Kazarman hydropower cascade
Kazarman hydropower cascade is located in Kyrgyzstan
Kazarman hydropower cascade
Approximate location in Kyrgyzstan
CountryKyrgyzstan
LocationJalal-Abad Region
Coordinates41°35′N 73°56′E / 41.583°N 73.933°E / 41.583; 73.933
StatusProposed
Dam and spillways
ImpoundsNaryn
Power Station
Installed capacity1160 MW

The Kazarman hydropower cascade (Russian: Казарманский каскад ГЭС) is a future hydropower project near Kazarman in Jalal-Abad Region, Kyrgyzstan. When completed, it will consist of 4 hydropower plants on the river Naryn: Ala-Buga, Kara-Bulung-1, Kara-Bulung-2 and Toguz-Toro, with a total installed capacity of 1160 MW.[1][2][3]

References

  1. National Energy Holding (2020). "Promising investment projects in the energy sector" (PDF) (in Russian).
  2. State Committee for Industry, Energy and Subsoil Usage of the Kyrgyz Republic (2019). "Hydropower of the Kyrgyz Republic" (PDF) (in Russian).
  3. "CMD projects in the Kyrgyz Republic. Hydropower" (PDF). 2011.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.