Lusail Tram | |
---|---|
Overview | |
Owner | Qatar Rail |
Locale | Lusail, Qatar |
Transit type | Light rail |
Number of lines | 1 (operational) 3 (under construction)[1] |
Number of stations | 7 (operational) 18 (under construction)[1] |
Website | Qatar Rail |
Operation | |
Began operation | 1 January 2022 |
Operator(s) | RKH Qitarat (Hamad/Keolis-RATP Dev)[2] |
Number of vehicles | 35 Alstom Citadis |
Technical | |
System length | 5.5 km (3.4 mi) (operational) 25 km (16 mi) (total)[3] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
The Lusail Tram (Arabic: ترام لوسيل), formerly Lusail LRT, is a light rail network in the Lusail urban development project north of Doha, the capital of Qatar. The first phase of the system, a six-station stretch of the Orange Line, opened to the public with "preview service" on 1 January 2022.[3] More stations will be gradually opened to the public, starting with Lusail Central station from 9 April 2022.[4]
The Lusail Tram will be operated and maintained for a duration of 20 years by RKH Qitarat, a joint venture formed by Hamad Group (51%) and French transit operators Keolis and RATP Dev (49%), on behalf of system owner Qatar Rail.[2][5] It uses a fleet of 35 Alstom Citadis trams.[6][7]
Lines
Purple Line
The Purple Line will have the following stations:
- Lusail is connected with Lusail metro station
- Grand Masjed
- Boulevard
- Crescent Junction is connected with Turquoise Line, Orange Line
- Lusail Towers is connected with Pink Line.
Pink Line
The Pink Line will have the following stations:
- Leqtaifya is connected with Leqtaifiya metro station ,
- Marina is connected with Orange Line
- Marina Mall is connected with Orange Line
- Yacht Club is connected with Orange Line
- Esplande is connected with Orange Line
- Lusail Central is connected with Orange Line
- Entertainment City
- Broadwalk
- Al Seef
- Lusail Towers is connected with Orange Line
- Seef Promenade
Orange Line
The Orange Line shares tracks with the Pink Line between Legtaifiya and Lusail Central before branching west. At Al-Wadi, it begins a unidirectional, counterclockwise loop, sharing tracks with the Turquoise Line, before returning to Al-Wadi and back to Legtaifiya.[8] It has the following stations:
Station name | Transfers | Opening date | |||||||
---|---|---|---|---|---|---|---|---|---|
English | Arabic | ||||||||
Legtaifiya | لقطيفية | 1 January 2022[9] | |||||||
Marina | مارينا | 1 January 2022[9] | |||||||
Marina Promenade | وشارع المارينا | 1 January 2022[9] | |||||||
Yacht Club | ونادي اليخوت | 1 January 2022[9] | |||||||
Esplanade | واسلبيناد | 1 January 2022[9] | |||||||
Lusail Central | وسط لوسيل | 9 April 2022[4] | |||||||
Energy City South | ومدينة الطاقة جنوب | 1 January 2022[9] |
Under construction
- Al Wadi
- South Fox Hills is connected with Turquoise Line
- Cresecent Junction is connected with Turquoise Line and Purple Line
- North Fox Hills is connected with Turquoise Line
- Downtown is connected with Turquoise Line
- Fox Hills Park is connected with Turquoise Line
- Al Manazel is connected with Turquoise Line
- Al Erkyah is connected with Turquoise Line
- 2022 is connected with Turquoise Line
- Energy City North is connected with Turquoise Line
Turquoise Line
The Turquoise Line will have the following stations:
- Al Manazel is connected with Orange Line
- Al Erkyah is connected with Orange Line
- 2022 is connected with Orange Line
- Energy City North is connected with Orange Line
- South Fox Hills is connected with Orange Line
- Cresecent Junction is connected with Orange Line, Purple Line
- North Fox Hills is connected with Orange Line
- Downtown is connected with Orange Line
- Fox Hills Park is connected with Orange Line
- Al Manazel is connected with Orange Line
References
- 1 2 "Lusail Tram". Retrieved 2017-10-30.
- 1 2 (in French) "Victoire pour Keolis et RATP Dev au Qatar". 7 December 2017. Retrieved 11 January 2018.
- 1 2 "Lusail Tram preview service begins; Legtaifiya station connects it with Doha Metro". January 2022.
- 1 2 "Lusail Central Station to open for public from tomorrow". thepeninsulaqatar.com. 2022-04-08. Retrieved 2022-05-07.
- ↑ Lusail light rail project management contract awarded Metro Report International 16 May 2016
- ↑ Lusail tram contract signed Metro Report International 24 June 2014
- ↑ Alstom rolls out first Citadis for Lusail LRT International Railway Journal 31 January 2018
- ↑ https://www.qr.com.qa/metro-tram?code=AboutMetroAndTram
- 1 2 3 4 5 6 https://www.qr.com.qa/whats-on/promotion-details?promotionId=143