Jinkeng

金坑
Platform 2
Chinese name
Simplified Chinese金坑站
Traditional Chinese金坑站
Transcriptions
General information
LocationGuangshan Highway, Huangpu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 21
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeElevated
AccessibleYes
Other information
Station code21 12
History
Opened20 December 2019
Services
Preceding station Guangzhou Metro Following station
Changping
towards Yuancun
Line 21 Zhenlongxi

Jinkeng station (Chinese: 金坑站), is a station of Line 21 of the Guangzhou Metro. It started operations on 20 December 2019.[1]

On 17 December 2019, Jinkeng Station was awarded the "Three-star Green Building Design Mark Certificate" by the Department of Housing and Urban-Rural Development of Guangdong Province, reaching the highest level in China's green building evaluation standards and becoming the first city rail transit line in mainland China to have a station that has obtained this certificate.[2]

The station has 2 elevated island platforms, numbered 1 & 2 on the inside, and 3 & 4 on the outside. Trains usually stop at the middle 2 platforms (platforms 1 and 2), with the express trains also passing through the middle tracks.

Exits

There are 2 exits, lettered A and B. Both exits are accessible and are located on Guangshan Highway.

References

  1. "二十一号线真的官宣来啦!". 19 December 2019.
  2. "国内首个绿色建筑三星认证地铁站落户广州地铁二十一号线". Yangcheng Evening News. 2019-12-17.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.