New Darnytskyi Bridge

Новий Дарницький міст
New Darnytskyi Bridge pictured from its road deck looking eastwards.
Coordinates50°24′58″N 30°35′11″E / 50.41611°N 30.58639°E / 50.41611; 30.58639
CarriesRoad traffic, railway
CrossesDnieper River
LocaleKyiv, Ukraine
Official nameЗалізнично-автомобільний перехід у м. Києві
OwnerUkraine
Maintained byUkrzaliznytsia
Preceded byDarnytskyi Railroad Bridge
Characteristics
Designcantilever
MaterialConcrete, steel
Total length1,100 metres (3,600 ft)
History
Engineering design byKyivdniprotrans
Constructed byPlaneta-Mist
Construction start2004
Construction endJuly 2023
Opened2011
Inaugurated2010
Location

The New Darnytskyi Bridge (Ukrainian: Новий Дарницький міст) is a combined road and railroad bridge in Kyiv, the capital of Ukraine. It spans across the Dnieper River connecting the left and right banks of the city, the Darnytsia and Holosiiv districts of Kyiv, respectively. The bridge carries a double track rail line and is built to accommodate six lanes of road traffic.[1]

The bridge was completed in July 2023,[2] but operated in reduced capacity for months before, lacking road connection ramps from some directions. Additional railroad links to match the new bridges' capacity are also being constructed. The bridge's expected capacity is 60,000 vehicles and 120 pairs of trains per day,[3] which will serve as a major relief for both the Kyiv road and bridge network and as well as Ukraine's Ukrzaliznytsia national rail system.

Location and design

The new bridge was built 50 m (164 ft) north of the existing Darnytskyi Railroad Bridge.

History

The bridge construction is the initiative of the late Heorhiy Kirpa, the head of Ukrzaliznytsia and the Minister of Transportation in the early 2000s (hence the unofficial name).

The 1,100 m (3,609 ft)-span will cost an estimated $700 million. Its construction was ordered by the state-owned Ukrzaliznytsia rail company and financed by the government, but the Kyiv municipality co-sponsors the project. The main developer of the project is Kyivdniprotrans, and the main constructor is BMK Planeta-Mist.[1] Following the construction of the bridge, a new major passenger terminal will be completed in the Darnytsia Railway Station on the left bank of the city.

In July 2006 one third of the bridge was constructed and the first train was initially expected to run through the bridge in the second half of 2007.[4] However, in spring of 2007, cracks were discovered in the bridge's structure, delaying its construction. The bridge opening was then scheduled for March 2008. On May 7, 2010 the bridge was tested with first electrified train traffic.[3] On September 27, 2010 the railroad segment of the bridge was officially opened; on March 31, 2011, road traffic opened.[5] The bridge was scheduled for completion in 2012.[3]

In 2011, the Ukrainian government spent a total of ₴1.5 billion for the project.[5]

See also

References

  1. 1 2 "Projects of South-West railroad". South-West railroad (in Ukrainian).
  2. "Дарницький міст у Києві добудували" (in Ukrainian). Економічна правда. July 6, 2023.
  3. 1 2 3 Pivdenno-Zakhidna railways launches rail traffic on Darnytsky bridge, Kyiv Post (May 11, 2009)
  4. "The capital gradually solves its transportational problems". «Перший Нацiональний» First National (in Ukrainian).
  5. 1 2 "Cabinet Increases Financing Of Construction Of Darnytsia Bridge In Kyiv By 36% To UAH 1.5 Billion In 2011". Archived from the original on 2012-03-17. Retrieved 2011-12-22.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.