Line S2
 S2 
Overview
Other name(s)Nanjing-Ma'anshan intercity railway
StatusUnder construction
Termini
Stations20
Service
TypeRapid Transit
Operator(s)Nanjing Metro
Technical
Line length65.2 km (40.5 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed120 kilometres per hour (75 mph)

Line S2 (Chinese: 南京地铁S2号线; pinyin: Nánjīng Dìtiě S-Èr Hào Xiàn) is a suburban rapid transit line in the Nanjing Metro system which is currently under construction. The initial phase is expected to open in 2027.[1] The line will have passing loops for express and local services with express trains completing travel across the whole line in 30 minutes.[2]

History

Construction on the first phase, an elevated line from Cihu to Dangtu South, started on 30 December 2020.[3]

Opening timetable

SegmentCommencementLengthStation(s)Name
Cihu — Dangtu South Under construction 27.5 km (17.09 mi) 8 Ma'anshan section

Station list

Station name Connections
English Chinese
Zhonghuamen 中华门  1   8   17 
Fengtainanlu 凤台南路  17 
Xiaohang 小行  10 
Youfangqiao 油坊桥  2   S3 
Xishanqiao 西善桥  7 
Banqiao North 板桥北
Banqiao 板桥  9 
Lüzhounanlu 绿洲南路  9 
Banqiao South 板桥南  16 
Jiangning 江宁
Xianfenglu 翔凤路
Tongning 铜井
Cihu 慈湖
Hubeilu 湖北路
Hunanlu 湖南路
Yushanlu 雨山路
Jiuhualu 九华路
Caishihe 采石河
Dangtu East 当涂东 Dangtu East railway station
Dangtu South 当涂

References

  1. 网易 (2020-12-30). "刚刚宁马城际马鞍山段正式开工,我在现场见证历史性一刻". www.163.com. Retrieved 2021-01-04.
  2. "宁马城际铁路全线工程建设动员_马鞍山_交通中心_快车". www.sohu.com. Retrieved 2022-04-26.
  3. "宁马城际铁路(马鞍山段)开工-新华网". www.ah.xinhuanet.com. Retrieved 2021-01-04.




    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.