Overview | |
---|---|
Headquarters | Cairo |
Reporting mark | ENR |
Locale | Egypt |
Dates of operation | 1854–present |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Length | 5,625 kilometres (3,495 mi)[1] |
Other | |
Website | Egyptian National Railways |
Egyptian National Railways (ENR; Arabic: السكك الحديدية المصرية, romanized: Al-Sikak al-Ḥadīdiyyah al-Miṣriyyah) is the national railway of Egypt and managed by the parastatal Egyptian Railway Authority (ERA; Arabic: الهيئة القومية لسكك حديد مصر, romanized: Al-Haī'ah al-Qawmiyya li-Sikak Ḥadīd Miṣr, lit. 'National Agency for Egypt's Railways').
History
1833–1877
In 1833, Muhammad Ali Pasha considered building a railway between Suez and Cairo to improve transit between Europe and India. Muhammad Ali had proceeded to buy the rail when the project was abandoned due to pressure by the French who had an interest in building a canal instead.
Muhammad Ali died in 1848, and in 1851 his successor Abbas I contracted Robert Stephenson to build Egypt's first standard gauge railway. The first section, between Alexandria on the Mediterranean coast and Kafr el-Zayyat on the Rosetta branch of the Nile was opened in 1854.[3] This was the first railway in the Ottoman Empire as well as Africa and the Middle East.[4] In the same year Abbas died and was succeeded by Sa'id Pasha, in whose reign the section between Kafr el-Zayyat and Cairo was completed in 1856 followed by an extension from Cairo to Suez in 1858.[3] This completed the first modern transport link between the Mediterranean and the Indian Ocean, as Ferdinand de Lesseps did not complete the Suez Canal until 1869.
At Kafr el-Zayyat the line between Cairo and Alexandria originally crossed the Nile with an 80 feet (24 m) car float.[5] However, on 15 May 1858 a special train conveying Sa'id's heir presumptive Ahmad Rifaat Pasha fell off the float into the river and the prince was drowned.[5] Stephenson therefore replaced the car float with a swing bridge nearly 500 metres (1,600 ft) long.[5] By the end of Sa'id's reign branches had been completed from Banha to Zagazig on the Damietta branch of the Nile in 1860, to Mit Bera in 1861 and from Tanta to Talkha further down the Damietta Nile in 1863.[3]
Sa'id's successor Isma'il Pasha strove to modernise Egypt and added momentum to railway development. In 1865 a new branch reached Desouk on the Rosetta Nile and a second route between Cairo and Talkha was opened, giving a more direct link between Cairo and Zagazig.[3] The following year a branch southwards from Tanta reached Shibin El Kom.[3] The network started to push southwards along the west side of the Nile with the opening of the line between Imbaba near Cairo and Minya in 1867.[6] A short branch to Faiyum was added in 1868.[6] A line between Zagazig and Suez via Nifisha was completed in the same year.[3] The following year the line to Talkha was extended to Damietta on the Mediterranean coast and a branch opened to Salhiya and Sama'ana.[3]
Imbaba had no rail bridge across the Nile to Cairo until 1891.[5] However, a long line between there and a junction west of Kafr el-Zayyat opened in 1872, linking Imbaba with the national network.[3] From Minya the line southwards made slower progress, reaching Mallawi in 1870 and Assiut in 1874.[6] On the west bank till Najee Hammady from which goes on east bank of the Nile till Aswan. A shorter line southwards linked Cairo with Tura in 1872 and was extended to Helwan in 1875.[3] In the Nile Delta the same year a short branch reached Kafr el-Sheikh and in 1876 a line along the Mediterranean coast linking the termini at Alexandra and Rosetta was completed.[3]
1877–1888
By 1877, Egypt had a network of key main lines and the Nile Delta had quite a network, but with this and other development investments, Isma'il had gotten the country deeply into debt. For its first 25 years of operation Egypt's national railway had never even produced an annual report.[7] A Council of Administration with Egyptian, British and French members was appointed in 1877 to put the railway's affairs in order. They published its first annual report in 1879,[7] and in the same year, the British Government had Isma'il Pasha deposed, exiled and replaced with his son Tewfik Pasha. In 1882, the British essentially invaded and occupied Egypt.
