Peak Rail | |
---|---|
Commercial operations | |
Original gauge | 4 ft 8+1⁄2 in (1,435 mm) standard gauge |
Preserved operations | |
Operated by | Peak Rail |
Stations | 3 |
Length | 4.3 miles (6.9 km) |
Preserved gauge | 4 ft 8+1⁄2 in (1,435 mm) |
Commercial history | |
Opened | 1863 |
Closed | 1968 |
Preservation history | |
1987 | Acquires Darley Dale and track relay work begins |
1991 | Light Railway Order granted |
1992 | Re-opened |
1997 | Extended to Rowsley South |
2 July 2011 | Extended to Matlock |
Headquarters | Matlock |
Peak Rail is a preserved railway in Derbyshire, England, which operates a steam and heritage diesel service for tourists and visitors to both the Peak District and the Derbyshire Dales.
The preserved railway line is over 3+1⁄2 miles (5.6 km) in length and, as of April 2016, operates train services from Matlock station (shared with Derwent Valley Line services from Derby via Ambergate) via the site of Matlock Riverside and Darley Dale to Rowsley South.
Peak Rail intends to extend its operational services northward to Bakewell when resources allow, extending to a total of 4¼ miles (6.8 km). Beyond Bakewell, the railway trackbed is used by the Monsal Trail.
History
First preservation attempts with the Buxton Steam Centre
Peak Rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
In 1975, the Peak Railway Preservation Society was established and opened a site at the now-closed Buxton Steam Centre with restoration facilities and a 300-yard operating line. Proposals were put forward to extend the operating line onto the single track freight line towards Peak Forest, but were not met with success. However, a bridge was purchased and installed over Charles Street to reconnect to British Rail's Ashwood Dale route. The bridge was never used as the whole site was sold to Buxton Water who built a factory shortly after Peak Rail moved to Darley Dale using funds from the sale. The factory was demolished in 2011 and the site is vacant again and so available should Peak Rail ever reach Buxton.
The BBC reported in 2014 that the station site was proposed for redevelopment.[1]
The Buxton Advertiser reported in June 2019 that Peak Rail intended to reoccupy the Buxton site and start a new Buxton Branch within two months with the first priority being to clear the site.[2] The Peak Rail Association news quotes the support of the local MP[3] however the builder of a new development is causing difficulties with access.[4]
Closure of the Buxton Steam Centre and relocation to Darley Dale
In the 1980s, Peak Rail relocated its headquarters to Darley Dale and by 1991 the railway had reopened the section of line between Matlock Riverside and Darley Dale.
In 1997, the line was extended within a half-mile south of the Derbyshire village of Rowsley itself. A new station was constructed next to the site of the former loco shed at Rowsley South. The station was capable of holding long incoming charter trains and had a car park to accommodate a large number of cars and other vehicles. The station at Rowsley South has also been used for local charity events and cycle races, as well as steam and vintage vehicle rallies. With its location on the edge of the Peak District, the railway joins other attractions in the area, including Bakewell, Haddon Hall, Chatsworth House, the Rowsley shopping village, the village of Rowsley and the Cauldwell's Mill museum.
Extension to Matlock (Network Rail) station
After the construction of the Matlock by-pass, and the new Sainsburys supermarket in the former Cawdor Quarry, a new track alignment and track layout was installed between Matlock Riverside and Matlock (Network Rail) station to provide a new connection to the national network.
Discussions regarding access to the Matlock down platform have resulted in an agreed 50-year lease, including the re-connection of the Network Rail and Peak Rail metals. The rails were originally disconnected due to a rearrangement of Network Rail track as a part of other redevelopments in the area south of the present Matlock Riverside station. The extension to Matlock re-opened on 2 July 2011.
Future developments
In 2004, Derbyshire County Council published a study which concluded that reopening the former line for a local service was technically feasible and that the track bed should remain clear of development, but it was not an economic possibility in the near future.
Expansion towards Bakewell
- Phase 1 would restore and re-lay track to the site of Rowsley station in Rowsley itself.[5]
- Phase 2 would be reinstating a bridge over the A6 road joining up to Rowsley viaduct, along with restoration of both the viaduct and trackbed as far as a proposed Haddon Halt.
- Phase 3 would then be restoring both the old Haddon Tunnel and Coombes Road viaduct to former use before relaying track into the old station site and restoring the site to its former use.
Negotiations for the lease of the mile of trackbed to the north have resulted in the offer of a 99-year lease, from Rowsley South to Rowsley village. However, the extension is dependent on the required finance being raised or bequeathed.
