Construction of the pipeline started on 19 March 2008.[1] It was completed in March 2011.[2] However, its commissioning was postponed several times[5] and it became operational in June 2012.[6] The pipeline was inaugurated on 15 July 2012 when it made its first delivery of Murban crude to Pak-Arab Refinery.[7]

Technical description

The 48-inch (1,200 mm) pipeline is 360 kilometres (220 mi) long, of which 14 kilometres (8.7 mi) is an offshore section. It passes east of Abu Dhabi city, through Sweihan and west of Al Ain.[8] The pipeline has a capacity of 1.5 million barrels per day (~7.5×10^7 t/a). It cost $3.3 billion.[3]

The pipeline is designated to supply the refinery in Fujairah as also the Fujairah export terminal.[8][9]

Contractors

The conceptual design of the pipeline was done by Tebodin Consultants & Engineers, while front-end engineering design was delivered by WorleyParsons. Penspen delivered detailed design and engineering, as also project and construction management assistance. The environmental impact assessment was carried out by URS Corporation, the topographical survey by Maps Geosystems, and the geotechnical survey by Fugro Middle East and the Arab Centre for Engineering Studies.[2] ILF Consulting Engineers were appointed as Project Management Consultants and EPC was carried out by China Petroleum Engineering and Construction Corporation.[1][2][3][4] Around 13 kilometres (8.1 mi) offshore pipelines was installed by Van Oord Offshore.[4]

Oil tanks at the Fujairah terminal were constructed by Italy's Belleli Energy.[10] The mooring system was provided by Bluewater Energy Services.[4] An integrated electrical system for the pipeline was designed and supplied by ABB.[10] Siemens together with 3W Networks designed and undertook the complete engineering, procurement and construction of the integrated control and safety systems and telecom scope.[11] Pipes were supplied by Sumitomo, Salzgitter AG and Jindal Saw.[12] The technical assurance, risk and safety, asset management, and industrial inspection were done by Germanischer Lloyd.[13] After commissioning Siemens is providing maintenance services for the automation, control and telecom systems.[14]

References

  1. 1 2 3 "Construction begins on Habshan-Fujairah pipeline". Emirates News Agency. Zawya. 2008-03-19. (subscription required). Retrieved 2010-01-23.
  2. 1 2 3 4 "Construction complete on Habshan – Fujairah oil pipeline". Pipeline International. March 2011. (subscription required). Retrieved 2011-12-29.
  3. 1 2 3 Mohan Kumar, Himendra (2008-06-08). "Fujairah poised to become oil export hub". Gulf News. Retrieved 2010-01-23.
  4. 1 2 3 4 "Abu Dhabi Crude Oil (Habshan-Fujairah) Pipeline Project, United Arab Emirates". Hydrocarbons Technology. Net Resources International. Retrieved 2012-11-25.
  5. Cochrane, Paul (2012-03-03). "Cashing in on conflict". Executive. Archived from the original on 2012-03-10. Retrieved 2012-03-26.
  6. Shehab Al Makahle (2012-06-21). "Habshan-Fujairah pipeline starts pumping crude oil". Gulf News. Retrieved 2012-06-28.
  7. Osgood, Patrick (2012-07-15). "Abu Dhabi – Fujairah crude pipeline inaugurated". Arabian Oil & Gas. Retrieved 2012-07-16.
  8. 1 2 Nadim Kawach (2008-07-08). "Habshan oil pipeline to finish ahead of schedule". Emirates Business 24/7. Zawya. Retrieved 2010-01-23.
  9. Nadim Kawach (2008-09-24). "Ipic Fujairah pipeline to ensure reliable exports". Emirates Business 24/7. Zawya. (subscription required). Retrieved 2010-01-23.
  10. 1 2 "ABB bags UAE pipe work". Upstream Online. NHST Media Group. 2009-11-04. Retrieved 2010-01-23.
  11. "3W Networks wins telecom scope of Abu Dhabi Crude Oil Pipeline (ADCOP) Project" (Press release). 3W Networks. 2009-10-08. Archived from the original on 2013-12-27. Retrieved 2012-11-25.
  12. "Sumitomo, Salzgitter, Jindal win UAE pipeline deal". Reuters. 2008-01-02. Retrieved 2008-01-02.
  13. "GL pipes up in Abu Dhabi". Upstream Online. NHST Media Group. 2009-05-27. Retrieved 2010-01-23.
  14. "Siemens signs maintenance contract for Habshan-Fujairah oil pipeline automation system". AME Info. 2012-11-11. Archived from the original on 2012-11-14. Retrieved 2012-11-25.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.