With these developments, the Egyptian Railway Administration's rail network stagnated until 1888, but it also put its management in much better order.[7] In 1883 the ERA appointed Frederick Harvey Trevithick, nephew of Francis Trevithick, as Chief Mechanical Engineer.[8] Trevithick found a heterogeneous fleet of up to 246 steam locomotives of many different designs from very different builders in England, Scotland, France and the USA.[8] This lack of standardisation of locomotives or components complicated both locomotive maintenance and general railway operation.[8]
From 1877 to 1888, the ERA struggled to keep up with even basic maintenance[7] but by 1887 Trevithick managed to start a programme to renew 85 of the very mixed fleet of locomotives with new boilers, cylinders and motion.[8] He started to replace the others with four standard locomotive types introduced from 1889 onwards: one class of 0-6-0 for freight, one class of 2-4-0 for mixed traffic, one 0-6-0T tank locomotive for shunting and one class of only ten 2-2-2 locomotives for express passenger trains.[8] Trevithick ensured that these four classes shared as many common components as possible, which simplified maintenance and reduced costs still further.[8]
1888–1914
By 1888, the ERA was in better order and could resume expanding its network. In 1890 a second line between Cairo and Tura opened.[3] On 15 May 1892 the Imbaba Bridge was built across the Nile, linking Cairo with the line south following the west bank of the river.[5] The civil engineer for the bridge was Gustave Eiffel. (It was reformed and renewed in 1924 which is still the only railway bridge across the Nile in Cairo.) Cairo's main Misr Station was rebuilt in 1892. The line south was extended further upriver from Assiut reaching Girga in 1892, Nag Hammadi in 1896, Qena in 1897 and Luxor and Aswan in 1898.[6] With the railroad's completion, construction began the same year on the first Aswan Dam and the Assiut Barrage, main elements of a plan initiated in 1890 by the government[9] to modernize and more fully develop Egypt's existing irrigated agriculture, export potential, and ability to repay debts to European creditors.[10]
In the north in 1891, a link line was opened between Damanhur and Desouk.[3] The line to Shibin El Kom was extended south to Minuf in the same year and reached Ashum in 1896.[3] By then a line across the Nile Delta from a junction north of Talkha on the line to Damietta had reached Biyala.[3] By 1898 this reached Kafr el-Sheikh, completing a more direct route between Damietta and Alexandria.[3] An important extension along the west bank of the Suez Canal linking Nifisha with Ismaïlia, Al Qantarah West and Port Said was completed in 1904.[3] Thereafter network expansion was slower but two short link lines north of Cairo were completed in 1911 followed by a link between Zagazig and Zifta in 1914.[3]
Sinai
The first El Ferdan Railway Bridge over the Suez Canal was completed in April 1918 for the Palestine Military Railway.[5] It was considered a hindrance to shipping so after the First World War it was removed.[5] During the Second World War a steel swing bridge was built in 1942 but this was damaged by a steamship and removed in 1947.[5] A double swing bridge was completed in 1954 but the 1956 Israeli invasion of Sinai severed rail traffic across the canal for a third time.[5] A replacement bridge was completed in 1963[11] but destroyed in the Six-Day War in 1967. A new double swing bridge was completed in 2001 and is the largest swing bridge in the world.[11] However, the construction of the New Suez Canal has since disconnected the Sinai from the rest of Egypt’s rail network again. Instead of the bridge, two rail tunnels are planned under the canal, one near Ismailia and one in Port Said.