Monsal Trail
Derbyshire County Council and the Peak Planning Board supported a scheme to develop the trackbed from Bakewell to Blackwell Mill as a cycle track, the Monsal Trail. With a stated aim to extend to Rowsley as part of the White Peak Loop Trail, the plans make no mention of the proposed railway extension beyond Rowsley village toward Bakewell.[6]
Signalling on the railway
There are four signal boxes on the route. Two boxes control the only two level crossings on the old Midland Railway main line route from Manchester to London St Pancras. The crossings are both in the Darley Dale area on the Peak Rail line. The third signal box at Rowsley is being commissioned to control the sidings and be a public viewing exhibit. This is the former Bamford signal cabin from the Hope Valley. There are plans at Rowsley South railway station for refurbishment and future operational use. The fourth cabin at Riverside came from Luffenham. It controls the Matlock connection to the national network.
- Matlock Riverside: an original British Rail cabin, formerly located at Luffenham junction. The restored cabin is mounted on a non prototypical stone-block base with an internal staircase to protect the box from vandalism, required due to its isolated location. The 19-lever frame was recovered from Glendon North Junction near Kettering. Mechanical interlocking allows the signals exiting and entering the loop via the Darley Dale end to be cleared in opposing directions when the cabin is switched out via the King locking lever.
- Darley Dale Crossing: controls the section from Darley Dale to Matlock Riverside under the one train staff key, as well as the other gated level crossing at Station Road. Based on an L.M.S. ground level design, it was erected in 2007 to replace the older Midland style replica cabin which had become life-expired.
- Darley Dale station: the passing loop at Darley Dale is worked using the Absolute Block method, with the signal box at the other end releasing the signal of the adjacent signal box to allow trains to enter the applicable up or down loop line. Due to the small length of the loop all signals are Home Starter combined signals, rather than the traditional separate distant, home and starter arrangements.
- Church Lane Crossing: controls the section from Darley Dale to Rowsley South under the electric key token block method, as well as the traditionally gated level crossing at Churchtown. Originally this signal box came from Gorsey Bank level crossing on the nearby Wirksworth branch. The signals here are Midland Railway lower quadrant examples on wooden posts dating from 1927. The signal box operates the first preserved example of a "Josslock" motor point, an electro-hydraulically worked electro-pneumatic point machine, whereby a standard electro-pneumatic point is driven by a hydraulic power pack.
- Rowsley South: The Cabin was originally located at Bamford before it was moved to the up platform at Darley Dale initially, though it was never commissioned. Eventually it was moved to Rowsley in January 2014, whereafter restoration began. It will be used to control the loco shed sidings and yard exits as a shunt frame using a unique now in the UK, though still widely used in Europe, double wire driven point operation using the ex Barrow Hill sidings turnover style lever frame kindly donated by the National Railway Museum and point operating gear which has now been installed at Rowsley.
Two train running
In late February 2007, the railway's 'Two-Train Running' project was completed and approved by HM Railway Inspectorate. Through improvements to infrastructure and signalling, this project allows two trains in steam on the line, using a refurbished and extended passing loop at Darley Dale. Each section of the railway is worked by a train staff, each with a key to operate the ground frames and electrical signal releases at the signal boxes and the ground frames at Rowsley South, Rowsley North, Darley South Yard sidings and Matlock Riverside.
Darley Dale footbridge
In mid-2009, the original ex-Midland Railway Darley Dale footbridge was purchased from the Midland Railway - Butterley with an aim towards restoration and eventual repositioning at its original location at Darley Dale. Part of this project requires the removal of the unused signal box structure to facilitate the erection of the footbridge. Fundraising for this project began in late 2009 and continues.
See also
References
- ↑ "Buxton water factory site £35m shops plan unveiled". BBC News. 30 August 2014.
- ↑ McVay, Ben (20 June 2019). "Peak Rail heritage train operator hopes to have Buxton branch open within the next two months". Buxton Advertiser. Archived from the original on 20 June 2019.
- ↑ "PRA Buxton Branch News". Peak Rail. 25 June 2019.
- ↑ "Plan to reopen steam rail line in Buxton blighted by builder". Buxton Advertiser. 11 June 2019. Archived from the original on 11 June 2019.
- ↑ "Design of (now completed) cycle path between Rowsley and Darley Dale showing route of Peak Rail phase 1 extension" (PDF). John Grimshaw Associates. August 2011. Retrieved 21 June 2020.
- ↑ "Extending the Monsal Trail: Bakewell to Rowsley via Haddon Hall Tunnel (Archaeological Survey)" (PDF). John Grimshaw Associates. March 2012. Retrieved 21 June 2020.
External links
- The Peak Rail website
- Today's Railways February 2007 article on Peak Rail, by kind permission of Platform 5 Publishing
- The Peak Rail Volunteering website
- Peak Rail's Signalling Department website
- Friends of the Derwent Valley Line
- County Council Feasibility Study Derbyshire County Council (2004) Derby to Manchester Railway Matlock to Buxton / Chinley Link Study. Main Report, Volume 1A: Version: Final. This report also has detailed plans of the line.
- The Andrew Briddon loco collection
- Unique tandem locos saved YouTube. Video shows the process of loading and carrying away half of the Ruston & Hornsby 165DE 0-4-0s 421439 and 423658 at the Scottish Railway Preservation Society for delivery to Peak Rail in September 2020.