Susitna Dam (Devil's Canyon Dam)
Susitna Hydroelectric Project is located in Alaska
Susitna Hydroelectric Project
Location of the Susitna hydroelectric project in Alaska
LocationAlaska, United States
Coordinates62°49′22″N 148°32′55″W / 62.82278°N 148.54861°W / 62.82278; -148.54861
StatusScrapped
Dam and spillways
Type of damConcrete arch
ImpoundsSusitna River
Height735 ft (224 m)
Reservoir
Total capacity4,500,000 acre⋅ft (5.6 km3)
Surface area26,880 acres (10,880 ha)
Power Station
Hydraulic head550 ft (170 m)
Installed capacity600 MW
Annual generation2800 GWh (projected)

The Susitna Hydroelectric Project (commonly called the Susitna Dam or the Susitna-Watana Dam) was a proposed hydroelectric power project along the Susitna River in southern Alaska. The project, which originally consisted of two dams along the river, was proposed as early as the 1960s by the U.S. Bureau of Reclamation to supply electricity to the railbelt region of Alaska (areas served by the Alaska Railroad), including the cities of Anchorage and Fairbanks. At the time, it was known as the Devil's Canyon Dam, for its location just upstream of Devils Canyon, a 1,000-foot (300 m)-deep gorge and whitewater rapids formed by the Susitna River. When oil prices and state revenue (based on taxes levied on oil extraction) declined, the plan was put on hold. When oil prices rose to then-record highs in 2008, the rising price of electricity in Alaska caused a revival of interest in the proposal.

The Susitna Hydroelectric project, to be built by the Alaska Energy Authority, was projected to cost $5.2 billion. A 735-foot (224 m) dam would be built on the Susitna River about 120 miles (190 km) north of Anchorage, forming a 42-square-mile (110 km2) reservoir. The dam would consistently produce between 280 and 300 megawatts of power, or about 2,800 GWh per year. The dam would be designed to accommodate a future height increase to 880 feet (270 m). Electricity from the dam would supply about two-thirds of Alaska's population. The alternative is use of natural gas as fuel for generators. Whether to build a natural gas pipeline is also at issue.[1]

The Susitna river, which drains into the Cook Inlet, is a major salmon spawning ground. The site of the proposed dam is upstream of the breeding grounds of salmon, but if the dam is constructed the pattern of flow in the river will change due to operation of the dam.[1]

On June 29, 2016, Alaska's governor Bill Walker vetoed the construction of the dam. The reasons were both environmental and economic. [2][3]

Notes

  1. 1 2 Felicity Barringer (March 6, 2013). "Proposed Dam Presents Economic and Environmental Challenges in Alaska". The New York Times. Retrieved March 7, 2013.
  2. "Your Dedicated Source of Hydropower News". Archived from the original on 2017-01-18.
  3. "No Su Dam: Alaskan governor cancels Susitna River hydro project". 30 June 2016.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.