Historically, the Palestine Railways main line linked Al Qantarah East with Palestine and Lebanon. It was built in three phases during the First and Second World Wars. Commenced in 1916, it was extended to Rafah on the border with Palestine as part of the Egyptian Expeditionary Force's Sinai and Palestine Campaign against the Ottoman Empire. The route was extended through to Haifa in Mandate Palestine after World War I, to Tripoli, Lebanon in 1942 and became a vital part of the wartime supply route for Egypt.
As a result of the 1947–1949 Palestine war, the Palestine Railways main line was severed at the 1949 Armistice Line. The 1956 Israeli invasion severed Sinai's rail link with the rest of Egypt was reconnected its rail link with Israel. Israel captured a 4211 class 0-6-0 diesel shunting locomotive and five 545 class 2-6-0 steam locomotives.[12] Israel also captured rolling stock including a six-wheel coach dating from 1893 and a 30-ton steam crane built in 1950, both of which Israel Railways then appropriated into its breakdown fleet.[13] Before being forced to withdraw from Sinai in March 1957, Israel systematically destroyed infrastructure including the railway.[14] By 1963 the railway in Sinai was reconnected to the rest of Egypt but remained disconnected from Israel.
In the 1967 Six-Day War, Israel captured more Egyptian railway equipment including one EMD G8, four EMD G12 and three EMD G16 diesel locomotives[15] all of which were appropriated into Israel Railways stock. After 1967 Israel again destroyed the railway across occupied Sinai and this time used the materials in the construction of the Bar Lev Line of fortifications along the Suez Canal.
After long service on Israel Railways, the 30-ton crane, 1893 Belgian 6-wheel coach and one of the EMD G16 diesels are all preserved in the Israel Railway Museum in Haifa.[13]
Museum
Egypt's railway museum was built in 1932 next to Misr Station (now Ramses Station) in Cairo.[6][16] The museum opened in January 1933 to mark the city's hosting of the International Railway Congress.[6][16] Its stock of over 700 items[16] includes models, historic drawings and photographs.[6] Among its most prominent exhibits are three preserved steam locomotives:
Operations
In 2005 ENR operated 5,625 kilometres (3,495 mi) of standard gauge 1,435 mm (4 ft 8+1⁄2 in) track. Most of the rail system is focused on the Nile delta with lines essentially fanning out from Cairo. In addition, there is a line to the west along the coast that eventually could link to Libya as it did during World War II. From Cairo goes a major line south along the west bank and after Nag Hammadi along the east bank of the Nile to Aswan (Sellel) in Upper Egypt. Neighboring Israel uses the same standard gauge but has been disconnected since 1948.[18] In the South the railway system of Sudan operates on a narrow gauge and is reached after using the ferry past the Aswan dam. Rail service is a critical part of the transportation infrastructure of Egypt but of limited service for transit. 63 kilometres (39 mi) of the network is electrified, namely commuter lines between Cairo-Helwan and Cairo-Heliopolis.[18] As of today the total length of railways in Egypt is 10,500 kilometres (6,500 mi), with another 5,500 kilometres (3,400 mi) of railway lines are currently in construction.
ENR buys locomotives and rail abroad but passenger coaches are built and refurbished in Egypt by the Société Générale Egyptienne de Matériel de Chemins de Fer (SEMAF).[19]
Cargo volume transported by ENR is about 12 million tonnes annually.[19]
Services were severely disrupted during the political protests in early 2011; operating hours of the Cairo Metro were shortened to comply with the curfew.[20]
On 16 January 2015, Egyptian National Railways signed a €100 million contract with Alstom to supply signalling equipment for the 240 km Beni Suef-Asyut line and maintain services for five years. Also, Alstom will provide smartlock electronic interlocking system to replace the existing electromechanical system, which in turn will increase the number of trains that operate on the route by more than 80%.[21][22]
High-speed rail project
On 1 September 2021, the National Authority for Tunnels signed a $4.5 billion contract with Siemens Mobility, Orascom Construction S.A.E. and Arab Contractors to build and maintain a 660 km (410 mi) high-speed electrified line connecting Ain Sokhna to Mersa Matruh and Alexandria. The line has been dubbed "Green Line" or "Suez Canal on rails",[23][24] and is to be used by both freight and passenger trains. In addition to carrying out electrification and installation of ETCS Level 2, Siemens will supply Velaro high-speed trains, Desiro regional sets, and Vectron freight locomotives. Two further lines, one connecting the Greater Cairo region to Aswan, and Luxor via Hurghada to Safaga, were included in May 2022.[25][24][26]
Passenger trains
ER is the backbone of passenger transportation in Egypt with 800 million passengers annually.[19] Air-conditioned passenger trains usually have 1st and 2nd class service, while non-airconditioned trains have 2nd and 3rd class. Most of the network connects the densely populated area of the Nile delta with Cairo and Alexandria as hubs. Train fares in commuter trains and 3rd class passenger trains are kept low as a social service.
