Hull–Chelsea–Wakefield Railway
Wakefield Steam Train, Autumn 2010
LocaleBetween Hull and Wakefield
ConnectionsQuebec Gatineau Railway
Commercial operations
Built byOttawa and Gatineau Valley Railroad Company,
Ottawa & Gatineau Railway Company and Ottawa Northern & Western
between Hull and Maniwaki and leased to Canadian Pacific Railway in 1902[1][2]
Original gauge4 ft 8+12 in (1,435 mm) standard gauge
Preserved operations
Owned byTrack owned by the Chemin de fer de l'Outaouais, since 2008[2]
Operated byHull–Chelsea–Wakefield Railway
Reporting markHCW (Not Official)
Stations3
Length33 km (20.5 mi)
Preserved gauge1,435 mm (4 ft 8+12 in)
Commercial history
OpenedIn stages between 1891 & 1904[1][2]
ClosedAbandoned from Wakefield to Maniwaki in 1986[1] and closed in 1992[2]
Preserved era1992 - 2011
Preservation history
1992The Hull–Chelsea–Wakefield Railway takes over[2]
2008The Chemin de fer de l'Outaouais takes over the ownership of the track[2]
June 2011Track washed out/Train ceased operation[2]
July thru
December 2011
Equipment put up for sale / sold
[2][3][4][5][6]

The Hull–Chelsea–Wakefield Railway was a 33 km (20.5 mi) heritage railway in Quebec, Canada, running tourist trains through the scenic Gatineau Hills and beside the Gatineau River between Hull (part of the city of Gatineau) and the tourist town of Wakefield (part of La Pêche municipality) from May to October, using a 1907 Swedish steam locomotive, E2 class number 909,[7] and 1940s-built Swedish passenger cars. On average, the railway attracted about 50 000 tourists and generated revenues of about $8 million for the region.

The line was closed by a 2011 track bed washout and as of 2022 has not re-opened. Cost to repair is estimated above $5 million.

History

The Hull–Chelsea–Wakefield Railway ran on a track that was originally a Canadian Pacific Railway branch line that at one time extended beyond Wakefield to Maniwaki.[1][8] As of 2008 the track is owned by the Chemin de fer de l'Outaouais.

The railway line had been plagued in recent years with repeated damage to the track bed caused by severe storms. Some sections of the track run through steep terrain and along the bank of the Gatineau River, making it susceptible to such washouts. In 2007, a disagreement erupted between the owner of the steam train line and the municipality of Chelsea and city of Gatineau over the railway safety and maintenance. In July, a rain storm caused damage to some parts of the railway. The owner of the steam train mentioned that without funding from the cities, he would have to cease the operations of the line and sell the steam train. In November, an agreement was made when the province of Quebec and the municipalities involved provided funding for studies into future improvements to the railway. There were also plans for refurbishing the wagons as well as adding a station at the Casino du Lac-Leamy about 2 kilometres (1.2 mi) south of its current southern terminus at Quebec Autoroute 5 and Boulevard Saint-Joseph.[9]

However, following a landslide in Chelsea during the spring of 2008, the railway was halted after two weekends of activity. The owner decided to sell the train and ceased activities.[10] The railway did not run for the summer of 2008.

Although operations resumed for 2009 and 2010, and various upgrades were considered,[11] a notice on the official website currently states that they have been suspended again after heavy rains damaged the tracks during a storm that occurred on June 23 and 24, 2011. The train was once again put up for sale.[3][4]

Turntable of the Hull-Chelsea-Wakefield railroad.

Return

The train is now owned by the Chemin de fer de l'Outaouais.[5][6] An attempt to obtain $5 million in provincial funding for track repair[12] was rejected in January 2014.[13][14][15] As of 2014 CCFO is continuing to seek private or governmental backing by August 2014 for a possible relaunch no earlier than 2015,[16] although the vulnerability of the right-of-way to future washouts remains an undetermined risk.

In 2016, a consortium, Moose Rail,[17] proposed Wakefield as a stop[18] for a new privately run Ottawa-Gatineau commuter train service.

In July 2017 the municipality of Chelsea, Quebec pulled up 20 km (12 mi) of the track, seemingly ending any hopes of reopening the line.[19]

One rail car and the locomotive were sold, the rest have been scrapped and chopped up as of 2019.[20] Thus ended the service for ever.

See also

References

  1. 1 2 3 4 "UP THE LINE: THE RAILWAY FROM HULL TO MANIWAKI | Outaouais Heritage WebMagazine". outaouais.quebecheritageweb.com.
  2. 1 2 3 4 5 6 7 8 9 Significant dates Archived 2005-12-17 at the Wayback Machine
  3. 1 2 "Wakefield Steam Train put up for sale". 2011-07-15. Archived from the original on 2011-07-18. Retrieved 2011-08-23.
  4. 1 2 "Operating Steam Train NEW". Archived from the original on 2011-09-27. Retrieved 2011-08-23.
  5. 1 2 "CCFO offer". Archived from the original on 2016-03-04. Retrieved 2012-02-11.
  6. 1 2 "Wakefield, Quebec steam train saved". Archived from the original on 2013-07-05. Retrieved 2012-02-11.
  7. Karlsson, Lars Olov (2008). SJ:s ånglok (in Swedish). Malmö: Frank Stenvalls Förlag. p. 20. ISBN 978-91-7266-171-4.
  8. "Gatineau River Valley, CP Railway / Vallée de la rivière Gatineau, CP (1915) | Outaouais Heritage WebMagazine". outaouais.quebecheritageweb.com.
  9. Roman Zakaluzny (2007-11-21). "Quebec steam train to keep chugging". Ottawa Business Journal. Archived from the original on 2012-03-19. Retrieved 2011-08-23.
  10. "Wakefield Steam Train for sale". 2008-05-23. Archived from the original on 2012-03-19. Retrieved 2011-08-23.
  11. "Chelsea businesses asked to consider new steam train station". 2009-12-14. Archived from the original on 2010-07-26. Retrieved 2011-08-23.
  12. Vaste offensive pour sauver le p'tit train - Le Droit, Mathieu Bélanger, 24/05/13, archived at
  13. http://metronews.ca/news/ottawa/927029/is-this-the-end-of-the-line-for-wakefield-steam-train/
  14. "Berita Kereta Api di Dunia Saat Ini - Steamtrainfriends". 18 February 2021.
  15. "The little engine that couldn't | Lowdown Online". www.lowdownonline.com. Archived from the original on 2014-03-16.
  16. "New plan to bring back Outaouais steam train | CBC News".
  17. 1 2 "home". Moose Consortium Inc.
  18. "Maps".
  19. "Chelsea pulls out the last spike from Wakefield Steam Train". Ottawacitizen.
  20. Deachman, Bruce. "Sad sight as Wakefield steam train is dismantled | SaltWire". www.saltwire.com.

45°32′17″N 75°48′28″W / 45.5381°N 75.8077°W / 45.5381; -75.8077

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.