| Line 9 | |
|---|---|
|  | |
| Overview | |
| Status | Under Construction | 
| Owner | Changchun | 
| Locale | Changchun, Jilin, China | 
| Termini | 
 | 
| Stations | 12 | 
| Service | |
| Type | Rapid transit | 
| System | Changchun Rail Transit | 
| Services | 1 | 
| Operator(s) | Changchun Rail Transit Corporation | 
| History | |
| Completed | 2025 | 
| Technical | |
| Line length | 28 km (17.40 mi)[1] | 
| Number of tracks | 2 | 
| Character | 16km Underground, 12km Elevated | 
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | 
Line 9 of the Changchun Rail Transit (Chinese: 长春轨道交通九号线; pinyin: Zhǎngchūn guǐdào jiāotōng jiǔ hào xiàn) is a rapid transit line running from Zhaojiagang East to North Zhongchuan Street including a stop called Changchun Longjia Airport Station.[2] It is under construction and planned to open in 2025.[1]
History
Phase 1
Plans to open by 2025 from Zhaojiagang East to Jiutai South Railway Station including Changchun Longjia Airport Station.[1]
References
- 1 2 3 长春轨道交通9号线一期工程正式开建,计划2025年年底通车!. 搜狐 (in Chinese). 2021-04-02. Archived from the original on 2021-08-12. Retrieved 2021-08-12.
- ↑ "Changchun Subway Line 9". TravelChinaGuide.com.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.



