Mir EO-3
Mission typeMir expedition
Mission duration365.94 days[1] (launch to landing)
Expedition
Space stationMir
Began21 December 1987 (1987-12-21)
Ended21 December 1988, 02:32:54 (1988-12-21UTC02:32:55Z) UTC
Arrived aboardSoyuz TM-4
Polyakov: Soyuz TM-6
Departed aboardSoyuz TM-6
Polyakov: Soyuz TM-7
Crew
Crew sizeTwo
MembersVladimir Titov
Musa Manarov
Valeri Polyakov*
* - Transferred to EO-4
Long-term Mir expeditions
 

Mir EO-3 (also called Mir Principal Expedition 3[2]) was an expedition to the space station Mir. The crew consisted of 3 people, Musa Manarov (Commander), Vladimir Titov (Flight Engineer) and Valeri Polyakov (Research Doctor). Manarov and Titov arrived at the station in December 1987 on Soyuz TM-4, while Polyakov arrived much later, in August 1988 on Soyuz TM-6. After the arrival of Polyakov, medical experiments became more intensive.

Crew

Upon docking to Mir; Titov and Manarov became the third resident crew. Both performed three EVAs. Polyakov joined the crew later separately.

PositionNameSpaceflightLaunchLandingDurationNotes
Commander Soviet Union Vladimir Titov Third 21 December 1987
Soyuz TM-4
21 December 1988
Soyuz TM-6
366 days Record spaceflight
duration
Flight Engineer Soviet Union Musa Manarov First
Research Doctor Soviet Union Valeri Polyakov First 29 August 1988
TM-6
27 April 1989
TM-7
241 days Transferred to Mir EO-4

Backup Crew

Mission Highlights

In the first week of the mission they performed biological experiments (with onions and fishes for example) and installed the Aynur biological crystal growth apparatus, which they had delivered to the station, into Kvant-1. Titov and Manarov conducted part of an ongoing survey of galaxies and star groups in the ultraviolet part of the spectrum using the Glazar telescope on Kvant. The survey required photography with exposure times of up to 8 minutes. Other work included Earth observation and experiments on the fields of materials sciences, meteorology, space technology, physiology, psychology, medical sciences and astronomical research, using the Marija-research apparatus. In total the crew performed over 2000 experiments.

Mir EP-2

In June 1988, the spacecraft Soyuz TM-5 arrived at the station carrying the three-person visiting crew of Mir EP-2. The crew consisted of two Soviets, Commander Solovyev and Flight Engineer Savinykh, as well as the Bulgarian research cosmonaut Aleksandr Aleksandrov (not to be confused with Soviet cosmonaut Aleksandr Aleksandrov, who was part of the long-duration Mir EO-2 crew).

Aleksandrov was the second Bulgarian to fly in space, the first being Georgi Ivanov, who flew on Soyuz 33 but failed to reach Salyut 6 after an engine failure aborted his mission.[3] As a result, Bulgaria was the last Eastern European Soviet ally to not have one of its citizens visit a Soviet space station.[2] Aleksandrov became the first Bulgarian to visit a space station. During his visit, Aleksandrov used nearly 2,000 kg of equipment delivered by Progress spacecraft to conduct 46 experiments in the Shipka program.

The visiting EP-2 crew returned to Earth about a week later in the spacecraft Soyuz TM-4, leaving TM-5 as the station's lifeboat.[4]

Polyakov arrives

On 31 August 1988, the spacecraft Soyuz TM-6 arrived at the station, carrying the new EO-3 crew member Valeri Polyakov. Also on TM-6 was the two-person crew of the visiting expedition Mir EP-3, consisting of the commander Vladimir Lyakhov, as well as the first Afghan cosmonaut Abdul Ahad Mohmand.

After about a week on the station, Lyakhov and Mohmand returned to Earth in Soyuz TM-5, leaving the fresh TM-6 spacecraft at the station as their new lifeboat.[5] During the descent of TM-6 there were some technical problems, resulting in some tense moments as well as a day-long delay in landing.[5] Nevertheless, they landed safely on 7 September.

Spacewalks

The first spacewalk (also known as "Extra-vehicular activity", or EVA) of EO-3 took place on 26 February 1988 (4h 25m) replacing a segment on a solar cell. The second EVA was on 30 June 1988 (5h 10m) in which the replacement of a detector block on the Kvant-1 module failed. New tools were delivered to the station and with this the same work was then successful on 20 October 1988 (4h 12m).

End of mission

Mir EO-3 officially concluded on 21 December 1988, when Manarov and Titov returned to Earth in the Soyuz TM-6 spacecraft. The mission in total lasted for 365.94 days, the third longest of all the expeditions. Polyakov stayed aboard the station, and was transferred to Mir EO-4.

See also

References

  1. โ†‘ "Mir EO-3". Encyclopedia Astronautica. Archived from the original on 29 November 2010. Retrieved 15 November 2010.
  2. 1 2 D.S.F. Portee (1995). "Mir Hardware Heritage" (PDF). NASA. Archived from the original (PDF) on 7 September 2009. Retrieved 10 November 2010.
  3. โ†‘ "Salyut 6 EP-5-1". Encyclopedia Astronautica. Archived from the original on January 9, 2004. Retrieved 15 November 2010.
  4. โ†‘ "Mir EP-2". Encyclopedia Astronautica. Archived from the original on 8 January 2010. Retrieved 15 November 2010.
  5. 1 2 "Mir EP-3". Encyclopedia Astronautica. Archived from the original on 29 November 2010. Retrieved 15 November 2010.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.