Pittsburgh International Airport People Mover System | |
---|---|
Overview | |
Other name(s) | Pittsburgh Airport Tram |
Status | Active |
Owner | Pittsburgh Intl' Airport |
Line number | 2 Lines |
Locale | (PIT) Pittsburgh International Airport |
Termini |
|
Stations | 2 |
Website | bombardier.com |
Service | |
Type | Automatic Transit System |
System | Pittsburgh International Airport |
Services | 2 stops (2 trains run both directions) |
Train number(s) | 2 Trains |
Operator(s) | Bombardier |
Depot(s) | 1 (Located at the Landside Terminal) |
Rolling stock | 3 Cars Per Train (2 Sets Each) |
Daily ridership | 21,917.8082 (Divided By Passengers Annually) |
Ridership | 8 Million Passengers Annually |
History | |
Commenced | 1999 |
Opened | October 1, 1992 |
Closed | Most Likely 2025 |
Technical | |
Line length | 2600 Feet |
Number of tracks | 2 |
Character | Underground Guideway |
Minimum radius | Curves Slightly After Maintenance Shop and Near Airside Terminal [Near Ends of Tunnel] |
Electrification | Central Rail |
Operating speed | 32 mph (51 km/h)Peaks At 32 Mph |
Signalling | Computerized |
Highest elevation | 1,202 Airport Elevation (Below Ground Unknown) |
Maximum incline | 0° (Might Arc a Little) |
The Pittsburgh International Airport People Mover is a fully automated people mover system at the Pittsburgh International Airport serving Pittsburgh, Pennsylvania.
Designed and installed at a cost of $14 million by Adtranz (now Bombardier), it runs in two parallel tunnels to connect the landside terminal with the airside terminal.
History
The Pittsburgh International Airport People Mover began service upon the opening of the new Midfield Terminal on October 1, 1992, using Bombardier Innovia APM 100 vehicles.[1]
To handle increasing passenger traffic, a $9.5 million improvement project was undertaken in 1999.[2] A total of two cars were added to the people mover system; one was added to each train, turning each two-car train into a three-car train. The stations were then expanded to accommodate the extra cars. The project also included refurbishing of the original cars.
The proposed remodeling project for the airport, unveiled in 2017, planned to take the trams out of service permanently because the proposed Landside Terminal was slated to be connected to the existing Airside Terminal.
References
- ↑ "businessaircraft.bombardier.com/en/1_0/pdf/CX-100_System_Backgrounder_en.pdf" (PDF). Archived from the original (PDF) on 2011-07-08. Retrieved 2008-11-21.
- ↑ Pitz, Marylynne (1999-09-29), "Passengers take airport project in stride", Pittsburgh Post-Gazette, pp. C1, retrieved November 20, 2008