Tash-Kömür Hydro Power Plant
Official nameТашкумырская ГЭC
Country
LocationTash-Kömür
Coordinates41°24′13″N 72°13′55″E / 41.40361°N 72.23194°E / 41.40361; 72.23194
StatusOperational
Commission date1985-1987
Thermal power station
Primary fuelHydropower
Power generation
Units operational3
Nameplate capacity450 MW

The Tash-Kömür Hydro Power Plant (Kyrgyz: Таш-Көмүр ГЭСи, Russian: Таш-Кумырская ГЭС) is a hydroelectric power plant on the river Naryn in Tash-Kömür, Kyrgyzstan. Completed between 1985 and 1987, it is one of the three hydro power plants on the river Naryn near Tash-Kömür, 14 km upstream from the Shamaldy-Say Hydroelectric Power Station.[1] It has 3 individual turbines with a nominal output of around 150 MW and a total nominal capacity of 450 MW.[1] The power plant's dam is 75 m (246 ft) tall and it creates a 140,000,000 m3 (113,500 acre⋅ft) reservoir of which 10,000,000 m3 (8,107 acre⋅ft) is active (or useful) for power generation.[2]

References

  1. 1 2 "Tash-Kömür cascade of HPP" (in Russian). Energo-ES. Retrieved 14 January 2022.
  2. "List of major hydroelectric facilities Kyrgyzskoy Republic" (PDF) (in Russian). CA Water. Retrieved 24 February 2012.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.