There are large volumes of tourist traffic during Eid; this causes problems due to a shortage of rolling stock.[27]
Sleeper trains
The Alexandria–Cairo–Luxor–Aswan route is served daily in both directions by air-conditioned sleeper trains of Abela Egypt.[28] This service is especially attractive to tourists who can spend the night on the train as it covers the stretch between Cairo and Luxor. A luxury express train also links Cairo with Marsa Matruh towards the Libyan border.
Locomotives
Current
The vast majority of ENR locomotives are diesel. These include:
Class | Image | Type | Top speed | Number | Remarks | Built | |
---|---|---|---|---|---|---|---|
mph | km/h | ||||||
EMD G12 | Bo-Bo Diesel locomotive | 97 | Numbers 3701-3797 | ||||
EMD G16 | Co-Co Diesel locomotive | 16 | Numbers 3301-3316 | 1960-1961 | |||
EMD G16W | Co-Co Diesel locomotive | 45 | Numbers 3317-3361 | 1964-1965 | |||
AA22T | Co-Co Diesel locomotive | 280 | Numbers 3001-3221 and 3241-3299 | 1976-1992 | |||
EMD G22 Series | Diesel locomotive | 32 | Numbers 3801-3832 | 1977 | |||
EMD G22CU | Diesel locomotive | ||||||
EMD G8 | Diesel locomotive | Numbered in 3200 series | |||||
GA DE900 | Bo-Bo Diesel locomotive | 30 | 2000 |
In 2009 ENR began taking delivery of 40 Electro-Motive Diesel JT42CWRM (Series 66) locomotives for passenger services.[29] In 2009, ENR received 80 dual cab ES40ACi locomotives in two versions (painted blue for passenger trains and red/black for freight trains).[30][31]
In 2017, Egyptian National Railways placed an order for 100 ES30ACi Light Evolution Series Locomotives valued at worth $575 million that can be used for both passengers or freight rail.[32] The first 10 units were delivered in November 2019.[33][34]
- GE_ES30ACi
- Class 66
- Henschel AA22T
- Diesel locomotive at Ramses Station, Cairo in 2005
- Henschel AA22T diesel locomotive in 2006
- 2160 working a passenger train near Aswan
Retired
Class | Image | Type | Top speed | Number | Remarks | Built | |
---|---|---|---|---|---|---|---|
mph | km/h | ||||||
545 | 2-6-0 Steam locomotive | 80 | Built by several companies | 1928-1931 | |||
8F | 2-8-0 Steam locomotive | 40 | Former War Department locomotives. Sold to Railways. Series 9301-915, 9317-9320, 9322-9342. |
1935-1946 | |||
1A-Do-A1 Diesel locomotive | 75 | 121 | 6 | Built by English Electric. UK. | 1945-1947 | ||
4211 | 0-6-0 Diesel locomotive | 42 | Built by Arnold Jung Lokomotivfabrik | 1953-1956 | |||
4300 | C diesel-hydraulic locomotive | 37 | 60 | 98 | Loosely based on Jung's WR 360 C14 series. In 1955 MÁVAG has won ENR's tender for 100 diesel-hydraulic shunting locomotives. Built by MÁVAG, and later by Ganz–MÁVAG. MÁVAG delivered 56 units between the end of 1957 and September 1958. Because of severe engine failures ENR temporarily halted the takeover of the rest of the units, until Ganz–MÁVAG redesigned the engine and replaced it on the already delivered units. Hungarian State Railways bought 6 units from ENR in late 1958. ENR later gave 5 units to the Helwan steel works. [35] | 1957–September 1958 1962 |
Bus and ferry services
ENR serves a number of places by bus services including Abu Simbel (bus/ferry), Sharm el Sheik, Siwa Oasis, and Hurghada. In 1936, the company owned 64 buses, 6 steamships, 12 barges, 18 pontoon boats.[36]
Accidents
Railways in Egypt have been notorious for many accidents mainly due to poor maintenance. The most recent accidents include:
- April 18, 2021 2021 Toukh train accident : At least 32 people are killed and 109 injured after a train derails in Toukh.[37]
