Line 2
 2 
Overview
Other name(s)M2 (FS 2011 plan name)
South-West line (Chinese: 西南线)
StatusIn operation
OwnerCity of Foshan
LocaleGuangzhou (Panyu district) and Foshan (Nanhai, Shunde and Chancheng districts)
Guangdong
Termini
Stations17
Service
TypeRapid transit
SystemFoshan Metro (FMetro)
Services1
Operator(s)Foshan Rail Transit Group
History
Opened28 December 2021 (2021-12-28)[1]
Technical
Line length32.4 km (20.1 mi)[1]
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed90 km/h (56 mph)
Route map

Nanzhuang
Huchong Stabling Yard
Huchong
Lvdao Lake
 4  to Beijiang Dadao UpperRight arrow
Dongping Stream
Connection to Line 4
Zhihui Xincheng
 4 
Zhangcha
 4 
Guangfo circular IR
 4  to Gangkou Lu LowerRight arrow
Shiwan
Shagang
Kuiqi Lu
Shiliang
Wanhua
 3 
 3 
Left arrow to Shunde College Railway Station
to Zhen'an Right arrow
/Connection to Line 3
Dongping Stream
Dengzhou
Flower World
Xianchong
Shizhou
Linyue Depot
/ TNH1  to Leigang Right arrow
Linyue Xi
 TNH1 
Connection to Line 11
Linyue Dong
 11  TNH1  Linyuedong)
Foshan
Guangzhou
Chengchun Stream
Dazhou Stabling Yard (Line 2)/Dazhou Depot (Line 7)
Guangzhou Metro  22  to Chentougang Up arrow
Guangzhou South Railway Station
Guangzhou Metro  2   7   22  China Railway
Guangzhou Metro  2  to Jiahewanggang Right arrow
Guangfo circular IR Foguan IR
Guangzhou Metro  22  to Panyu Square Down arrow

Line 2 of Foshan Metro (FMetro) (Chinese: 佛山地铁2号线; pinyin: Fóshān Dìtiě Èr Hào Xiàn) is a metro line in Foshan. It runs in a south-west direction, connecting Guangzhou South Railway Station and Nanzhuang. It opened on 28 December 2021.[1]

Map of Line 2 drawn to scale.

Stations

Station
[lower-alpha 1]
Station name Connections Location
English Chinese
F2 11 Nanzhuang 南庄 Chancheng Foshan
F2 12 Huchong 湖涌
F2 13 Lvdao Lake 绿岛湖
F2 14 Zhihui Xincheng 智慧新城  4 
F2 15 Zhangcha 张槎  4 
F2 16 Shiwan 石湾
F2 17 Shagang 沙岗
F2 18 Kuiqi Lu 魁奇路  Guangfo 
F2 19 Shiliang 石梁
F2 20 Wanhua 湾华  3 
F2 21 Dengzhou 登洲 Shunde
F2 22 Flower World 花卉世界
F2 23 Xianchong 仙涌
F2 24 Shizhou 石洲
F2 25 Linyue Xi 林岳西  TNH1  Nanhai
F2 26 Linyue Dong 林岳东  TNH1 [lower-alpha 2]
 11 
F2 27 Guangzhou South Railway Station 广州南站 Guangzhou Metro  2   7   22 [lower-alpha 3]
Guangzhou South railway station IZQ
Panyu Guangzhou

Notes

  1. Stations 1-10 are on Phase 2, which is currently under planning.
  2. According to the official map, the station is currently regarded as a non-interchange station.
  3. All require out-of-system interchange.

References

  1. 1 2 3 "定了!佛山地铁2号线12月28日开通运营!".
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.