Biman Bandar
Kolkata Metro station
General information
LocationNetaji Subhash Chandra Bose International Airport, Kolkata
Coordinates22°38′46″N 88°26′09″E / 22.64619°N 88.43591°E / 22.64619; 88.43591
Owned byMetro Railway, Kolkata
Line(s)Yellow Line Orange Line
Platforms1 Side platforms & 2 island platforms
Tracks4 (2 more track lead to the yard)
Construction
Structure typeUnderground
Depth12 m
ParkingYes
AccessibleYes Disabled access
Other information
StatusUnder Construction
History
Opening2024 (expected)
Services
Preceding station The logo of the Kolkata Metro. Kolkata Metro Following station
VIP Road
towards Kavi Subhash
Orange Line
(under construction)
Terminus
Jessore Road
towards Noapara
Yellow Line
(under construction)
Birati
towards Barasat
Location

Biman Bandar is a metro station of Kolkata Metro (unofficially known as Airport metro station). It will serve the city's main airport, the Netaji Subhas Chandra Bose International Airport.[1]

Features

This station will also have a yard, and it will be the largest underground facility of India, and city's first. It will be 550m long and 41.6m wide, and will facilitate stabling and reversal of rakes, but it will not be a carshed.[2] Previously the station was planned elevated, but after objection from AAI, the route was reworked and the station was planned underground from Airport to New Barrackpore.[3]

Facilities

It will be 500 m away from the current terminal building and 150 m from the proposed new terminal building but it will be connected via subways which will be having walkalators, then there will be escalator or elevator to reach the arrival or the departure levels. Counters for luggage check-in could be set up at the station and there might be a dedicated corridor for transporting the luggage to the boarding point. Also a longer corridor would be built for passengers to reach Jessore Road.[4][1]

Intersections

Here, Kolkata Metro Line 4 and Line 6 will meet. There will be 6 tracks, two for Line 4, two for Line 6, one for terminating and departing both Noapara and Barasat bound trains and one for the yard.

History

Construction

The execution of this project has been entrusted to RVNL and the construction of the station-cum-yard is being done by ITD Cementation India Ltd. The tentative deadline is December 2021.[5]

Delays

The work has been delayed for years due to multiple issues. At first AAI objected the station above the ground, stating that this could be a threat for air traffic. Many underground utilities, power sub-station and water treatment plant had to be shifted. Encroachments and Land acquisition problems held up the project for multiple times.[6][7]

The Station

Layout

Connections

Rail

Previously Eastern Railway operated Suburban Railway services (Kolkata Circular Railway) up to here. Currently the nearest stations are Dum Dum Cantonment railway station and Dum Dum Junction railway station.

Air

The metro station itself is in the Netaji Subhash Chandra Bose International Airport area.[6][8]

See also

References

  1. 1 2 "Metro hub 150m from Calcutta airport". www.telegraphindia.com. Retrieved 15 May 2020.
  2. "Airport Metro yard to be country's largest underground facility". Times of India. Retrieved 20 July 2019.
  3. "বিমানবন্দর- নিউ ব্যারাকপুর মেট্রো ছুটবে মাটির নীচ দিয়ে, প্রকল্প নিয়ে কাটল জট". Asianet News. Retrieved 20 July 2019.
  4. "Metro hub 150m from Calcutta airport". architecutrupdate.in. Retrieved 20 July 2019.
  5. "Times of India". timesofindia.com. Archived from the original on 11 December 2020. Retrieved 15 March 2021.
  6. 1 2 "Work gets going on Metro's airport station".
  7. Gupta, Jayanta (15 February 2017). "New Garia: Metro terminal station plan at New Garia back on track". The Times of India. Retrieved 24 July 2019.
  8. "Metro link to airport on railway radar". www.telegraphindia.com. Retrieved 24 July 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.