- March 26, 2021 Sohag train collision: Two trains collide in the Tahta district of the Upper Egypt governorate of Sohag, resulting in 18 deaths and 200 injuries.[38]
- February 27, 2019 Ramses Station train collision
- August 11, 2017 Alexandria train collision
- January 14, 2013 Badrashin train accident
- November 17, 2012 Manfalut train accident: Train crashes into a bus carrying school children at a level crossing near Manfalut, killing 51 and injuring 17.
- October 25, 2009: Collision at Al-Ayyat in Giza, 50 kilometres (31 mi) south of Cairo. According to a security official an initial report stated that 30 people were suspected killed and 50 injured.[39]
- September 4, 2006: A passenger train collides with a freight train north of Cairo, killing five and injuring 30.[40]
- August 21, 2006 Qalyoub rail crash: Two trains collide in the town of Qalyoub, 20 kilometres (12 mi) north of Cairo, killing 57 people and injuring 128.
- February 20, 2002 Al Ayatt train disaster: A train packed to double capacity catches fire, 373 are killed.
- 2000: A train crashed into a minibus at an intersection south of Cairo, with 9 killed and two wounded.[41][42]
- November 1999: 10 killed between Cairo and Alexandria[43]
- April 1999: 10 killed in Northern Egypt head-on collision between two trains[43]
- 1998 Kafr Al-Dawar accident: "about 50" killed[41][43]
- 1997 2 major accidents: one with 14 killed, the other with 7 killed[41]
- 1995: Derailment just north of Cairo: 9 killed; Quesna accident (collision with bus): 49 killed; Beni Sweif accident: 75 killed[41][43]
- 1994 collision: more than 40 killed[41]
- 1993 collision: 40 killed[41]
- 1992 head-on collision at Badrashin: 43 killed[41]
Problems
The debacle of the 2002 Al Ayyat railway accident showed significant deficiencies in the status and maintenance of the equipment. In the aftermath, the ERA initiated a program to update equipment and improve safety.[19] While some services have been privatized (i.e. food service, sleeper trains), ENR is considering further steps in privatization to increase efficiency and improve service. In addition, ENR has dormant real estate holding that it plans to utilize in a more profitable way.
The 2006 Qalyoub train collision led to further criticism of the management of the ENR raising issues of underfunding and corruption.[44] The head of the ERA, Hanafy Abdel-Qawi, was dismissed one day after the accident.[45] In response to the accidents an investment programme was launched in 2007 with the aim of modernising the rail network and improving safety standards.[46]
Poor maintenance, lack of investment and negligent railway employees have led to frequent crashes on Egypt’s railway system. The 2002 Al Ayyat railway accident was the deadliest train disaster that killed over 373 people.[47]
Major stations
Most major lines originate from Ramses Station, Cairo or Misr Station, Alexandria:
Railway links to adjacent countries
- Libya – under construction (same gauge – 1,435 mm (4 ft 8+1⁄2 in)) (suspended)
- Sudan – none (break-of-gauge 1,435 mm (4 ft 8+1⁄2 in)/1,067 mm (3 ft 6 in)) (proposed)
- Gaza Strip – defunct since 1948
- Israel – defunct since 1948
Narrow gauge
There is a modest network of narrow gauge railways at Kurna, on the west Nile bank opposite Luxor. It has a gauge of 2 ft (610 mm) and is used for transporting sugar cane. A smaller network of the same gauge and for the same purpose exists on the east bank, around the southern outskirts of Luxor.
Haulage is by diesel locomotive. Rolling stock includes rakes of bogie bolster wagons, typically seen loaded high with sugar cane.
See also
References
- ↑ Directorate of Intelligence (14 November 2012). "The World Factbook - Egypt". Retrieved 29 November 2012.
- ↑ Strahan, Derek (2017). Lost Springfield, Massachusetts. Arcadia Publishing. p. 70. ISBN 9781467136662.
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Hughes, 1981, page 12
- ↑ Raafat, Jordan (5 March 1998). "Desert Train Heralds Train Tourism In Egypt". Jordan Star. Archived from the original on 7 December 2006. Retrieved 18 March 2007.
- 1 2 3 4 5 6 7 8 9 Hughes, 1981, page 17
- 1 2 3 4 5 6 7 Hughes, 1981, page 15
- 1 2 3 4 Hughes, 1981, page 13
- 1 2 3 4 5 6 Hughes, 1981, page 32
- ↑ Sidney Peel, The Binding of the Nile and the New Soudan, Oxford, 1904
- ↑ Ewald Bloche, Constructing Modern Egypt:Modernization and Development Discourses in the Context of British and Egyptian Water Engineering, p.6-7 (Abstract)
- 1 2 "El Ferdan Swing Bridge". Structurae. Nicolas Janberg Internet Content Services. 1998–2011. Retrieved 28 May 2011.
- ↑ Cotterell, 1984, page 137
- 1 2 "Gallery". Fun. Israel Railways. Archived from the original on 19 June 2012. Retrieved 25 May 2011.
- ↑ Chomsky, Noam (1983). The Fateful Triangle. New York: South End Press. p. 194. ISBN 0-89608-187-7.
- ↑ Cotterell, 1984, page 136
- 1 2 3 "Welcome to the ENR Museum Page". Egyptian National Railways. Egyptian National Railways. 2010. Archived from the original on 7 July 2011.
- 1 2 3 Proud & Smith, 1946, page 7
- 1 2 "CIA World Factbook". Retrieved 21 August 2006.
- 1 2 3 4 "Strategies to improve safety". Archived from the original on 10 September 2006. Retrieved 21 August 2006.
- ↑ "Egypt's Train Running Again". Railways Africa. Retrieved 19 February 2011.
- ↑ "Alstom wins €100m Egyptian signalling contract". Railway Gazette. 16 January 2015. Retrieved 9 February 2015.
- ↑ "Alstom to deliver signalling equipment for Egyptian Railway". railway-technology. Kable. 20 January 2015. Retrieved 9 February 2015.
- ↑ "High-speed train El Ain El Sokhna - Marsa Matrouh". National Authority for Tunnels. Retrieved 2022-08-18.
- 1 2 "Egypt signs €8 billion deal with Siemens for high-speed rail system | DW | 29.05.2022". DW.COM. 29 May 2022. Retrieved 30 May 2022.
- ↑ "Siemens Mobility secures high-speed rail contract in Egypt". Railway Technology. 30 May 2022. Retrieved 30 May 2022.
- ↑ "Siemens seals $8.5bln deal to build mega hi-speed rail in Egypt". Zawya. 29 May 2022. Retrieved 30 May 2022.
- ↑ "EGYPT'S LIMIT FOR EID IS 14 EXTRA TRAINS". Railways Africa. Retrieved 14 November 2010.
- ↑ "Abela sleeper trains". Retrieved 21 August 2006.
- ↑ "Commissioning of Egyptian JT42CWRM begins". Railway Gazette International. 20 May 2009. Archived from the original on 1 February 2011. Retrieved 5 November 2009.
- ↑ GE Transportation and Egyptian National Railways Announce the Completion of Commissioning of 80 Evolution Series Locomotives Archived 2013-08-17 at the Wayback Machine (2009-07-13)
- ↑ "RailPictures.Net » Photo Search Result » Railroad, Train, Railway Photos, Pictures & News". www.railpictures.net.
- ↑ "GE signs $575 million agreement with Ministry of Transportation and Egyptian National Railways to help transform rail infrastructure in Egypt". GE Transportation. 17 June 2017. Archived from the original on 21 June 2017.
- ↑ "Egypt receives first batch of General Electric locomotives in November". Egypt Independent. 5 October 2019.
- ↑ "Erie built locomotives arrive in Egypt". 5 December 2019.
- ↑ "Dimag.hu". dimag.hu. Retrieved 2022-08-14.
- ↑ World Survey of Foreign Railways. Transportation Division, Bureau of foreign and domestic commerce, Washington D.C. 1936. p. 153.
- ↑ "At least 32 people killed as train derails in Egypt". Al Arabiya English. 18 April 2021. Retrieved 18 April 2021.
- ↑ Mostafa Salem, Magdy Samaan and Lina Wardani. "Two trains collide in Egypt's Sohag governorate, killing dozens". CNN. Retrieved 26 March 2021.
- ↑ "Deadly train collision in Egypt". BBC. 25 October 2009. Retrieved 5 November 2009.
- ↑ "Five dead in Egypt rail accident". BBC. 5 September 2006. Retrieved 6 September 2006.
- 1 2 3 4 5 6 7 Fatemah Farag (28 February 2002). "One Way Ticket". Al-Ahram. Archived from the original on 13 October 2012. Retrieved 29 August 2006.
- ↑ "Suezbalady | السويس بلدي - بعض حوادث القطارات في مصر خلال الـ 20 عامًا الأخيرة ..!". Suezbalady | السويس بلدي.
- 1 2 3 4 "Egypt's history of train disasters". BBC News. 20 February 2002. Retrieved 24 August 2013.
- ↑ "Egypt's Minister Admits Railway Problems". Retrieved 29 August 2006.
- ↑ "National Rail Head fired over Train Tragedy". Egypt: The Daily Star. 23 August 2006. Archived from the original on 5 March 2008. Retrieved 30 August 2006.
- ↑ "Egyptian investment will raise safety standards". Railway Gazette International. August 2007. Archived from the original on 1 February 2011. Retrieved 30 August 2007.
- ↑ "Egypt:Fatal train crash kills 11". DW. Retrieved 18 April 2021.
Bibliography
- Cotterell, Paul (1984). The Railways of Palestine and Israel. Abingdon: Tourret Publishing. ISBN 0-905878-04-3.
- Goldfinch, Gary (2003). Steel in the Sand - The History of Egypt & its Railways. ISBN 1-900467-15-1.
- Hughes, Hugh (1981). Middle East Railways. Harrow: Continental Railway Circle. ISBN 0-9503469-7-7.
- Proud, Peter; Smith, C, eds. (1946). The Standard Gauge Locomotives of the Egyptian State Railways and The Palestine Railways 1942-1945. London: Railway Correspondence and Travel Society.
- Robinson, Neil (2009). World Rail Atlas and Historical Summary. Volume 7: North, East and Central Africa. Barnsley, UK: World Rail Atlas Ltd. ISBN 978-954-92184-3-5.
- Shimmin, Andrew D (2023). Locomotives of Egypt. Chippenham, Wilts, UK: Mainline & Maritime. ISBN 9781900340885.
- Wiener, Lionel [in French] (1932). L'Egypte et ses Chemins de Fer [Egypt and its Railways] (in French). Brussels: Weissenbruch. OCLC 901756499.